Page views this IP this session = 1 of 10 unsubscribed pagesMarshborough Solar Farm
Marshborough Solar Farm (Solar , Active) Location in the UK : England, Marshborough Sandwich Type of installation: Solar on/offshore: on Solar Panels :12800 Capacity : 12.7 MW Acreage:50 or approx Hectares : 20 Approx Date of 1st power generation: November 2015
/YES
A revised application is being submitted. Has been accepted. The development is smaller and towards the Ash Road.
Construction due to start July / August 2015
Each array would measure 3.3m wide by 12.3m long, tilted at 15° from the horizontal and have a maximum height of 1.7m above ground level.
The developers say there are only a few residential dwellings from which the solar farm would be visible. The nearest dwellings lie 150m to the north-west off the A257. Land at Marshborough Farm Woodnesborough CT3 2BZ England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Marshborough Farm solar park 5 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Kent Country: England LPA: Dover District Council
|
Site ID and Reference: |
5117 /
District:
|
Applicant: |
Vogt Solar
Application :
15/00115
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Land at Marshborough Farm, Marshborough, Sandwich
|
|
CT3 2BZ
|
County: |
Kent Region: South East
|
OS Coordinates: |
630755 / 630755
|
Development Status: |
Operational
|
Application Submitted: |
2/14/2015
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
9/15/2015
|
|
|
Generator Live |
11/15/2015
|
This Record Last Updated: |
2/1/2016
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
5/29/2018 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Marshborough Farm solar park 12.8 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Kent Country: England LPA: Dover District Council
|
Site ID and Reference: |
2291 / C1250
District:
|
Applicant: |
Vogt Solar
Application :
13/00332
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Land at Marshborough Farm off Ash Road, Sandwich
|
|
CT13 0PJ
|
County: |
Kent Region: South East
|
OS Coordinates: |
630622 / 630622
|
Development Status: |
Revised
|
Application Submitted: |
5/4/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
8/13/2013
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
9/16/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
7/21/2014 |
Granted: |
|
Appeal Granted: |
8/13/2013 |
Site Name: |
Marshborough Solar Farm
|
Generator Type: |
Photovoltaic
|
Scheme : |
REGO
|
Generator ID: |
G06978PVEN
|
Capacity: |
4080
|
Status: |
Live
|
Accreditation Date: |
5/4/2013
|
|
|
Commission Date: |
12/9/2015
|
|
|
Applicant: |
Marshborough Solar Limited
|
Applicant Address: |
Vogt Solar Ltd
Newhaven Enterprise Centre
Denton Island
Newhaven
BN9 9BA
England
|
Address: |
Land at Marshborough Farm
Woodnesborough
CT3 2BZ
England
|
|
Assumptions: Capacity: 4080kW 4.08 MW, Thus over the month Capacity * 720 hours per month = 2937.6 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
Sorry I found no matches, Please try again.
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|