Coal Clough Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Coal Clough Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Lancashire    
Type of installation: Wind    on/offshore: on
Turbines :24  Capacity : 9.6 MW
Approx Date of 1st power generation: December 1992

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Constructed in 1992, it is capable of generating up to ten megawatts of cleaner greener energy.

On the 21st December 2009, ScottishPower Renewables submitted an application to repower Coal Clough Windfarm, which was consented in January 2013. This means that the existing 24 turbines will be removed and replaced with eight new ones, increasing the generating capacity of the windfarm from 9.6 megawatts to 16 megawatts.

 Turbine Make and Specs

Model: Vestas V42 Start Speed: 4
Capacity: 0.6 Optimal Speed: 15
Rotor Diameter: 42 Stop Speed: 25
Hub Height 40   Avg for all turbines:40 Avg. Elevation: 357
Web Page:
Comment:

 Address

The Long Causeway Mereclough Burnley BB10 4RR England

 Associated Companies.

Relationship Company (For: Coal Clough )
OperatorScottish Power Renewables
OwnerScottish Power Renewables

 DECC Data on this Project: Coal Clough :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Coal Clough Wind Farm Repowering     16 MW
Energy Type: Wind Onshore
County: Lancashire     Country: England     LPA: Burnley Borough Council
Site ID and Reference: 4321 / EN00146     District:
Applicant: Coal Clough Wind Farm     Application : APP/2009/0758 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 8 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 16
Site Address: Coal Clough Wind Farm,The Long Causeway, Burnley 
 
County: Lancashire Region: North West
OS Coordinates: 390207 / 390207
Development Status: Operational
Application Submitted: 12/22/2009 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 5/14/2014    
Generator Live 5/1/2015 This Record Last Updated: 5/18/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Coal Clough Wind Farm     9.6 MW
Energy Type: Wind Onshore
County: Lancashire     Country: England     LPA: Burnley Borough Council
Site ID and Reference: 3079 / ENA0002     District:
Applicant: Renewable Energy Systems (RES)     Application : 91/0920 & APP/2005/0867 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 24 Turbine Capacity: 0.40000000000000002
Height of Turbines: Calculated capacity: 9.6
Site Address: Burnley
 
County: Lancashire Region: North West
OS Coordinates: 390207 / 390207
Development Status: Operational
Application Submitted: 11/25/1991 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 2/1/1993 This Record Last Updated: 6/9/2010
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Coal Clough: Wind :

Site Name: Coal Clough Repowering
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00342RQEN
Capacity: 16000 Status: Live
Accreditation Date: 11/25/1991    
Commission Date: 9/29/2014    
Applicant: ScottishPower Renewables (UK) Limited
Applicant Address: Arnott House 12-16 Bridge Street Belfast BT1 1LB Northern Ireland
Address: The Long Causeway Mereclough Burnley BB10 4RR England

Site Name: Coal Clough Repowering
Generator Type: Wind
Scheme : REGO Generator ID: G02527NWEN
Capacity: 16000 Status: Live
Accreditation Date: 11/25/1991    
Commission Date: 9/29/2014    
Applicant: ScottishPower Renewables (UK) Limited
Applicant Address: Arnott House 12-16 Bridge Street Belfast BT1 1LB Northern Ireland
Address: The Long Causeway Mereclough Burnley BB10 4RR England
 
Assumptions: Capacity: 16000kW 16 MW,
Thus over the month Capacity * 720 hours per month = 11520 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 4156 25.98% Issued
01/02/2018 3567 22.29% Issued
01/01/2018 6214 38.84% Issued
01/12/2017 4467 27.92% Issued
01/11/2017 3947 24.67% Issued
01/10/2017 5760 36.00% Issued
01/09/2017 3223 20.14% Issued
01/08/2017 2838 17.74% Issued
01/07/2017 2892 18.08% Issued
01/06/2017 3771 23.57% Issued
01/05/2017 3361 21.01% Issued
01/04/2017 3251 20.32% Issued
01/03/2017 4570 28.56% Redeemed
01/02/2017 4915 30.72% Redeemed
01/01/2017 3496 21.85% Redeemed
Dec-16 03677 4086 25.54% Issued
Nov-16 02469 2743 17.14% Issued
Oct-16 03158 3509 21.93% Issued
Sep-16 02771 3078 19.24% Issued
Aug-16 03296 3663 22.89% Issued
Jul-16 02700 3000 18.75% Issued
Jun-16 01369 1539 9.62% Retired
Jun-16 01369 1539 9.62% Issued
May-16 02960 3289 20.56% Issued
Apr-16 03035 3372 21.08% Issued
Mar-16 03037 153 0.96% Retired
Feb-16 04581 143 0.89% Retired
Jan-16 04431 149 0.93% Retired
Apr-15 27822486 2782 17.39% Redeemed
Mar-15 51684652 5169 32.31% Expired
Sep-14 00 1 0.01% Expired

 Calculations


Capacity: 19.2
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/24/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 19.2 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 351815

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School