Loading
Page views this IP this session = 1 of 10 unsubscribed pagesCraig Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Craig Wind Farm (Wind , Active) Location in the UK : Scotland, Dumfries & Galloway Type of installation: Wind on/offshore: on Turbines :4 Capacity : 8 MW Approx Date of 1st power generation: September 2007
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
INSTALLATION OF ONE WIND TURBINE (ADDITIONAL TO 5 TURBINES GRANTED UNDER APPEAL P/PPA/170/117) AND EXTENSION TO EXISTING WINDFARM ACCESS TRACK APPLICATION WITHOUT COMPLIANCE WITH CONDITIONS 1, 3, 9 AND 10 OF PLANNING PERMISSION 09/P/4/0342 The project itself consists of four Nordex N80 wind turbines on 60 metre towers with rotor diameters of 80 metres. Construction work at the site will commence in August 2006, with electricity generation projected to start in summer 2007.
Model: |
Nordex N80
|
Start Speed: |
4
|
Capacity: |
2.5
|
Optimal Speed: |
13
|
Rotor Diameter: |
80
|
Stop Speed: |
25
|
Hub Height |
60 Avg for all turbines:60
|
Avg. Elevation: |
362
|
Web Page: |
http://vetropark.org/d/59743/d/nordex_n80-n90_gb.pdf |
Comment: |
N80 suits High Wind Areas
|
Craig Westkirkland Langholm DG13 0NZ Scotland
Relationship |
Company (For:
Craig
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Craig Wind Farm (Extension) 2.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Dumfries and Galloway Council
|
Site ID and Reference: |
4465 / B0605
District:
|
Applicant: |
Temporis Capital
Application :
09/P/4/0342
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
2.5 |
Site Address: |
Westerkirk
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
202000 / 202000
|
Development Status: |
Operational
|
Application Submitted: |
8/21/2009
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
8/15/2016
|
|
|
Generator Live |
5/15/2017
|
This Record Last Updated: |
5/23/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
1/5/2018 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Craig Wind Farm 10 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Dumfries and Galloway Council
|
Site ID and Reference: |
4524 / N00305W
District:
|
Applicant: |
Craig Wind Farm Co
Application :
03/P/4/0326
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
4 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
10 |
Site Address: |
Westerkirk
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
331995 / 331995
|
Development Status: |
Operational
|
Application Submitted: |
7/23/2003
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
12/24/2003
|
Construction Date: |
|
|
|
Generator Live |
10/1/2007
|
This Record Last Updated: |
1/7/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
12/24/2003 |
Site Name: |
Craig Wind Farm 2
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02554NWSC
|
Capacity: |
4614
|
Status: |
Live
|
Accreditation Date: |
7/23/2003
|
|
|
Commission Date: |
2/22/2017
|
|
|
Applicant: |
Craig Wind Farm Limited
|
Applicant Address: |
Craig
Westerkirk
Langholm
DG13 0NZ
Scotland
|
Address: |
Craig
Westkirkland
Langholm
DG13 0NZ
Scotland
|
|
Assumptions: Capacity: 4614kW 4.614 MW, Thus over the month Capacity * 720 hours per month = 3322.08 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/05/2018 | | | 631 | 13.68% | Issued | 01/02/2018 | | | 801 | 17.36% | Issued | 01/01/2018 | | | 1138 | 24.66% | Issued | 01/12/2017 | | | 955 | 20.70% | Issued | 01/11/2017 | | | 892 | 19.33% | Issued | 01/10/2017 | | | 1144 | 24.79% | Issued | 01/09/2017 | | | 577 | 12.51% | Issued | 01/08/2017 | | | 787 | 17.06% | Issued | 01/07/2017 | | | 750 | 16.25% | Issued | 01/06/2017 | | | 1227 | 26.59% | Issued | 01/05/2017 | | | 788 | 17.08% | Issued | 01/04/2017 | | | 393 | 8.52% | Issued | 01/03/2017 | | | 1057 | 22.91% | Redeemed | 01/02/2017 | | | 176 | 3.81% | Redeemed |
|
Capacity: 20 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 2/16/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|