vid = 79pws_id = 322752pws_id = 322752
--------------------------------------------------------
Not Logged on, Max pages: 5( 1 Seen ) ID:217 Ind:1 IP: 23.20.223.212YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Burradale Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Burradale Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Burradale Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Shetland Islands    
Type of installation: Wind    on/offshore: on
Turbines :5  Capacity : 3.68 MW
Approx Date of 1st power generation: December 2000

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Phase 1 commissioned 12/2000 Vestas V47 1.98 MW
Phase 2 commissioned Jan 2003 Vestas V52 1.7 MW
The five Turbines are named Mina, Brenda, Betsy, Sally and Karen.
Shetland Aerogenerators Ltd developed, owns and operates the Burradale Windfarm. Burradale is one of the most productive windfarms in the world with a recorded capacity factor* of 52%. The high productivity is due to Shetland's unique wind resource. Energy from Burradale flows to Lerwick Power Station where it then contributes to meeting Shetland's energy demand.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Burradale DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Burradale : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 3.68
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 20 m/s (44.74 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 19/07/2018
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 3.68 start: 5 Optimum: 15/ Stop: 19.8 / wind: / ratio 322752


Weather Station Name : Scalloway Latitude: 60.1381 Longitude: -1.2804 Elevation: 4

DateWind DirectionWind SpeedStart / StopCapacity Factor Output MW/hrGenerated MWhrs
12/07/2018 09:00:00NW 11 5 / 19.8 0
12/07/2018 12:00:00N 2 5 / 19.8 0
12/07/2018 15:00:00NNW 11 5 / 19.8 0
12/07/2018 18:00:00NNW 7 5 / 19.8 0
12/07/2018 21:00:00NW 4 5 / 19.8 0
13/07/2018WNW 4 5 / 19.8 0
13/07/2018 03:00:00WNW 4 5 / 19.8 0
13/07/2018 06:00:00WSW 4 5 / 19.8 0
13/07/2018 09:00:00SW 4 5 / 19.8 0
13/07/2018 12:00:00SW 7 5 / 19.8 0
13/07/2018 15:00:00SW 9 5 / 19.8 0
13/07/2018 18:00:00SSW 9 5 / 19.8 0
13/07/2018 21:00:00S 9 5 / 19.8 0
14/07/2018S 11 5 / 19.8 0
14/07/2018 03:00:00S 11 5 / 19.8 0
14/07/2018 06:00:00S 13 5 / 19.8 0.081 0.300.9
14/07/2018 09:00:00S 11 5 / 19.8 0.9
14/07/2018 12:00:00SSW 13 5 / 19.8 0.081 0.301.8
14/07/2018 15:00:00SSW 13 5 / 19.8 0.081 0.302.7
14/07/2018 18:00:00SSW 11 5 / 19.8 2.7
14/07/2018 21:00:00SSW 9 5 / 19.8 2.7
15/07/2018S 9 5 / 19.8 2.7
15/07/2018 03:00:00SSE 9 5 / 19.8 2.7
15/07/2018 06:00:00S 11 5 / 19.8 2.7
15/07/2018 09:00:00S 11 5 / 19.8 2.7
15/07/2018 12:00:00S 9 5 / 19.8 2.7
15/07/2018 15:00:00S 9 5 / 19.8 2.7
15/07/2018 18:00:00S 7 5 / 19.8 2.7
15/07/2018 21:00:00SSE 7 5 / 19.8 2.7
16/07/2018SSE 7 5 / 19.8 2.7
16/07/2018 03:00:00S 7 5 / 19.8 2.7
16/07/2018 06:00:00SSW 7 5 / 19.8 2.7
16/07/2018 09:00:00SSW 7 5 / 19.8 2.7
16/07/2018 12:00:00SW 7 5 / 19.8 2.7
16/07/2018 15:00:00W 7 5 / 19.8 2.7
16/07/2018 18:00:00WSW 7 5 / 19.8 2.7
16/07/2018 21:00:00W 7 5 / 19.8 2.7
Project Info
Three huge wind turbines at heart of plan for Gremista thermal store
Plans for a so-called smart grid in Shetland will pave the way for more small windfarms like BURRADALE to start up and generate money without having to wait for an interconnector cable to mainland Scotland.

Wind Prospect

BURRADALE Windfarm

BURRADALE ladies work together as worlds most prolific windfarm
They work quietly away in the background but Mina, Betsy, Brenda, Sally and Karen are playing a key role in providing what has been described as the worlds most productive windfarm.

©2018 Simon Mallett
Latest News Added
Heckington Fen Onshore Wind Farm
Application under section 36C to Vary the Existing s.36 Consent for the Heckington Fen Wind Farm (the Variation Application)
Source: ecotricity, Date and Time of entry: 28 June 2018 00:00

Pinewood Studio Wales, Cardiff
Ecotricity's first Welsh turbine - powering the development of high-tech solar panels. Sun and wind power comes together in a green revolution.
Source: ecotricity, Date and Time of entry: 28 June 2018 00:00

Wind turbine on Coleraine campus
An 800 kW wind turbine generator has been installed on the Coleraine Campus since September 2008. Ulster University
Source: ulster, Date and Time of entry: 26 June 2018 00:00

Vestas receives 110 MW order for Bhlaraidh
The order includes delivery, installation, and a 10-year Active Output Management (AOM) 4000 service agreement. Installation is expected to begin in the fourth quarter of 2016, with commissioning scheduled for the first half of 2017.
Source: vestas, Date and Time of entry: 21 June 2018 00:00

The world's fifth biggest wind farm has opened off the Norfolk coast
Dubbed the Race Bank development, the wind farm is capable of powering more than half a million UK homes, according to the Danish energy firm Orsted.
Source: dailymail, Date and Time of entry: 13 June 2018 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast: