Sorry I found no matches, Please try again. 176
vid = 1350pws_id = 351141pws_id = 351141
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.144.29.213 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Wern Ddu Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Wern Ddu Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, North Wales, Merseyside & Cheshire    
Type of installation: Wind    on/offshore: on
Turbines :4  Capacity : 8 MW
Approx Date of 1st power generation: March 2010

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

(Craig Lelo)
Located between Gwyddelwern & Ruthin in North Wales Wern Ddu lies at the eastern the edge of Strategic Search Area A; one of seven areas identified by the Welsh Assembly Government as being suited to development of this kind.

The scheme would provide electricity for the needs of at least 4,500 homes in the locality and would make a 6% contribution to the Area A 2010 target.

 Turbine Make and Specs

Model: Enercon E70 Start Speed: 4
Capacity: 2.3 Optimal Speed: 13.5
Rotor Diameter: 71 Stop Speed: 31
Hub Height 55   Avg for all turbines:55 Avg. Elevation: 279
Web Page: http://www.enercon.de/en-en/61.htm
Comment: Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate

 Address

Wern Ddugwyddelwern Corwen LL21 9SB Wales

 Associated Companies.

Relationship Company (For: Wern Ddu )
DeveloperTegni
OwnerTriodos

 DECC Data on this Project: Wern Ddu :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Wern Ddu Wind Farm     9.2 MW
Energy Type: Wind Onshore
County: Clwyd     Country: Wales     LPA: Denbighshire County Council
Site ID and Reference: 3592 / 04056W4     District:
Applicant: Tegni     Application : 6/2004/278/PS (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 9.2
Site Address: NW Corwen, Gwyddelwern, Corwen, Denbighshire
 
County: Clwyd Region: Wales
OS Coordinates: 305800 / 305800
Development Status: Operational
Application Submitted: 4/23/2004 Planning Permission Granted
Application Determined: Permission refused: 1/26/2005
Construction Date: 11/1/2009    
Generator Live 3/1/2010 This Record Last Updated: 4/26/2010
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 1/26/2005

 OFGEM Data on this Project: Wern Ddu: Wind :

Site Name: Wern Ddu
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00190RQWA
Capacity: 9140 Status: Live
Accreditation Date: 4/23/2004    
Commission Date: 3/3/2010    
Applicant: Triodos Renewables Ltd
Applicant Address: Triodos Bank Deanery Road Bristol BS1 5AS England
Address: Wern Ddu gwyddelwern Corwen LL21 9SB Wales

Site Name: Wern Ddu
Generator Type: Wind
Scheme : REGO Generator ID: G01350NWWA
Capacity: 9140 Status: Live
Accreditation Date: 4/23/2004    
Commission Date: 3/3/2010    
Applicant: Triodos Renewables Ltd
Applicant Address: Triodos Bank Deanery Road Bristol BS1 5AS England
Address: Wern Ddu gwyddelwern Corwen LL21 9SB Wales
 
Assumptions: Capacity: 9140kW 9.14 MW,
Thus over the month Capacity * 720 hours per month = 6580.8 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 2055 22.48% Issued
01/02/2018 1885 20.62% Issued
01/01/2018 2893 31.65% Issued
01/12/2017 2146 23.48% Issued
01/11/2017 1829 20.01% Issued
01/10/2017 3078 33.68% Issued
01/09/2017 1456 15.93% Issued
01/08/2017 1272 13.92% Issued
01/07/2017 1277 13.97% Issued
01/06/2017 1708 18.69% Issued
01/05/2017 1216 13.30% Issued
01/04/2017 1187 12.99% Issued
01/03/2017 2010 21.99% Redeemed
01/02/2017 2365 25.88% Redeemed
01/01/2017 1800 19.69% Redeemed
Dec-16 01988 1988 21.75% Issued
Nov-16 01595 1595 17.45% Issued
Oct-16 01088 1088 11.90% Issued
Sep-16 01712 1712 18.73% Issued
Aug-16 01708 1708 18.69% Issued
Jul-16 01122 1122 12.28% Issued
Jul-16 01122 1122 12.28% Issued
Jun-16 0637 637 6.97% Issued
May-16 01050 1050 11.49% Issued
Apr-16 01383 1383 15.13% Issued
Mar-16 01691 1691 18.50% Redeemed
Feb-16 02305 2305 25.22% Redeemed
Jan-16 02707 2707 29.62% Redeemed
Dec-15 03772 3772 41.27% Redeemed
Nov-15 03256 3256 35.62% Redeemed
Oct-15 0744 744 8.14% Redeemed
Sep-15 0844 844 9.23% Redeemed
Aug-15 01214 1214 13.28% Redeemed
Jul-15 16111611 1611 17.63% Redeemed
Jun-15 12981298 1298 14.20% Redeemed
May-15 23302330 2330 25.49% Redeemed
Apr-15 15121512 1512 16.54% Redeemed
Mar-15 26142614 2614 28.60% Redeemed
Feb-15 18471847 1847 20.21% Redeemed
Jan-15 36023602 3602 39.41% Redeemed
Dec-14 32013201 3201 35.02% Redeemed
Nov-14 13871388 1388 15.19% Redeemed
Oct-14 24782478 2478 27.11% Redeemed
Sep-14 468468 468 5.12% Redeemed
Aug-14 18901890 1890 20.68% Redeemed
Jul-14 877878 878 9.61% Redeemed
Jun-14 477476 476 5.21% Redeemed
May-14 13071308 1308 14.31% Redeemed
Apr-14 11861186 1186 12.98% Redeemed
Mar-14 21032103 2103 23.01% Redeemed
Feb-14 30543054 3054 33.41% Redeemed
Jan-14 26822683 2682 29.34% Redeemed
Dec-13 35633563 3563 38.98% Expired
Nov-13 15321532 1532 16.76% Redeemed
Oct-13 22392239 1 0.01% Redeemed
Sep-13 11941194 1194 13.06% Redeemed
Aug-13 11801181 1181 12.92% Redeemed
Jul-13 614616 616 6.74% Redeemed
Jun-13 12451245 1245 13.62% Redeemed
May-13 22532254 2254 24.66% Redeemed
Apr-13 23252325 2325 25.44% Redeemed
Mar-13 17481749 1749 19.14% Redeemed
Feb-13 14521452 1452 15.89% Redeemed
Jan-13 19661967 1967 21.52% Redeemed
Dec-12 25102510 2510 27.46% Redeemed
Nov-12 18641864 1864 20.39% Redeemed
Oct-12 14131414 1414 15.47% Redeemed
Sep-12 19241925 1925 21.06% Redeemed
Aug-12 11701171 1171 12.81% Redeemed
Jul-12 925926 926 10.13% Redeemed
Jun-12 16631663 1663 18.19% Redeemed
May-12 12421243 1243 13.60% Redeemed
Apr-12 15431544 1544 16.89% Redeemed
Mar-12 12281228 1228 13.44% Redeemed
Feb-12 19611962 1962 21.47% Redeemed
Jan-12 31113111 3111 34.04% Redeemed
Dec-11 40634063 4063 44.45% Redeemed
Nov-11 21192119 2119 23.18% Redeemed
Oct-11 29202920 2920 31.95% Redeemed
Sep-11 24262426 2426 26.54% Redeemed
Aug-11 10981099 1099 12.02% Redeemed
Jul-11 739740 740 8.10% Redeemed
Jun-11 12741274 1274 13.94% Redeemed
May-11 27512752 2752 30.11% Redeemed
Apr-11 12381238 1238 13.54% Redeemed
Mar-11 11441146 1146 12.54% Redeemed
Feb-11 20362037 2037 22.29% Redeemed
Jan-11 16501651 1651 18.06% Redeemed
Dec-10 716717 717 7.84% Redeemed
Nov-10 18791880 1880 20.57% Redeemed

 Calculations


Capacity: 16
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 31 m/s (69.347 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/23/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 16 start: 5 Optimum: 15/ Stop: 31 / wind: / ratio 351141

Project Info
BWEA Wales Renewable Energy Bulletin Issue 05 - May 2007

Protest groups unite to fight wind farms

Tegni

(2010) Triodos Renewables Powers Up
Triodos Renewables has announced that its latest wind farm is fully operational. Commissioning the four-turbine 9.2MW WERN DDU wind farm in Denbighshire, North Wales, is a major boost to the company,

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School