Loading
Page views this IP this session = 1 of 10 unsubscribed pagesKentish Flats Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Kentish Flats Wind Farm (Wind , Active) Location in the UK : England, whitstable Kent Type of installation: Wind on/offshore: off Turbines :45 Capacity : 90 MW Approx Date of 1st power generation: October 20015
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
(Dec 2013) Vestas has received a firm and unconditional order for 15 V112-3.3 MW offshore turbines for the extension of the Kentish Flats wind farm off the coast of the UK.
As at 2008 the largest wind farm in the UK (now Lynn & Inner Dowsing). Visible from most of the North Kent Coast all the way inland to the top of the North Downs.
It is expected to produce 285MW of electricity every year, enough to power 100,000 homes.
An additional 15 Wind Turbines are to be added
Model: |
Vestas V90
|
Start Speed: |
3.5
|
Capacity: |
3
|
Optimal Speed: |
15
|
Rotor Diameter: |
90
|
Stop Speed: |
25
|
Hub Height |
70 Avg for all turbines:70
|
Avg. Elevation: |
-3
|
Web Page: |
http://www.vestas.com/en/wind-power-plants/procurement/turbine-overview/v90-3.0-mw.aspx#/vestas-univers |
Comment: |
The V90-3.0 MW is designed to be low weight, making it easier to transport and install and reducing foundation costs thanks to its lower load.
|
Kentish Flats in Thames Estuary 8km north Herne Bay CT6 7NU England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Kentish Flats 2 49.5 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: The Planning Inspectorate - National Infrastructure
|
Site ID and Reference: |
2504 / A0371
District:
|
Applicant: |
Vattenfall
Application :
EN010036
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
15 |
Turbine Capacity: |
3.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
49.5 |
Site Address: |
Kentish Flats Offshore extension
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
614105 / 614105
|
Development Status: |
Operational
|
Application Submitted: |
6/1/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
11/26/2014
|
|
|
Generator Live |
9/14/2015
|
This Record Last Updated: |
6/28/2016
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Kentish Flats 90 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: DECC (S36)
|
Site ID and Reference: |
2492 / N00439W
District:
|
Applicant: |
Vattenfall
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
30 |
Turbine Capacity: |
3 |
Height of Turbines: |
|
Calculated capacity: |
90 |
Site Address: |
Saltend, Thames Estuary, North Sea
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
615015 / 615015
|
Development Status: |
Operational
|
Application Submitted: |
8/15/2002
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
6/1/2004
|
|
|
Generator Live |
9/10/2005
|
This Record Last Updated: |
10/27/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Kentish Flats Extension Wind Farm
|
Generator Type: |
Off-shore wind (REGO code = FW)
|
Scheme : |
REGO
|
Generator ID: |
G01174FWEN
|
Capacity: |
49500
|
Status: |
Live
|
Accreditation Date: |
8/15/2002
|
|
|
Commission Date: |
9/1/2015
|
|
|
Applicant: |
Vattenfall Wind Power Ltd
|
Applicant Address: |
1st Floor
1 Tudor Street
London
EC4Y 0AH
England
|
Address: |
Kentish Flats Windfarm Extension
Herne Bay Grid, Thornden Wood Road
Herne Bay
CT6 7NU
England
|
|
Assumptions: Capacity: 49500kW 49.5 MW, Thus over the month Capacity * 720 hours per month = 35640 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 17182 | 34.71% | Issued | 01/02/2018 | | | 19448 | 39.29% | Issued | 01/12/2017 | | | 22063 | 44.57% | Issued | 01/11/2017 | | | 17219 | 34.79% | Issued | 01/10/2017 | | | 20680 | 41.78% | Issued | 01/09/2017 | | | 11908 | 24.06% | Issued | 01/08/2017 | | | 10638 | 21.49% | Issued | 01/07/2017 | | | 13198 | 26.66% | Issued | 01/06/2017 | | | 13741 | 27.76% | Issued | 01/05/2017 | | | 12814 | 25.89% | Issued | 01/04/2017 | | | 9431 | 19.05% | Issued | 01/03/2017 | | | 19499 | 39.39% | Issued | 01/02/2017 | | | 18240 | 36.85% | Issued | 01/01/2017 | | | 13867 | 28.01% | Issued | Dec-16 | 0 | 24302 | 12790 | 25.84% | Issued | Nov-16 | 0 | 33651 | 17711 | 35.78% | Issued | Oct-16 | 0 | 26915 | 14166 | 28.62% | Issued | Sep-16 | 0 | 22842 | 12022 | 24.29% | Issued | Aug-16 | 0 | 25734 | 13544 | 27.36% | Issued | Jul-16 | 0 | 21840 | 11495 | 23.22% | Issued | Jun-16 | 0 | 18285 | 9624 | 19.44% | Issued | Jun-16 | 0 | 18285 | 9624 | 19.44% | Issued | May-16 | 0 | 24122 | 12696 | 25.65% | Issued | May-16 | 0 | 24122 | 12696 | 25.65% | Issued | Apr-16 | 0 | 24893 | 13102 | 26.47% | Issued | Mar-16 | 0 | 31401 | 16527 | 33.39% | Issued | Feb-16 | 0 | 35434 | 18650 | 37.68% | Issued | Jan-16 | 0 | 44467 | 23404 | 47.28% | Issued | Dec-15 | 0 | 51751 | 27237 | 55.02% | Redeemed | Nov-15 | 0 | 42706 | 22477 | 45.41% | Redeemed | Oct-15 | 0 | 22953 | 12080 | 24.40% | Redeemed | Sep-15 | 0 | 18272 | 9617 | 19.43% | Redeemed |
|
Capacity: 270.6 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/29/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|