West Kingsdown Solar Farm

West Kingsdown Solar Farm (Solar , Cancelled)

 General Information.

Location in the UK : England, West Kingsdown    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 16 MW
Approx Date of 1st power generation:

/YES

 Comment

Application Withdrawn
The park could produce 16 megawatts of electricity a year – enough to power 6,500 homes – and reduce CO2 emissions by 7,740 tonnes a year.

Ground-mounted solar panels would be installed, and the electricity produced sold back to the National Grid.

Read more: http://www.courier.co.uk/Energy-company-hopes-build-solar-park-West/story-18411961-detail/story.html#ixzz3UAegRqdt
Follow us: @7OaksChronicle on Twitter | sevenoakschronicle on Facebook

 Address

Land Between Fawkham Road And Crowhurst Lane West Kingsdown KENT

 Associated Companies.

Relationship Company (For: West Kingsdown )
DeveloperHive Energy

 DECC Data on this Project: West Kingsdown :1245

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: West Kingdown     20 MW
Energy Type: Solar Photovoltaics
County: Kent     Country: England     LPA: Sevenoaks District Council
Site ID and Reference: 1245 / C1899     District:
Applicant: Hive Energy     Application : 13/02487/FUL (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Land Between Fawkham Road And Crowhurst Lane West Kingsdown KENT (Intersecting By M20)
 
County: Kent Region: South East
OS Coordinates: 558329 / 558329
Development Status: Planning Application Withdrawn
Application Submitted: 8/15/2013 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 1/24/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn: 11/8/2013    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: West Kingsdown: Solar : -na-

Project Info
Energy company hopes to build solar park in WEST KINGSDOWN
The site between Crowhurst Lane and Fawkham Road has been earmarked for the project which is in the early stages of negotiation. Hive Energy, a solar park developer, has sent a screening letter to Sevenoaks District Council

Solar farm plans withdrawn
A planning application to build a 93-acre solar park and install around 72,000 panels on land located between Fawkham Road and Crowhurst Lane, near the M20 in WEST KINGSDOWN, has been withdrawn by developers, Hive Energy.

Solar park suggested for WEST KINGSDOWN
Hive Energy has asked Sevenoaks District Council for it's views on the plan before any formal application for planning is made.

Cloud hangs over solar park plans
The 93-acre development, which would provide enough electricity to power almost 5,500 homes, has been given the thumbs down by the parish councils of WEST KINGSDOWN, Fawkham and Ash-cum-Ridley.

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School