Loading
Page views this IP this session = 1 of 10 unsubscribed pagesCraig Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Craig Wind Farm (Wind , Active) Location in the UK : Scotland, Dumfries & Galloway Type of installation: Wind on/offshore: on Turbines :4 Capacity : 8 MW Approx Date of 1st power generation: September 2007
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
INSTALLATION OF ONE WIND TURBINE (ADDITIONAL TO 5 TURBINES GRANTED UNDER APPEAL P/PPA/170/117) AND EXTENSION TO EXISTING WINDFARM ACCESS TRACK APPLICATION WITHOUT COMPLIANCE WITH CONDITIONS 1, 3, 9 AND 10 OF PLANNING PERMISSION 09/P/4/0342 The project itself consists of four Nordex N80 wind turbines on 60 metre towers with rotor diameters of 80 metres. Construction work at the site will commence in August 2006, with electricity generation projected to start in summer 2007.
Model: |
Nordex N80
|
Start Speed: |
4
|
Capacity: |
2.5
|
Optimal Speed: |
13
|
Rotor Diameter: |
80
|
Stop Speed: |
25
|
Hub Height |
60 Avg for all turbines:60
|
Avg. Elevation: |
362
|
Web Page: |
http://vetropark.org/d/59743/d/nordex_n80-n90_gb.pdf |
Comment: |
N80 suits High Wind Areas
|
Craig Westkirkland Langholm DG13 0NZ Scotland
Relationship |
Company (For:
Craig
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Craig Wind Farm (Extension) 2.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Dumfries and Galloway Council
|
Site ID and Reference: |
4465 / B0605
District:
|
Applicant: |
Temporis Capital
Application :
09/P/4/0342
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
2.5 |
Site Address: |
Westerkirk
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
202000 / 202000
|
Development Status: |
Operational
|
Application Submitted: |
8/21/2009
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
8/15/2016
|
|
|
Generator Live |
5/15/2017
|
This Record Last Updated: |
5/23/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
1/5/2018 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Craig Wind Farm 10 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Dumfries and Galloway Council
|
Site ID and Reference: |
4524 / N00305W
District:
|
Applicant: |
Craig Wind Farm Co
Application :
03/P/4/0326
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
4 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
10 |
Site Address: |
Westerkirk
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
331995 / 331995
|
Development Status: |
Operational
|
Application Submitted: |
7/23/2003
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
12/24/2003
|
Construction Date: |
|
|
|
Generator Live |
10/1/2007
|
This Record Last Updated: |
1/7/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
12/24/2003 |
Site Name: |
Craig Wind Farm 2
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02554NWSC
|
Capacity: |
4614
|
Status: |
Live
|
Accreditation Date: |
7/23/2003
|
|
|
Commission Date: |
2/22/2017
|
|
|
Applicant: |
Craig Wind Farm Limited
|
Applicant Address: |
Craig
Westerkirk
Langholm
DG13 0NZ
Scotland
|
Address: |
Craig
Westkirkland
Langholm
DG13 0NZ
Scotland
|
|
Assumptions: Capacity: 4614kW 4.614 MW, Thus over the month Capacity * 720 hours per month = 3322.08 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/05/2018 | | | 631 | 13.68% | Issued | 01/02/2018 | | | 801 | 17.36% | Issued | 01/01/2018 | | | 1138 | 24.66% | Issued | 01/12/2017 | | | 955 | 20.70% | Issued | 01/11/2017 | | | 892 | 19.33% | Issued | 01/10/2017 | | | 1144 | 24.79% | Issued | 01/09/2017 | | | 577 | 12.51% | Issued | 01/08/2017 | | | 787 | 17.06% | Issued | 01/07/2017 | | | 750 | 16.25% | Issued | 01/06/2017 | | | 1227 | 26.59% | Issued | 01/05/2017 | | | 788 | 17.08% | Issued | 01/04/2017 | | | 393 | 8.52% | Issued | 01/03/2017 | | | 1057 | 22.91% | Redeemed | 01/02/2017 | | | 176 | 3.81% | Redeemed |
|
Capacity: 20 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|