Header Area Not Logged on, Max pages: 5( Seen ) ID:1969 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

Chilton Biomass Energy

Cansee = YES

Subscribers see an interactive map with Chilton Biomass Energy and local projects displayed.

Subscribe for £100 to have full access to all Biomass projects and details.


Subscribe to Biomass for exact generator location including nearby generators

Subscribe for £500 to include full csv downloads of all Biomass project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Chilton (Biomass , Active)

 General Information.

Location in the UK : England,    
Type of installation: Biomass    on/offshore: on
Turbines :0  Capacity : 18 MW
Approx Date of 1st power generation: March 2012

/YES

 Comment

Installation and Operation of a Biomass Fired Heat and Power Plant and Ancillary Facilities including offices, storage and processing plant and equipment and reconfiguration of existing wood pellet factory - WPE Site Chilton Industrial Estate - Dalkia Bio Energy Limited, Staines, Middlesex - Plan Ref : 7/2008/0522/DM.

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Chilton DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Chilton : Biomass OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
Jobs Cars Property Directory Announcements Sign In Search MORE NEWS TRANSPORT CR
The plans for the 78 metre high turbine – the height of a 25 storey building – on Maple Hill off CHILTON Street, Clare, was opposed by Clare, Stoke by Clare, Hundon, Ashen and Kedington parish councils

CHILTON Cantelo solar farm approved
The 5MW solar farm will cover 13.6 hectares of land near the village of CHILTON Cantelo in south Somerset.

Residents fear proposed solar farm will devalue their homes Read more: http://w
Plans to install a 5MW solar farm on 13.6 hectares at The Cypress House Road, CHILTON Cantelo, have been submitted to South Somerset District Council

County Durham bio-energy plant opens
A new biomass energy plant in County Durham has been officially opened. The Dahlia plant in CHILTON will make energy from recycled wood by creating wood chips which can then be burned as carbon neutral fuel.

©2017 Simon Mallett

Latest News Added
Anesco opens ‘subsidy free’ solar farm with battery storage
Solar capacity is 10MW at the Clayhill site, with 6MW of battery capacity and the company says it is the first solar farm in the UK to operate without a subsidy.
Source: theenergyst, Date and Time of entry: 16 January 2018 00:00

Turning On N.Ireland’s Largest Solar Project!
This is Northern Ireland’s largest solar energy development. The Antrim project will create enough energy to power more than 11,000 homes.
Source: lightsource, Date and Time of entry: 29 December 2017 00:00

Severn Trent invests £60m in Minworth thermal hydrolysis plant
The £60m scheme will change the way that the company treats waste before generating green power and will make the process considerably more efficient, meaning the amount of clean energy generated will increase by almost a third.
Source: severnwaste, Date and Time of entry: 29 December 2017 00:00

UK enjoyed greenest year for electricity ever in 2017
In April, the UK had its first 24-hour period without using any coal power since the Industrial Revolution.
Source: bbc, Date and Time of entry: 28 December 2017 00:00

Last of massive piles laid for Moray Firth wind farm
Energy firm SSE, which is involved in the Beatrice Offshore Windfarm project, said a total of 86 clusters of four piles had been put in place.
Source: bbc, Date and Time of entry: 28 December 2017 00:00

©2017 Simon Mallett