vid = 3532pws_id = 354691pws_id = 354691
Not Logged on, Max pages: 5( 1 Seen ) ID:1969 Ind:1 IP: 54.81.166.196YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Bank Farm Solar Farm

Subscribers see an interactive map with Bank Farm Solar Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Solar projects and details.


Subscribe to Solar for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm


Subscribe for £500 to include full csv and KML downloads of all Solar project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Bank Farm Solar Farm (Solar , Proposed)

 General Information.

Location in the UK : England, Aldington, Kent    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 18 MW
Acreage:80   or approx Hectares : 32
Approx Date of 1st power generation:

/YES

 Comment


 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Bank Farm DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Bank Farm : Solar OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register
Project Info
NO Solar Panels in Aldington and Mersham

Windy BANK FARM 16m wind farm plans rejected
Proposals for a 16m wind farm on the edge of a County Durham forest have been rejected by councillors. Banks Renewables put forward proposals for a five-turbine development at Hamsterley Forest six years ago.

Jane Martin Councillor: Solar Farm Bank Road Aldington

©2018 Simon Mallett
Latest News Added
Wind farm aims to deliver 100m boost to South Lanarkshire economy
With construction of the 88MW Kype Muir Wind Farm, south of Strathaven, well underway, it is now estimated that the project will be worth more than 100m to the local economy.
Source: scotishconstruction, Date and Time of entry: 03 April 2018 00:00

Galloper offshore wind farm with 353MW capacity becomes fully operational
Construction of the 1.5bn wind farm began in November 2016. Full power generation was achieved on 29 March, as Siemens Gamesas last turbine was switched on.
Source: cleantech, Date and Time of entry: 03 April 2018 00:00

Blow me! Galloper wind farm off East Anglian coast hits full throttle
A 1.5bn wind farm off the coast of East Anglia has hit full throttle, just eighteen months after construction began.
Source: eadt, Date and Time of entry: 03 April 2018 00:00

First foundation installed for Aberdeen Bay wind farm
Vattenfall has released footage of the giant Asian Hercules crane vessel installing the first turbine foundation for the Aberdeen Bay wind farm.
Source: aberdeenjournals, Date and Time of entry: 03 April 2018 00:00

Glenfiddich owner loses Dorenell wind farm objection
William Grant and Sons objected to the Dorenell wind farm on the grounds it would spoil the local countryside and reduce visitor numbers.
Source: bbc, Date and Time of entry: 03 April 2018 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom