Sorry I found no matches, Please try again. 176
vid = 104pws_id = 352013pws_id = 352013
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.119.133.206 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Clochnahill Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Clochnahill Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Aberdeenshire    
Type of installation: Wind    on/offshore: on
Turbines :3  Capacity : 6 MW
Approx Date of 1st power generation: Jan 2012

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

July 2008: Permission has been granted for a 4 turbine wind farm in Aberdeenshire south of Stonehaven.

 Turbine Make and Specs

Model: Siemens SWT 1.3 Start Speed: 3
Capacity: 1.3 Optimal Speed: 14
Rotor Diameter: 62 Stop Speed: 25
Hub Height 60   Avg for all turbines:60 Avg. Elevation: 187
Web Page:
Comment:

 Address

Clochnahill Stonehaven AB39 2XY Scotland

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Clochnahill )

 DECC Data on this Project: Clochnahill :-na-

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Clochnahill Wind Farm     5.2 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Aberdeenshire Council
Site ID and Reference: 2839 / B0626     District:
Applicant: Private Developer     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 1.3
Height of Turbines: Calculated capacity: 5.2
Site Address: Clochnahill, Stonehaven AB39 2XY
 
County: Grampian Region: Scotland
OS Coordinates: 382413 / 382413
Development Status: Operational
Application Submitted: 7/27/2006 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 1/20/2012 This Record Last Updated: 2/26/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Clochnahill Windfarm     6 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Aberdeenshire Council
Site ID and Reference: 3265 / N00388W     District:
Applicant: Private Developer     Application : ENQ/2005/0667 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 6
Site Address: Clochnahill Farm Temple of Fiddes Mearns Aberdeenshire
 
County: Grampian Region: Scotland
OS Coordinates: 381637 / 381637
Development Status: Planning Permission Refused
Application Submitted: 5/8/2006 Planning Permission Granted
Application Determined: Permission refused: 3/20/2007
Construction Date:    
Generator Live This Record Last Updated: 11/16/2007
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 3/20/2007

 OFGEM Data on this Project: Clochnahill: Wind : -na-

 Calculations


Capacity: 12
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 12 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 352013

Project Info
©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School