Loading
Page views this IP this session = 1 of 10 unsubscribed pagesCoal Clough Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Coal Clough Wind Farm (Wind , Active) Location in the UK : England, Lancashire Type of installation: Wind on/offshore: on Turbines :24 Capacity : 9.6 MW Approx Date of 1st power generation: December 1992
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Constructed in 1992, it is capable of generating up to ten megawatts of cleaner greener energy.
On the 21st December 2009, ScottishPower Renewables submitted an application to repower Coal Clough Windfarm, which was consented in January 2013. This means that the existing 24 turbines will be removed and replaced with eight new ones, increasing the generating capacity of the windfarm from 9.6 megawatts to 16 megawatts.
Model: |
Vestas V42
|
Start Speed: |
4
|
Capacity: |
0.6
|
Optimal Speed: |
15
|
Rotor Diameter: |
42
|
Stop Speed: |
25
|
Hub Height |
40 Avg for all turbines:40
|
Avg. Elevation: |
357
|
Web Page: |
|
Comment: |
|
The Long Causeway Mereclough Burnley BB10 4RR England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Coal Clough Wind Farm Repowering 16 MW
|
Energy Type: |
Wind Onshore |
County: |
Lancashire Country: England LPA: Burnley Borough Council
|
Site ID and Reference: |
4321 / EN00146
District:
|
Applicant: |
Coal Clough Wind Farm
Application :
APP/2009/0758
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
8 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
16 |
Site Address: |
Coal Clough Wind Farm,The Long Causeway, Burnley
|
|
|
County: |
Lancashire Region: North West
|
OS Coordinates: |
390207 / 390207
|
Development Status: |
Operational
|
Application Submitted: |
12/22/2009
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
5/14/2014
|
|
|
Generator Live |
5/1/2015
|
This Record Last Updated: |
5/18/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Coal Clough Wind Farm 9.6 MW
|
Energy Type: |
Wind Onshore |
County: |
Lancashire Country: England LPA: Burnley Borough Council
|
Site ID and Reference: |
3079 / ENA0002
District:
|
Applicant: |
Renewable Energy Systems (RES)
Application :
91/0920 & APP/2005/0867
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
24 |
Turbine Capacity: |
0.40000000000000002 |
Height of Turbines: |
|
Calculated capacity: |
9.6 |
Site Address: |
Burnley
|
|
|
County: |
Lancashire Region: North West
|
OS Coordinates: |
390207 / 390207
|
Development Status: |
Operational
|
Application Submitted: |
11/25/1991
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
2/1/1993
|
This Record Last Updated: |
6/9/2010
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Coal Clough Repowering
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00342RQEN
|
Capacity: |
16000
|
Status: |
Live
|
Accreditation Date: |
11/25/1991
|
|
|
Commission Date: |
9/29/2014
|
|
|
Applicant: |
ScottishPower Renewables (UK) Limited
|
Applicant Address: |
Arnott House
12-16 Bridge Street
Belfast
BT1 1LB
Northern Ireland
|
Address: |
The Long Causeway
Mereclough
Burnley
BB10 4RR
England
|
Site Name: |
Coal Clough Repowering
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02527NWEN
|
Capacity: |
16000
|
Status: |
Live
|
Accreditation Date: |
11/25/1991
|
|
|
Commission Date: |
9/29/2014
|
|
|
Applicant: |
ScottishPower Renewables (UK) Limited
|
Applicant Address: |
Arnott House
12-16 Bridge Street
Belfast
BT1 1LB
Northern Ireland
|
Address: |
The Long Causeway
Mereclough
Burnley
BB10 4RR
England
|
|
Assumptions: Capacity: 16000kW 16 MW, Thus over the month Capacity * 720 hours per month = 11520 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 4156 | 25.98% | Issued | 01/02/2018 | | | 3567 | 22.29% | Issued | 01/01/2018 | | | 6214 | 38.84% | Issued | 01/12/2017 | | | 4467 | 27.92% | Issued | 01/11/2017 | | | 3947 | 24.67% | Issued | 01/10/2017 | | | 5760 | 36.00% | Issued | 01/09/2017 | | | 3223 | 20.14% | Issued | 01/08/2017 | | | 2838 | 17.74% | Issued | 01/07/2017 | | | 2892 | 18.08% | Issued | 01/06/2017 | | | 3771 | 23.57% | Issued | 01/05/2017 | | | 3361 | 21.01% | Issued | 01/04/2017 | | | 3251 | 20.32% | Issued | 01/03/2017 | | | 4570 | 28.56% | Redeemed | 01/02/2017 | | | 4915 | 30.72% | Redeemed | 01/01/2017 | | | 3496 | 21.85% | Redeemed | Dec-16 | 0 | 3677 | 4086 | 25.54% | Issued | Nov-16 | 0 | 2469 | 2743 | 17.14% | Issued | Oct-16 | 0 | 3158 | 3509 | 21.93% | Issued | Sep-16 | 0 | 2771 | 3078 | 19.24% | Issued | Aug-16 | 0 | 3296 | 3663 | 22.89% | Issued | Jul-16 | 0 | 2700 | 3000 | 18.75% | Issued | Jun-16 | 0 | 1369 | 1539 | 9.62% | Retired | Jun-16 | 0 | 1369 | 1539 | 9.62% | Issued | May-16 | 0 | 2960 | 3289 | 20.56% | Issued | Apr-16 | 0 | 3035 | 3372 | 21.08% | Issued | Mar-16 | 0 | 3037 | 153 | 0.96% | Retired | Feb-16 | 0 | 4581 | 143 | 0.89% | Retired | Jan-16 | 0 | 4431 | 149 | 0.93% | Retired | Apr-15 | 2782 | 2486 | 2782 | 17.39% | Redeemed | Mar-15 | 5168 | 4652 | 5169 | 32.31% | Expired | Sep-14 | 0 | 0 | 1 | 0.01% | Expired |
|
Capacity: 19.2 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|