Header Area Not Logged on, Max pages: 5( Seen ) ID:217 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

Iggesund Biomass Energy

Cansee = YES

Subscribers see an interactive map with Iggesund Biomass Energy and local projects displayed.

Subscribe for £100 to have full access to all Biomass projects and details.


Subscribe to Biomass for exact generator location including nearby generators

Subscribe for £500 to include full csv downloads of all Biomass project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Iggesund (Biomass , Active)

 General Information.

Location in the UK : England, Siddick, Workington    
Type of installation: Biomass    on/offshore: on
Turbines :0  Capacity : 134 MW
Approx Date of 1st power generation: February 2013

/YES

 Comment

Dedicated Biomass CHP Rated 49.9 MWe Biomass Input 147 MW Boiler Output 134 MW Commissioning to commence Dec 2012 Expected to reach full capacity April 2013 Replacing 40 MWe Gas Fired CHP

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Iggesund DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Iggesund : Biomass OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
Biomass Combined Heat and Power Plant

IGGESUND Biomass

Invite to supply biomass to IGGESUND

TURBINE PLAN FOR WORKINGTON FACTORY
IGGESUND Paperboard has applied for council permission to erect the turbines at its Siddick plant. But Allerdale councilís new policy calls for a distance of at least 800 metres between new turbines and homes.

IGGESUND invites farmers to its mill to hear about biomass plans
IGGESUND is inviting farmers to its Cumbrian mill to encourage them to grow energy crops to supply a new £108 biomass plant.

©2017 Simon Mallett

Latest News Added
Anesco opens Ďsubsidy freeí solar farm with battery storage
Solar capacity is 10MW at the Clayhill site, with 6MW of battery capacity and the company says it is the first solar farm in the UK to operate without a subsidy.
Source: theenergyst, Date and Time of entry: 16 January 2018 00:00

Turning On N.Irelandís Largest Solar Project!
This is Northern Irelandís largest solar energy development. The Antrim project will create enough energy to power more than 11,000 homes.
Source: lightsource, Date and Time of entry: 29 December 2017 00:00

Severn Trent invests £60m in Minworth thermal hydrolysis plant
The £60m scheme will change the way that the company treats waste before generating green power and will make the process considerably more efficient, meaning the amount of clean energy generated will increase by almost a third.
Source: severnwaste, Date and Time of entry: 29 December 2017 00:00

UK enjoyed greenest year for electricity ever in 2017
In April, the UK had its first 24-hour period without using any coal power since the Industrial Revolution.
Source: bbc, Date and Time of entry: 28 December 2017 00:00

Last of massive piles laid for Moray Firth wind farm
Energy firm SSE, which is involved in the Beatrice Offshore Windfarm project, said a total of 86 clusters of four piles had been put in place.
Source: bbc, Date and Time of entry: 28 December 2017 00:00

©2017 Simon Mallett