vid = 1674pws_id = 350293pws_id = 350293
--------------------------------------------------------
Not Logged on, Max pages: 5( 1 Seen ) ID:1969 Ind:1 IP: 54.91.121.255YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Blyth Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Blyth Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Blyth Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, North East England    
Type of installation: Wind    on/offshore: off
Turbines :2  Capacity : 4 MW
Approx Date of 1st power generation: June 2000

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Blyth offshore wind farm was opened in December 2000, and the plant has been producing enough clean and renewable electricity to power 3,000 average households ever since. The turbines were manufactured by Danish wind energy company Vestas, and installed by the marine division of AMEC Capital Projects and Seacore.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Blyth DECC Reference:A0439

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Blyth : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 6
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 25/04/2019
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 6 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 350293


Weather Station Name : Bedlington Latitude: 55.1316 Longitude: -1.5979 Elevation: 59

DateWind DirectionWind SpeedStart / StopCapacity Factor Output MW/hrGenerated MWhrs
12/07/2018 09:00:00NNE 7 5 / 25 0
12/07/2018 12:00:00NE 7 5 / 25 0
12/07/2018 15:00:00NE 9 5 / 25 0
12/07/2018 18:00:00NE 9 5 / 25 0
12/07/2018 21:00:00NNE 4 5 / 25 0
13/07/2018NNW 2 5 / 25 0
13/07/2018 03:00:00N 2 5 / 25 0
13/07/2018 06:00:00NE 2 5 / 25 0
13/07/2018 09:00:00ENE 4 5 / 25 0
13/07/2018 12:00:00ESE 7 5 / 25 0
13/07/2018 15:00:00ESE 7 5 / 25 0
13/07/2018 18:00:00SE 9 5 / 25 0
13/07/2018 21:00:00SE 7 5 / 25 0
14/07/2018SSW 4 5 / 25 0
14/07/2018 03:00:00SW 4 5 / 25 0
14/07/2018 06:00:00WSW 7 5 / 25 0
14/07/2018 09:00:00WSW 7 5 / 25 0
14/07/2018 12:00:00SW 7 5 / 25 0
14/07/2018 15:00:00SW 7 5 / 25 0
14/07/2018 18:00:00SW 7 5 / 25 0
14/07/2018 21:00:00SW 4 5 / 25 0
15/07/2018SW 4 5 / 25 0
15/07/2018 03:00:00SSW 4 5 / 25 0
15/07/2018 06:00:00SW 4 5 / 25 0
15/07/2018 09:00:00SSW 7 5 / 25 0
15/07/2018 12:00:00SSW 7 5 / 25 0
15/07/2018 15:00:00S 7 5 / 25 0
15/07/2018 18:00:00SSW 7 5 / 25 0
15/07/2018 21:00:00SW 4 5 / 25 0
16/07/2018S 4 5 / 25 0
16/07/2018 03:00:00S 4 5 / 25 0
16/07/2018 06:00:00SSE 4 5 / 25 0
16/07/2018 09:00:00ESE 4 5 / 25 0
16/07/2018 12:00:00SE 7 5 / 25 0
16/07/2018 15:00:00SSW 7 5 / 25 0
16/07/2018 18:00:00SSE 7 5 / 25 0
16/07/2018 21:00:00ENE 4 5 / 25 0
Project Info
World's biggest wind turbine that is taller than CANARY WHARF
General Electric has signed a five-year agreement with the UK government It will test its 853ft turbine, called Haliade-X 12, in BLYTH, Northumberland It is nearly 150ft taller than the largest wind turbines currently in operation

BLYTH 4MW Offshore Wind

BLYTH Offshore Wind Turbines

Essential Spark - critique

Another record year for Port of BLYTH as turnover hits 17.5m
The RES Group is looking to build a 350m biomass power station there, and another scheme involves Lynemouth Power Station, which aims to convert to biomass by 2015.

©2018 Simon Mallett
Latest News Added
People voice worries over impact of massive offshore wind farm
The open floor hearing into Vattenfall's application to build the Norfolk Vanguard wind farm off the coast of Happisburgh took place at Dereham Sixth Form College.
Source: edp24, Date and Time of entry: 25 April 2019 00:00

Rolling road blocks could hit Shropshire border routes
The Clocaenog Forest wind farm will see 27 turbines put up within the forest near the popular Llyn Brenig beauty spot in Denbighshire.
Source: shropshirestar, Date and Time of entry: 25 April 2019 00:00

Concrete pours start at 27-turbine Clocaenog Forest Wind Farm
Concrete pours to construct the turbine bases at Clocaenog Forest Wind Farm have started, and the civil engineering contractor is using on-site batching plants to reduce vehicle journeys.
Source: jones-bros, Date and Time of entry: 25 April 2019 00:00

Britain breaks coal-free power record over Easter weekend
Britain has broken its record for the longest continuous period without generating electricity from coal. National Grid said that the coal-free period lasted more than 90 hours before coming to an end on Monday afternoon.
Source: bbc, Date and Time of entry: 24 April 2019 00:00

Wind farm developer considers subsidy bid
THE TEAM behind the proposed Mossy Hill wind farm says it is now considering its bid for government subsidy after the development received planning permission.
Source: shetlandnews, Date and Time of entry: 24 April 2019 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School