Header Area Not Logged on, Max pages: 5( Seen ) ID:217 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

OAKLAND Biomass Energy

Cansee = YES

Subscribers see an interactive map with OAKLAND Biomass Energy and local projects displayed.

Subscribe for £100 to have full access to all Biomass projects and details.


Subscribe to Biomass for exact generator location including nearby generators

Subscribe for £500 to include full csv downloads of all Biomass project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

OAKLAND (Biomass , Active)

 General Information.

Location in the UK : England, YO26 8LA    
Type of installation: Biomass    on/offshore: on
Turbines :1  Capacity : 4 MW
Approx Date of 1st power generation: March 2014

/YES

 Comment


Over a 12 month period Rural Energy installed nearly 4MW
of renewable heating into 26 poultry sheds on five sites in
North Yorkshire.

Following a successfull installation at Site 1, Rural Energy was approached
to supply and install biomass boilers at a further four locations, bringing the
total number of sheds being heated through renewable technology to 26.

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: OAKLAND DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: OAKLAND : Biomass OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
OAKLAND FARMS Biomass

MULTIPLE POULTRY SITES AT OAKLAND FARMS

Solar farm in Ashford borough given the go-ahead
Ashford Borough Council’s planning committee had turned down Haymaker Energy’s first application for land at OAKLANDs Farm in Hothfield in December, but granted planning permission for an amended scheme on Wednesday.

OAKLANDs Solar Farm
Construction of a Solar Park, to include the installation of solar panels to generate up to 11,4MW of electricity with transformer housings, security fencing and cameras, land-scaping and other associated works, and cable route/trench.

Good Energy propose new solar farm near Wareham in Purbeck - See more at: http:/
100% renewable energy suppliers Good Energy have informed us that they recently submitted a planning application for a 5.8MW solar farm at OAKLANDs Plantation, just north of Wareham, Purbeck.

©2017 Simon Mallett

Latest News Added
Anesco opens ‘subsidy free’ solar farm with battery storage
Solar capacity is 10MW at the Clayhill site, with 6MW of battery capacity and the company says it is the first solar farm in the UK to operate without a subsidy.
Source: theenergyst, Date and Time of entry: 16 January 2018 00:00

Turning On N.Ireland’s Largest Solar Project!
This is Northern Ireland’s largest solar energy development. The Antrim project will create enough energy to power more than 11,000 homes.
Source: lightsource, Date and Time of entry: 29 December 2017 00:00

Severn Trent invests £60m in Minworth thermal hydrolysis plant
The £60m scheme will change the way that the company treats waste before generating green power and will make the process considerably more efficient, meaning the amount of clean energy generated will increase by almost a third.
Source: severnwaste, Date and Time of entry: 29 December 2017 00:00

UK enjoyed greenest year for electricity ever in 2017
In April, the UK had its first 24-hour period without using any coal power since the Industrial Revolution.
Source: bbc, Date and Time of entry: 28 December 2017 00:00

Last of massive piles laid for Moray Firth wind farm
Energy firm SSE, which is involved in the Beatrice Offshore Windfarm project, said a total of 86 clusters of four piles had been put in place.
Source: bbc, Date and Time of entry: 28 December 2017 00:00

©2017 Simon Mallett