Cregganconroe Wind Farm (Wind , Active) Location in the UK : N.Ireland, Pomeroy Type of installation: Wind on/offshore: on Turbines :5 Capacity : 10 MW Approx Date of 1st power generation: January 2017
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
A planning application and Environmental Impact Statement (EIS) was lodged with Planning Service in February 2006. Planning consent was given by Planning Service in September 2010.
Model: |
Enercon E82
|
Start Speed: |
4
|
Capacity: |
2
|
Optimal Speed: |
13.5
|
Rotor Diameter: |
82
|
Stop Speed: |
31
|
Hub Height |
69 Avg for all turbines:69
|
Avg. Elevation: |
238
|
Web Page: |
http://www.enercon.de/en-en/62.htm |
Comment: |
Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate
|
Loughmallon Road Pomeroy Dungannon BT70 2SX Northern Ireland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Cregganconroe 13.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Tyrone Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
4653 / EN00128
District:
|
Applicant: |
Gaelectric Developments/ CGN Europe Energy
Application :
K/2006/0242/F
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
6 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
13.8 |
Site Address: |
Loughmallon Road, Cregganconroe, Pomeroy
|
|
|
County: |
Co. Tyrone Region: Northern Ireland
|
OS Coordinates: |
78733 / 78733
|
Development Status: |
Operational
|
Application Submitted: |
9/29/2006
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
2/17/2015
|
|
|
Generator Live |
1/4/2017
|
This Record Last Updated: |
7/4/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
9/8/2015 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Cregganconroe WF
|
Generator Type: |
On-shore wind (NIRO code = NQ)
|
Scheme : |
RO
|
Generator ID: |
R01123NQNI
|
Capacity: |
13800
|
Status: |
Live
|
Accreditation Date: |
9/29/2006
|
|
|
Commission Date: |
1/4/2017
|
|
|
Applicant: |
CREGGANCONROE WINDFARM LIMITED
|
Applicant Address: |
2ND FLOOR PRINCES STREET
14 CLARENDON ROAD
BELFAST
BT1 3BG
Northern Ireland
|
Address: |
Loughmallon Rd
Pomeroy
Dungannon
BT70 2SX
Northern Ireland
|
Site Name: |
Cregganconroe WF
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01066NWNI
|
Capacity: |
13800
|
Status: |
Live
|
Accreditation Date: |
9/29/2006
|
|
|
Commission Date: |
1/4/2017
|
|
|
Applicant: |
CREGGANCONROE WINDFARM LIMITED
|
Applicant Address: |
2ND FLOOR PRINCES STREET
14 CLARENDON ROAD
BELFAST
BT1 3BG
Northern Ireland
|
Address: |
Loughmallon Rd
Pomeroy
Dungannon
BT70 2SX
Northern Ireland
|
|
Assumptions: Capacity: 13800kW 13.8 MW, Thus over the month Capacity * 720 hours per month = 9936 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 3842 | 27.84% | Issued | 01/11/2017 | | | 26 | 0.19% | Revoked | 01/09/2017 | | | 2936 | 21.28% | Retired | 01/08/2017 | | | 2298 | 16.65% | Issued | 01/07/2017 | | | 342 | 2.48% | Retired | 01/07/2017 | | | 1840 | 13.33% | Retired | 01/06/2017 | | | 2438 | 17.67% | Retired | 01/05/2017 | | | 2030 | 14.71% | Issued | 01/04/2017 | | | 2140 | 15.51% | Issued | 01/03/2017 | | | 1166 | 8.45% | Issued | 01/02/2017 | | | 644 | 4.67% | Issued | 01/01/2017 | | | 113 | 0.82% | Issued |
|
Capacity: 10 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 31 m/s (69.347 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 1/15/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|