Loading
Page views this IP this session = 1 of 10 unsubscribed pagesCrook Hill Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Crook Hill Wind Farm (Wind , Active) Location in the UK : England, Lancashire Type of installation: Wind on/offshore: on Turbines :12 Capacity : 36 MW Approx Date of 1st power generation: 2012
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
After further examination of the site area, and in light of securing planning approval for 12 turbines, Coronation has chosen to submit two revised applications to the local planning authorities. Each application is identical in size and each takes account of the previous approvals but differ with regard to the proposed access routes to and from the site. These applications have now been submitted to the Local Planning Authority.
refused October 2008, revised plan with 12 turbines, approved June 2011
Model: |
Nordex N90
|
Start Speed: |
4
|
Capacity: |
2.3
|
Optimal Speed: |
12
|
Rotor Diameter: |
90
|
Stop Speed: |
25
|
Hub Height |
80 Avg for all turbines:80
|
Avg. Elevation: |
385
|
Web Page: |
http://www.nordex-online.com/en/produkte-service/wind-turbines/n90-25-mw.html |
Comment: |
N90 suits inland locations
|
Land Gate Lane Off 255 Market Street Shawforth Rochdale OL12 8EG England
Relationship |
Company (For:
Crook Hill
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Crook Hill (Calderdale MBC) 1 of 2 13.6 MW
|
Energy Type: |
Wind Onshore |
County: |
Greater Manchester Country: England LPA: Calderdale Metropolitan Borough Council
|
Site ID and Reference: |
4354 / A0458
District:
|
Applicant: |
Infrared Capital Partners
Application :
08/01281/WDF
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
4 |
Turbine Capacity: |
3.3999999999999999 |
Height of Turbines: |
|
Calculated capacity: |
13.6 |
Site Address: |
Crook Hill/Shore Moor, North Of Watergrove Reservoir, Rochdale
|
|
|
County: |
Greater Manchester Region: North West
|
OS Coordinates: |
392720 / 392720
|
Development Status: |
Operational
|
Application Submitted: |
8/4/2008
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/1/2015
|
|
|
Generator Live |
12/1/2015
|
This Record Last Updated: |
1/4/2016
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Crook Hill (Rochdale MBC) 2 of 2 23.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Greater Manchester Country: England LPA: Rochdale Borough Council
|
Site ID and Reference: |
4659 / EN00589
District:
|
Applicant: |
Infrared Capital Partners
Application :
08/D51145
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
7 |
Turbine Capacity: |
3.3999999999999999 |
Height of Turbines: |
|
Calculated capacity: |
23.8 |
Site Address: |
Crook Hill/Shore Moor, North Of Watergrove Reservoir, Rochdale
|
|
|
County: |
Greater Manchester Region: North West
|
OS Coordinates: |
392515 / 392515
|
Development Status: |
Operational
|
Application Submitted: |
7/10/2008
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
10/29/2008
|
Construction Date: |
1/1/2015
|
|
|
Generator Live |
12/1/2015
|
This Record Last Updated: |
1/4/2016
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
10/29/2008 |
Site Name: |
Crook Hill (Calderdale MBC) 15 MW
|
Energy Type: |
Wind Onshore |
County: |
Greater Manchester Country: England LPA: Calderdale Metropolitan Borough Council
|
Site ID and Reference: |
3945 / EN00235
District:
|
Applicant: |
Coronation Power
Application :
07/00632/WDF
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
5 |
Turbine Capacity: |
3 |
Height of Turbines: |
|
Calculated capacity: |
15 |
Site Address: |
4km north of Rochdale and 2km east of Whitworth, on the high ground of Shore Moor to the north of the village of Wardle and Watergrove Reservoir
|
|
|
County: |
Greater Manchester Region: North West
|
OS Coordinates: |
392720 / 392720
|
Development Status: |
Revised
|
Application Submitted: |
3/20/2007
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
5/9/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Crook Hill (Rochdale MBC) 14 MW
|
Energy Type: |
Wind Onshore |
County: |
Greater Manchester Country: England LPA: Rochdale Borough Council
|
Site ID and Reference: |
3482 / 07036W5
District:
|
Applicant: |
Coronation Power
Application :
07/D48920
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
7 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
14 |
Site Address: |
Nr Watergrove Reservoir, Littleborough,
|
|
|
County: |
Greater Manchester Region: North West
|
OS Coordinates: |
393000 / 393000
|
Development Status: |
Revised
|
Application Submitted: |
3/20/2007
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
10/8/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Crook Hill
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00341RQEN
|
Capacity: |
36300
|
Status: |
Live
|
Accreditation Date: |
3/20/2007
|
|
|
Commission Date: |
9/19/2015
|
|
|
Applicant: |
Crook Hill Properties Limited
|
Applicant Address: |
12 Charles II Street
London
SW1Y 4QY
England
|
Address: |
Land Gate Lane
Off 255 Market Street
Shawforth
Rochdale
OL12 8EG
England
|
Site Name: |
Crook Hill
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02801NWEN
|
Capacity: |
36300
|
Status: |
Live
|
Accreditation Date: |
3/20/2007
|
|
|
Commission Date: |
9/19/2015
|
|
|
Applicant: |
Crook Hill Properties Limited
|
Applicant Address: |
12 Charles II Street
London
SW1Y 4QY
England
|
Address: |
Land Gate Lane
Off 255 Market Street
Shawforth
Rochdale
OL12 8EG
England
|
|
Assumptions: Capacity: 36300kW 36.3 MW, Thus over the month Capacity * 720 hours per month = 26136 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 9477 | 26.11% | Issued | 01/03/2018 | | | 8725 | 24.04% | Issued | 01/02/2018 | | | 9974 | 27.48% | Issued | 01/01/2018 | | | 13884 | 38.25% | Issued | 01/12/2017 | | | 12059 | 33.22% | Retired | 01/11/2017 | | | 11022 | 30.36% | Retired | 01/10/2017 | | | 14306 | 39.41% | Retired | 01/09/2017 | | | 8712 | 24.00% | Retired | 01/08/2017 | | | 7730 | 21.29% | Retired | 01/07/2017 | | | 7149 | 19.69% | Issued | 01/06/2017 | | | 8883 | 24.47% | Retired | 01/05/2017 | | | 8732 | 24.06% | Issued | 01/04/2017 | | | 8663 | 23.87% | Issued | 01/03/2017 | | | 11933 | 32.87% | Issued | 01/02/2017 | | | 11511 | 31.71% | Issued | 01/01/2017 | | | 8136 | 22.41% | Issued | Dec-16 | 0 | 10403 | 11559 | 31.84% | Pending Tr | Nov-16 | 0 | 8150 | 9055 | 24.94% | Pending Tr | Oct-16 | 0 | 6373 | 7081 | 19.51% | Pending Tr | Sep-16 | 0 | 7773 | 8637 | 23.79% | Pending Tr | Aug-16 | 0 | 7442 | 8269 | 22.78% | Issued | Jul-16 | 0 | 6395 | 7106 | 19.58% | Pending Tr | Jul-16 | 0 | 6395 | 7106 | 19.58% | Pending Tr | Jun-16 | 0 | 3552 | 3947 | 10.87% | Pending Tr | May-16 | 0 | 7896 | 8773 | 24.17% | Pending Tr | Apr-16 | 0 | 7080 | 7866 | 21.67% | Pending Tr | Mar-16 | 0 | 8266 | 9184 | 25.30% | Redeemed | Feb-16 | 0 | 10370 | 11522 | 31.74% | Redeemed | Jan-16 | 0 | 11129 | 12366 | 34.07% | Redeemed | Dec-15 | 0 | 14504 | 16115 | 44.39% | Redeemed | Nov-15 | 0 | 11135 | 12372 | 34.08% | Redeemed | Sep-15 | 0 | 227 | 253 | 0.70% | Redeemed |
|
Capacity: 72 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|