Click here for Generation Forecast for wind farms based on Met office data
Coal Clough Wind Farm (Wind , Active) Location in the UK : England, Lancashire Type of installation: Wind on/offshore: on Turbines :24 Capacity : 9.6 MW Approx Date of 1st power generation: December 1992
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Constructed in 1992, it is capable of generating up to ten megawatts of cleaner greener energy.
On the 21st December 2009, ScottishPower Renewables submitted an application to repower Coal Clough Windfarm, which was consented in January 2013. This means that the existing 24 turbines will be removed and replaced with eight new ones, increasing the generating capacity of the windfarm from 9.6 megawatts to 16 megawatts.
Model: |
Vestas V42
|
Start Speed: |
4
|
Capacity: |
0.6
|
Optimal Speed: |
15
|
Rotor Diameter: |
42
|
Stop Speed: |
25
|
Hub Height |
40 Avg for all turbines:40
|
Avg. Elevation: |
357
|
Web Page: |
|
Comment: |
|
The Long Causeway Mereclough Burnley BB10 4RR England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Coal Clough Wind Farm Repowering 16 MW
|
Energy Type: |
Wind Onshore |
County: |
Lancashire Country: England LPA: Burnley Borough Council
|
Site ID and Reference: |
4321 / EN00146
District:
|
Applicant: |
Coal Clough Wind Farm
Application :
APP/2009/0758
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
8 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
16 |
Site Address: |
Coal Clough Wind Farm,The Long Causeway, Burnley
|
|
|
County: |
Lancashire Region: North West
|
OS Coordinates: |
390207 / 390207
|
Development Status: |
Operational
|
Application Submitted: |
12/22/2009
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
5/14/2014
|
|
|
Generator Live |
5/1/2015
|
This Record Last Updated: |
5/18/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Coal Clough Wind Farm 9.6 MW
|
Energy Type: |
Wind Onshore |
County: |
Lancashire Country: England LPA: Burnley Borough Council
|
Site ID and Reference: |
3079 / ENA0002
District:
|
Applicant: |
Renewable Energy Systems (RES)
Application :
91/0920 & APP/2005/0867
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
24 |
Turbine Capacity: |
0.40000000000000002 |
Height of Turbines: |
|
Calculated capacity: |
9.6 |
Site Address: |
Burnley
|
|
|
County: |
Lancashire Region: North West
|
OS Coordinates: |
390207 / 390207
|
Development Status: |
Operational
|
Application Submitted: |
11/25/1991
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
2/1/1993
|
This Record Last Updated: |
6/9/2010
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Coal Clough Repowering
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00342RQEN
|
Capacity: |
16000
|
Status: |
Live
|
Accreditation Date: |
11/25/1991
|
|
|
Commission Date: |
9/29/2014
|
|
|
Applicant: |
ScottishPower Renewables (UK) Limited
|
Applicant Address: |
Arnott House
12-16 Bridge Street
Belfast
BT1 1LB
Northern Ireland
|
Address: |
The Long Causeway
Mereclough
Burnley
BB10 4RR
England
|
Site Name: |
Coal Clough Repowering
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02527NWEN
|
Capacity: |
16000
|
Status: |
Live
|
Accreditation Date: |
11/25/1991
|
|
|
Commission Date: |
9/29/2014
|
|
|
Applicant: |
ScottishPower Renewables (UK) Limited
|
Applicant Address: |
Arnott House
12-16 Bridge Street
Belfast
BT1 1LB
Northern Ireland
|
Address: |
The Long Causeway
Mereclough
Burnley
BB10 4RR
England
|
|
Assumptions: Capacity: 16000kW 16 MW, Thus over the month Capacity * 720 hours per month = 11520 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 4156 | 25.98% | Issued | 01/02/2018 | | | 3567 | 22.29% | Issued | 01/01/2018 | | | 6214 | 38.84% | Issued | 01/12/2017 | | | 4467 | 27.92% | Issued | 01/11/2017 | | | 3947 | 24.67% | Issued | 01/10/2017 | | | 5760 | 36.00% | Issued | 01/09/2017 | | | 3223 | 20.14% | Issued | 01/08/2017 | | | 2838 | 17.74% | Issued | 01/07/2017 | | | 2892 | 18.08% | Issued | 01/06/2017 | | | 3771 | 23.57% | Issued | 01/05/2017 | | | 3361 | 21.01% | Issued | 01/04/2017 | | | 3251 | 20.32% | Issued | 01/03/2017 | | | 4570 | 28.56% | Redeemed | 01/02/2017 | | | 4915 | 30.72% | Redeemed | 01/01/2017 | | | 3496 | 21.85% | Redeemed | Dec-16 | 0 | 3677 | 4086 | 25.54% | Issued | Nov-16 | 0 | 2469 | 2743 | 17.14% | Issued | Oct-16 | 0 | 3158 | 3509 | 21.93% | Issued | Sep-16 | 0 | 2771 | 3078 | 19.24% | Issued | Aug-16 | 0 | 3296 | 3663 | 22.89% | Issued | Jul-16 | 0 | 2700 | 3000 | 18.75% | Issued | Jun-16 | 0 | 1369 | 1539 | 9.62% | Retired | Jun-16 | 0 | 1369 | 1539 | 9.62% | Issued | May-16 | 0 | 2960 | 3289 | 20.56% | Issued | Apr-16 | 0 | 3035 | 3372 | 21.08% | Issued | Mar-16 | 0 | 3037 | 153 | 0.96% | Retired | Feb-16 | 0 | 4581 | 143 | 0.89% | Retired | Jan-16 | 0 | 4431 | 149 | 0.93% | Retired | Apr-15 | 2782 | 2486 | 2782 | 17.39% | Redeemed | Mar-15 | 5168 | 4652 | 5169 | 32.31% | Expired | Sep-14 | 0 | 0 | 1 | 0.01% | Expired |
|
Capacity: 19.2 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|