Sorry I found no matches, Please try again. 176
vid = 125pws_id = 352266pws_id = 352266 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.23.101.186 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Cumberhead Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Cumberhead Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Coalburn    
Type of installation: Wind    on/offshore: on
Turbines :21  Capacity : 50 MW
Approx Date of 1st power generation: November 2022

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Cumberhead Forest Complex:

Nutberry wind farm ??

 Turbine Make and Specs

Model: Nordex N133 Start Speed: 3
Capacity: 4.8 Optimal Speed: 0
Rotor Diameter: 133 Stop Speed: 28
Hub Height 90   Avg for all turbines:90 Avg. Elevation: 419
Web Page: https://www.nordex-online.com/en/product/n133-4-8/
Comment:

 Address

 Associated Companies.

Relationship Company (For: Cumberhead )
DeveloperScottish Power Renewables
OwnerScottish Power Renewables
OperatorScottish Power Renewables

 DECC Data on this Project: Cumberhead :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Cumberhead Wind Farm     48 MW
Energy Type: Wind Onshore
County: South Lanarkshire     Country: Scotland     LPA: South Lanarkshire Council
Site ID and Reference: 5455 /     District:
Applicant: Octopus Renewables Infrastructure Trust     Application : CL/15/0231 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 12 Turbine Capacity: 0
Height of Turbines: Calculated capacity:
Site Address: Cumberhead, Lanark, Strathclyde
  ML11 0HN
County: South Lanarkshire Region: Scotland
OS Coordinates: 276581 / 276581
Development Status: Operational
Application Submitted: 6/19/2015 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 10/1/2021    
Generator Live 9/11/2023 This Record Last Updated: 4/5/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Cumberhead: Wind :

 Calculations


Capacity: 99.9600000000001
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 28 m/s (62.636 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/3/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 99.9600000000001 start: 5 Optimum: 15/ Stop: 28 / wind: / ratio 352266

Project Info
CUMBERHEAD West Wind Farm
3R Energy, on behalf of CUMBERHEAD West Wind Farm Ltd, has submitted an application to the Scottish Government Energy Consents Unit (ECU)

Nordex Group receives order for 50 MW from Scotland
The 50 MW CUMBERHEAD wind farm is located in the county of South Lanarkshire, Scotland. Construction works on site have already commenced and are on-track for the wind farm to be fully operational by the end of 2022.

CUMBERHEAD Wind Farm application

CUMBERHEAD Wind Farm planning docs

Nutberry Wind Energy Ltd

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School