Sorry I found no matches, Please try again. 176
vid = 1292pws_id = 353272pws_id = 353272 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.22.130.228 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Welbeck Energy from Waste Plant

Welbeck (Waste , Active, Waste - Landfill Gas)

 General Information.

Location in the UK : England, Yorkshire    
Type of installation: Waste    on/offshore: on
Turbines :0  Capacity : 6.7 MW
Approx Date of 1st power generation: March 2009

/YES

 Comment

Fueled by methane (mine gas) from deep coal mines that would otherwise be vented or burnt off.

 Address

Welbeck Landfill Site Boundary Lane Normanton Wakefield WF6 2JA England

 Associated Companies.

Relationship Company (For: Welbeck )
Developerinfinis

 DECC Data on this Project: Welbeck :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name:     MW
Energy Type:
County:     Country:     LPA:
Site ID and Reference: /     District:
Applicant:     Application : (Go to search to find Application)
Site Address:
 
County: Region:
OS Coordinates: /
Development Status:
Application Submitted: Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated:
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Welbeck: Waste :

Site Name: Welbeck (Infinis)
Generator Type: Landfill gas (RO code = RJ)
Scheme : RO Generator ID: R00599RJEN
Capacity: 6720 Status: Live
Accreditation Date:    
Commission Date: 3/24/2009    
Applicant: Infinis Limited
Applicant Address: First Floor 500 Pavilion Drive Northampton Business Park Northampton NN4 7YJ
Address: Welbeck Landfill Site Boundary Lane Normanton Wakefield WF6 2JA England

Site Name: Welbeck (Infinis)
Generator Type: Landfill Gas (REGO code = LG)
Scheme : REGO Generator ID: G01445LGEN
Capacity: 6720 Status: Live
Accreditation Date:    
Commission Date: 3/24/2009    
Applicant: Infinis Limited
Applicant Address: First Floor 500 Pavilion Drive Northampton Business Park Northampton NN4 7YJ
Address: Welbeck Landfill Site Boundary Lane Normanton Wakefield WF6 2JA England
 
Assumptions: Capacity: 6720kW 6.72 MW,
Thus over the month Capacity * 720 hours per month = 4838.4 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 1868 27.80% Issued
01/02/2018 13 0.19% Issued
01/02/2018 1542 22.95% Issued
01/01/2018 14 0.21% Issued
01/01/2018 1778 26.46% Issued
01/12/2017 2089 31.09% Issued
01/12/2017 13 0.19% Issued
01/11/2017 2131 31.71% Issued
01/11/2017 11 0.16% Issued
01/10/2017 11 0.16% Issued
01/10/2017 2193 32.63% Issued
01/09/2017 2310 34.38% Issued
01/09/2017 10 0.15% Issued
01/08/2017 9 0.13% Issued
01/08/2017 2465 36.68% Issued
01/07/2017 8 0.12% Issued
01/07/2017 2436 36.25% Issued
01/06/2017 8 0.12% Issued
01/06/2017 2330 34.67% Issued
01/05/2017 2370 35.27% Issued
01/05/2017 10 0.15% Issued
01/04/2017 2286 34.02% Issued
01/04/2017 11 0.16% Issued
01/03/2017 2363 35.16% Issued
01/03/2017 14 0.21% Issued
01/02/2017 13 0.19% Issued
01/02/2017 2247 33.44% Redeemed
01/01/2017 2625 39.06% Redeemed
01/01/2017 16 0.24% Issued
Dec-16 02727 16 0.24% Issued
Nov-16 02799 2784 41.43% Issued
Oct-16 02866 14 0.21% Issued
Sep-16 02925 12 0.18% Issued
Aug-16 03048 3036 45.18% Issued
Jul-16 02930 2918 43.42% Issued
Jul-16 02930 2918 43.42% Issued
Jun-16 02915 14 0.21% Issued
Jun-16 02915 2901 43.17% Issued
May-16 02953 14 0.21% Issued
Apr-16 03000 15 0.22% Issued
Feb-16 02715 17 0.25% Issued
Jan-16 02950 2931 43.62% Redeemed
Dec-15 03095 18 0.27% Issued
Nov-15 03068 18 0.27% Issued
Oct-15 03403 3387 50.40% Redeemed
Sep-15 03379 11 0.16% Issued
Aug-15 03447 3447 51.29% Redeemed
Jul-15 35253524 3524 52.44% Redeemed
Jun-15 35123512 3512 52.26% Redeemed
May-15 33063306 3306 49.20% Redeemed
Apr-15 31023102 3102 46.16% Redeemed
Mar-15 36323631 3631 54.03% Redeemed
Feb-15 31893189 3189 47.46% Redeemed
Jan-15 36843684 3684 54.82% Redeemed
Dec-14 37233723 3723 55.40% Redeemed
Nov-14 38503849 3849 57.28% Redeemed
Oct-14 40374038 4038 60.09% Redeemed
Sep-14 36913691 3691 54.93% Redeemed
Aug-14 34463446 3446 51.28% Redeemed
Jul-14 35053505 3505 52.16% Redeemed
Jun-14 36633664 3664 54.52% Redeemed
May-14 37593758 3758 55.92% Redeemed
Apr-14 37293729 3729 55.49% Redeemed
Mar-14 35813581 3581 53.29% Redeemed
Feb-14 32363236 3236 48.15% Redeemed
Jan-14 36373637 1 0.01% Redeemed
Dec-13 37803780 3780 56.25% Redeemed
Nov-13 36973697 3697 55.01% Redeemed
Oct-13 39243925 3925 58.41% Redeemed
Sep-13 37803779 3779 56.24% Redeemed
Aug-13 38413841 3841 57.16% Redeemed
Jul-13 41444143 4143 61.65% Redeemed
Jun-13 40494050 4050 60.27% Redeemed
May-13 43404340 4340 64.58% Redeemed
Apr-13 37353735 3735 55.58% Redeemed
Mar-13 41394139 4139 61.59% Redeemed
Feb-13 38433843 3843 57.19% Redeemed
Jan-13 44874486 4486 66.76% Redeemed
Dec-12 43624362 4362 64.91% Redeemed
Nov-12 39273927 3927 58.44% Redeemed
Oct-12 40924093 4093 60.91% Redeemed
Sep-12 40644064 4064 60.48% Redeemed
Aug-12 42264226 4226 62.89% Redeemed
Jul-12 42254224 4224 62.86% Redeemed
Jun-12 43254326 4326 64.38% Redeemed
May-12 43724371 4371 65.04% Redeemed
Apr-12 41294129 4129 61.44% Redeemed
Mar-12 40584058 4058 60.39% Redeemed
Feb-12 37193719 3116 46.37% Redeemed
Jan-12 41994199 4199 62.49% Redeemed
Dec-11 43424342 4342 64.61% Redeemed
Nov-11 42334233 4233 62.99% Redeemed
Oct-11 42524252 4252 63.27% Redeemed
Sep-11 41394139 4139 61.59% Redeemed
Aug-11 42854285 4285 63.76% Redeemed
Jul-11 39523952 3952 58.81% Redeemed
Jun-11 35833583 3583 53.32% Redeemed
May-11 39853986 3986 59.32% Redeemed
Apr-11 41144113 4113 61.21% Redeemed
Mar-11 42784278 4278 63.66% Expired
Feb-11 37153715 3715 55.28% Expired
Jan-11 38133814 3814 56.76% Expired
Dec-10 38433843 3843 57.19% Expired
Nov-10 35793579 3579 53.26% Expired

Project Info
WELBECK Solar Farm Developments
A 32-acre solar farm at Hunciecroft will generate 7.5MW of low carbon electricity; sufficient energy to power 2,150 homes in the local area. The 70-acre site at Hazel Gap will produce 16MW of solar power,

UK Coal

Berr: Renewables Network Impact Study

Harworth Estates partners with Anesco to install 30MW of solar
Construction has already begun on the first project in the portfolio, an 11.2MW solar farm at the WELBECK Colliery in Mansfield. Following its completion, work will begin on two 5.74MW projects at Gedling and Blisthorpe.

Anesco poised to transform former collieries with 30MW solar array
The project will begin with the development of three sites in Nottinghamshire: WELBECK Colliery in Mansfield, Gedling in Lambley and a third site in Bilsthorpe. A fourth site at Askern in South Yorkshire is awaiting planning consent.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School