Header Area Not Logged on, Max pages: 5( Seen ) ID:1969 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

Sion

Cansee = YES

Subscribers see an interactive map with Sion and local projects displayed.

Subscribe for £100 to have full access to all Hydro projects and details.


Subscribe to Hydro for exact generator location including nearby generators

Subscribe for £500 to include full csv downloads of all Hydro project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Sion (Hydro , Active)

 General Information.

Location in the UK : N.Ireland, BT82 9HE    
Type of installation: Hydro    on/offshore: on
Turbines :0  Capacity : 0.78 MW
Approx Date of 1st power generation: January 1997

/YES

 Comment

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Sion DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Sion : Hydro OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
Scotland facing new wave of larger wind farms with taller turbines
The Scottish Government’s first energy strategy backed the development of more wind farms “and– increasingly – the extenSION and replacement of existing sites with new and larger turbines.”

Dutch government confirms zero-subsidy wind farm will go ahead
The Dutch government's deciSION to hold the first zero-subsidy auction for offshore wind has paid off, with the government announcing yesterday that bidders have come forward and the site will be developed without state support.

Wind farm will have environmental benefits but conditions must be met
Britain faces an energy crisis. And Happisburgh faces an eroSION crisis. We need investment in renewable energy and we need investment in coastal defences. The proposed new wind farm off the north east Norfolk coast offers hope on both fronts.

Kirkby Moor wind farm must be allowed to continue
The deciSION no to extend the life of Kirkby Moor windfarm must surely be one of the worst deciSIONs by South Lakeland District Council in recent years (Gazette, December 7, 'Residents win turbines fight').

Wales's biggest solar farm to go ahead on Anglesey LLanbadgrig
The 49.9MW scheme is to be developed by Countryside Renewables (North Anglesey) Ltd following a deciSION by the Isle of Anglesey County Council to approve the plan.

©2017 Simon Mallett

Latest News Added
Anesco opens ‘subsidy free’ solar farm with battery storage
Solar capacity is 10MW at the Clayhill site, with 6MW of battery capacity and the company says it is the first solar farm in the UK to operate without a subsidy.
Source: theenergyst, Date and Time of entry: 16 January 2018 00:00

Turning On N.Ireland’s Largest Solar Project!
This is Northern Ireland’s largest solar energy development. The Antrim project will create enough energy to power more than 11,000 homes.
Source: lightsource, Date and Time of entry: 29 December 2017 00:00

Severn Trent invests £60m in Minworth thermal hydrolysis plant
The £60m scheme will change the way that the company treats waste before generating green power and will make the process considerably more efficient, meaning the amount of clean energy generated will increase by almost a third.
Source: severnwaste, Date and Time of entry: 29 December 2017 00:00

UK enjoyed greenest year for electricity ever in 2017
In April, the UK had its first 24-hour period without using any coal power since the Industrial Revolution.
Source: bbc, Date and Time of entry: 28 December 2017 00:00

Last of massive piles laid for Moray Firth wind farm
Energy firm SSE, which is involved in the Beatrice Offshore Windfarm project, said a total of 86 clusters of four piles had been put in place.
Source: bbc, Date and Time of entry: 28 December 2017 00:00

©2017 Simon Mallett