Loading
Page views this IP this session = of 10 unsubscribed pagesLenham Solar Farm DECC / 1816 : East Lenham Solar Farm; 6.6; Operational OFGem / RO : R00287RUEN; Lenham Farm Solar Park; 5.66MW OFGem / REGO : G05433PVEN; Lenham Farm Solar Park; 5.66MW
Lenham Solar Farm (Solar , Active) Location in the UK : England, Lenham Kent Type of installation: Solar on/offshore: on Solar Panels :16000 Capacity : 6 MW Approx Date of 1st power generation: June 2014
/YES
February 2014: Under construction: can be seen with difficulty from Pilgrims Way alongside the North Downs above Lenham, ie well screened.
Missed the August 2011 deadline for the higher level FITs but as at 15 March 2012, still being planned with general support within the village. Solar Panels as a community benefit fitted on the Village Hall included as part of the overall deal have yet to be fitted.
Recent planning applications for CCTV and yard. Accepted.
The plan will involve the installation of 20,000 solar panels, each panel with a nominal 0.2kW meaning the solar array could have a potential output of 4MW.
Background: A local farmer, Andrew Barr, is working with Kronos Solar to develop a solar park next to Ham Lane in Lenham. The park will be near an existing electricity sub station, at the time of initial proposal, would have been one of the largest solar parks in the UK, realistically at 4MW, effectively a standard sized solar park. East Lenham Farm East Lenham Road Lenham Maidstone Kent ME17 2DP
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
East Lenham Solar Farm 6.6 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Kent Country: England LPA: Maidstone Borough Council
|
Site ID and Reference: |
1816 / AA666
District:
|
Applicant: |
Laurence Associates
Application :
12/0013
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
East Lenham Farm, East Lenham Road, Lenham, Maidstone, Kent,
|
|
ME17 2DP
|
County: |
Kent Region: South East
|
OS Coordinates: |
589450 / 589450
|
Development Status: |
Operational
|
Application Submitted: |
1/20/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
2/1/2014
|
|
|
Generator Live |
3/30/2014
|
This Record Last Updated: |
9/29/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Lenham Farm Solar Park
|
Generator Type: |
Photovoltaic (RO code = RU)
|
Scheme : |
RO
|
Generator ID: |
R00287RUEN
|
Capacity: |
5660
|
Status: |
Live
|
Accreditation Date: |
1/20/2012
|
|
|
Commission Date: |
3/30/2014
|
|
|
Applicant: |
Octopus Investments Limited
|
Applicant Address: |
6th Floor, 33 Holborn
London
EC1N 2HT
England
|
Address: |
Lenham Farm Solar Park
Lenham Heath Road
Lenham
ME17 2HT
England
|
Site Name: |
Lenham Farm Solar Park
|
Generator Type: |
Photovoltaic
|
Scheme : |
REGO
|
Generator ID: |
G05433PVEN
|
Capacity: |
5660
|
Status: |
Live
|
Accreditation Date: |
1/20/2012
|
|
|
Commission Date: |
3/30/2014
|
|
|
Applicant: |
Octopus Investments Limited
|
Applicant Address: |
6th Floor, 33 Holborn
London
EC1N 2HT
England
|
Address: |
Lenham Farm Solar Park
Lenham Heath Road
Lenham
ME17 2HT
England
|
|
Assumptions: Capacity: 5660kW 5.66 MW, Thus over the month Capacity * 720 hours per month = 4075.2 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 388 | 6.86% | Issued | 01/02/2018 | | | 415 | 7.33% | Issued | 01/01/2018 | | | 174 | 3.07% | Issued | 01/12/2017 | | | 139 | 2.46% | Issued | 01/11/2017 | | | 279 | 4.93% | Issued | 01/10/2017 | | | 372 | 6.57% | Issued | 01/09/2017 | | | 590 | 10.42% | Issued | 01/08/2017 | | | 770 | 13.60% | Issued | 01/07/2017 | | | 866 | 15.30% | Issued | 01/06/2017 | | | 947 | 16.73% | Issued | 01/05/2017 | | | 822 | 14.52% | Issued | 01/04/2017 | | | 813 | 14.36% | Issued | 01/03/2017 | | | 595 | 10.51% | Redeemed | 01/02/2017 | | | 215 | 3.80% | Redeemed | Dec-16 | 0 | 231 | 153 | 2.70% | Issued | Nov-16 | 0 | 408 | 262 | 4.63% | Issued | Oct-16 | 0 | 750 | 474 | 8.37% | Issued | Sep-16 | 0 | 985 | 620 | 10.95% | Issued | Aug-16 | 0 | 1407 | 620 | 10.95% | Issued | Jul-16 | 0 | 1448 | 905 | 15.99% | Issued | Jun-16 | 0 | 1192 | 745 | 13.16% | Issued | Jun-16 | 0 | 1192 | 745 | 13.16% | Issued | May-16 | 0 | 1109 | 693 | 12.24% | Issued | Apr-16 | 0 | 1117 | 703 | 12.42% | Issued | Mar-16 | 0 | 904 | 571 | 10.09% | Issued | Feb-16 | 0 | 451 | 288 | 5.09% | Issued | Jan-16 | 0 | 277 | 180 | 3.18% | Issued | Dec-15 | 0 | 151 | 102 | 1.80% | Redeemed | Nov-15 | 0 | 246 | 161 | 2.84% | Redeemed | Oct-15 | 0 | 636 | 403 | 7.12% | Redeemed | Sep-15 | 0 | 1070 | 674 | 11.91% | Redeemed | Aug-15 | 0 | 1125 | 708 | 12.51% | Redeemed | Jul-15 | 817 | 1308 | 817 | 14.43% | Redeemed | Jun-15 | 977 | 1563 | 977 | 17.26% | Redeemed | May-15 | 825 | 1314 | 825 | 14.58% | Retired | Apr-15 | 887 | 1411 | 887 | 15.67% | Redeemed | Mar-15 | 621 | 983 | 621 | 10.97% | Redeemed | Feb-15 | 306 | 478 | 306 | 5.41% | Redeemed | Jan-15 | 182 | 277 | 181 | 3.20% | Redeemed | Dec-14 | 164 | 249 | 164 | 2.90% | Redeemed | Nov-14 | 194 | 300 | 194 | 3.43% | Redeemed | Oct-14 | 371 | 583 | 370 | 6.54% | Redeemed | Sep-14 | 533 | 845 | 533 | 9.42% | Redeemed | Aug-14 | 766 | 1220 | 766 | 13.53% | Redeemed | Jul-14 | 908 | 1453 | 908 | 16.04% | Redeemed | Jun-14 | 746 | 1194 | 746 | 13.18% | Redeemed | May-14 | 827 | 1315 | 826 | 14.59% | Redeemed | Apr-14 | 523 | 830 | 523 | 9.24% | Redeemed | Mar-14 | 36 | 59 | 37 | 0.65% | Expired |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|