Header Area Not Logged on, Max pages: 5( Seen ) ID:1969 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

Snetterton Biomass Energy

Cansee = YES

Subscribers see an interactive map with Snetterton Biomass Energy and local projects displayed.

Subscribe for £100 to have full access to all Biomass projects and details.


Subscribe to Biomass for exact generator location including nearby generators

Subscribe for £500 to include full csv downloads of all Biomass project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Snetterton (Biomass , Active)

 General Information.

Location in the UK : England, NR16 2JU    
Type of installation: Biomass    on/offshore: on
Turbines :0  Capacity : 44.2 MW
Approx Date of 1st power generation: December 2016

/YES

 Comment

will burn just over 250 kilotons every year at full capacity. That is 680 Tonnes per day. Snetterton states they will primarily use straw supplemented with Miscanthus, woodchip and OSR.

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Snetterton DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Snetterton : Biomass OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
SNETTERTON RENEWABLE ENERGY PLANT
Plans to generate first power and open renewable energy plant in Spring 2017, when it will generate 44MW of electricity which is enough to supply 82,000 homes.

Norfolk and Suffolk could become solar energy capital
consent to build two solar farms: a £1.75 million scheme at Muck Lane, Salhouse, near Norwich and an £8.5m project at Airfield Farm, SNETTERTON.

©2017 Simon Mallett

Latest News Added
Anesco opens ‘subsidy free’ solar farm with battery storage
Solar capacity is 10MW at the Clayhill site, with 6MW of battery capacity and the company says it is the first solar farm in the UK to operate without a subsidy.
Source: theenergyst, Date and Time of entry: 16 January 2018 00:00

Turning On N.Ireland’s Largest Solar Project!
This is Northern Ireland’s largest solar energy development. The Antrim project will create enough energy to power more than 11,000 homes.
Source: lightsource, Date and Time of entry: 29 December 2017 00:00

Severn Trent invests £60m in Minworth thermal hydrolysis plant
The £60m scheme will change the way that the company treats waste before generating green power and will make the process considerably more efficient, meaning the amount of clean energy generated will increase by almost a third.
Source: severnwaste, Date and Time of entry: 29 December 2017 00:00

UK enjoyed greenest year for electricity ever in 2017
In April, the UK had its first 24-hour period without using any coal power since the Industrial Revolution.
Source: bbc, Date and Time of entry: 28 December 2017 00:00

Last of massive piles laid for Moray Firth wind farm
Energy firm SSE, which is involved in the Beatrice Offshore Windfarm project, said a total of 86 clusters of four piles had been put in place.
Source: bbc, Date and Time of entry: 28 December 2017 00:00

©2017 Simon Mallett