Harringe Brooks Wind Farm (Wind , Proposed) Location in the UK : England, Sellinge, Kent, Type of installation: Wind on/offshore: on Turbines :6 Capacity : 15 MW Approx Date of 1st power generation:
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Initial research suggests that the site could generate enough green energy to power an estimated average 10,000 homes, just from the wind blowing naturally over the site.
This design will generate around 49.13 million units (kWh) of electricity every year which based upon the average household consumption of 4,152kWh/household provides for the equivalent of 11,800 homes per annum. This is a sizeable contribution to the renewable needs of the Shepway District
Model: |
Wind Turbine- Generic
|
Start Speed: |
5
|
Capacity: |
2
|
Optimal Speed: |
15
|
Rotor Diameter: |
100
|
Stop Speed: |
25
|
Hub Height |
80 Avg for all turbines:
|
Avg. Elevation: |
|
Web Page: |
|
Comment: |
|
Sellinge, Kent,
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Harringe Brooks Wind Park 15 MW
|
Energy Type: |
Wind Onshore |
County: |
Kent Country: England LPA: Folkstone and Hythe District Council
|
Site ID and Reference: |
4187 / AA793
District:
|
Applicant: |
Ecotricity
Application :
Y12/0451/SH
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
6 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
125 |
Calculated capacity: |
15 |
Site Address: |
Land 500M South West Otterpool Manor Barn (adj. Harringe Brooks Wood) Otterpool Lane Sellindge Kent
|
|
|
County: |
Kent Region: South East
|
OS Coordinates: |
610455 / 610455
|
Development Status: |
Planning Application Submitted
|
Application Submitted: |
5/16/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
6/21/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|