vid = 1826pws_id = 353525pws_id = 353525
--------------------------------------------------------
Not Logged on, Max pages: 5( 1 Seen ) ID:6877 Ind:1 IP: 35.175.182.106YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Sheerness Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Sheerness Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Sheerness Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Sheerness, Sheppy, Kent    
Type of installation: Wind    on/offshore: on
Turbines :4  Capacity : 10 MW
Approx Date of 1st power generation: January 2016

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The proposed scheme will consist of four 2.5–3-MW turbines, each with a total maximum height of 125m. The wind farm is expected to produce enough power for 5500 homes, which equates to 13% of the wind energy target for the Kent region.
Planning permission was granted in March 2009. A number of technical studies have been undertaken and are ongoing. Procurement will commence during 2014 with construction planned in 2015.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Sheerness DECC Reference:A0446

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Sheerness : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 17.5
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 21 m/s (46.977 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 09/12/2018
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 17.5 start: 5 Optimum: 15/ Stop: 21 / wind: / ratio 353525


Weather Station Name : Sittingbourne Latitude: 51.3399 Longitude: 0.7333 Elevation: 20

DateWind DirectionWind SpeedStart / StopCapacity Factor Output MW/hrGenerated MWhrs
12/07/2018 09:00:00N 4 5 / 21 0
12/07/2018 12:00:00NNE 2 5 / 21 0
12/07/2018 15:00:00ENE 4 5 / 21 0
12/07/2018 18:00:00E 7 5 / 21 0
12/07/2018 21:00:00E 7 5 / 21 0
13/07/2018E 4 5 / 21 0
13/07/2018 03:00:00E 2 5 / 21 0
13/07/2018 06:00:00ENE 4 5 / 21 0
13/07/2018 09:00:00ENE 7 5 / 21 0
13/07/2018 12:00:00ENE 7 5 / 21 0
13/07/2018 15:00:00ENE 9 5 / 21 0
13/07/2018 18:00:00E 7 5 / 21 0
13/07/2018 21:00:00E 4 5 / 21 0
14/07/2018ESE 4 5 / 21 0
14/07/2018 03:00:00ESE 4 5 / 21 0
14/07/2018 06:00:00ESE 4 5 / 21 0
14/07/2018 09:00:00E 2 5 / 21 0
14/07/2018 12:00:00E 4 5 / 21 0
14/07/2018 15:00:00ESE 7 5 / 21 0
14/07/2018 18:00:00SE 7 5 / 21 0
14/07/2018 21:00:00SSE 7 5 / 21 0
15/07/2018S 4 5 / 21 0
15/07/2018 03:00:00SSW 4 5 / 21 0
15/07/2018 06:00:00SW 2 5 / 21 0
15/07/2018 09:00:00S 2 5 / 21 0
15/07/2018 12:00:00SSE 4 5 / 21 0
15/07/2018 15:00:00SE 7 5 / 21 0
15/07/2018 18:00:00SE 9 5 / 21 0
15/07/2018 21:00:00SSE 7 5 / 21 0
16/07/2018S 4 5 / 21 0
16/07/2018 03:00:00SSE 4 5 / 21 0
16/07/2018 06:00:00S 4 5 / 21 0
16/07/2018 09:00:00S 4 5 / 21 0
16/07/2018 12:00:00S 7 5 / 21 0
16/07/2018 15:00:00NNE 7 5 / 21 0
16/07/2018 18:00:00SSE 7 5 / 21 0
16/07/2018 21:00:00S 7 5 / 21 0
Project Info
Peel Energy, Port of SHEERNESS

Port of Sheernes Wind Farm

Wind farm plans to get green light?

Middlewick Wind Farm – Construction Update
The turbine blades were manufactured by Siemens in the USA; they were delivered by sea and offloaded at SHEERNESS, Kent.

Vestas wind turbine plant in Kent given approval
A plan to build wind turbines in Kent, with the creation of about 1,600 jobs, has been given approval. Vestas, which supplies 40% of the world's offshore turbines, wants to build a new site at SHEERNESS Dock on the Isle of Sheppey.

©2018 Simon Mallett
Latest News Added
Norfolk Vanguard
The 1.8 gigawatt (GW) capacity project would meet the equivalent electricity needs of 5% of UK households* - around 1.3 million homes.
Source: vattenfall, Date and Time of entry: 16 November 2018 00:00

Tangy Repower
In August 2018, SSE submitted a Section 36 Application to Scottish Ministers seeking consent to replace the existing 22 operational turbines for 16 modern, more efficient machines.
Source: sse, Date and Time of entry: 16 November 2018 00:00

Plans to expand Crystal Rig wind farm lodged
A bid has been lodged to expand a wind farm in the Lammermuir Hills, taking its turbine total to more than 100.
Source: bbc, Date and Time of entry: 16 November 2018 00:00

Extra 11 turbines at Crystal Rig wind farm
Fred Olsen Ltd, has submitted an application to the Scottish Government’s Energy Consents Unit for an additional 11 turbines to the south of the current wind farm site that has 91 turbines, developed in three separate stages.
Source: berwickshire news, Date and Time of entry: 16 November 2018 00:00

Heckington Fen Onshore Wind Farm
Application under section 36C to Vary the Existing s.36 Consent for the Heckington Fen Wind Farm (‘the Variation Application’)
Source: ecotricity, Date and Time of entry: 28 June 2018 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School