Dummuie Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Dummuie Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Aberdeenshire    
Type of installation: Wind    on/offshore: on
Turbines :7  Capacity : 10.4 MW
Approx Date of 1st power generation: April 2007

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The Dummuie Wind Farm, developed and built by Eco2, started operating in April 2007. Located in Huntly, Aberdeenshire, it is now owned by IKEA Energy Services Ltd with Eco2 providing operational services.

 Turbine Make and Specs

Model: Vestas V66 Start Speed: 5
Capacity: 2 Optimal Speed: 15
Rotor Diameter: 66 Stop Speed: 25
Hub Height 47   Avg for all turbines:47 Avg. Elevation: 265
Web Page:
Comment:

 Address

East Mains Dummuie Drumblade Huntly Aberdeensh AB54 4RL Scotland

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Dummuie )

 DECC Data on this Project: Dummuie :3200

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Dummuie     12.3 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Aberdeenshire Council
Site ID and Reference: 3200 / N00211W     District:
Applicant: Tetro Energy Ltd (ECO2)     Application : APP/2003/0084 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 7 Turbine Capacity: 1.75
Height of Turbines: Calculated capacity: 12.25
Site Address: East Dummuie Huntly
 
County: Grampian Region: Scotland
OS Coordinates: 358600 / 358600
Development Status: Operational
Application Submitted: 8/20/2003 Planning Permission Granted
Application Determined: Permission refused: 2/20/2004
Construction Date: 6/1/2006    
Generator Live 1/1/2007 This Record Last Updated: 6/4/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 2/20/2004

 OFGEM Data on this Project: Dummuie: Wind : R00075SQSC

Site Name: Dummuies Windfarm - A
Generator Type: On-shore wind (ROS code = SQ)
Scheme : RO Generator ID: R00075SQSC
Capacity: 12250 Status: Live
Accreditation Date: 8/20/2003    
Commission Date: 1/1/2007    
Applicant: Dummuies Windfarm Huntly Limited
Applicant Address: Vision House, Oak Tree Court Mulberry Drive Cardiff Gate Business Park Cardiff CF23 8RS Wales
Address: Dummuies Windfarm - A (01.02.07) East MainsDummuieDrumbladeHuntlyAberdeensh AB54 4RL Scotland

 Calculations


Capacity: 24.5
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/3/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 24.5 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 352255

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School