Loading
Page views this IP this session = 1 of 10 unsubscribed pagesBRIXWORTH Energy from Waste Plant
BRIXWORTH (Waste , Active, Waste - EFW) Location in the UK : England, East Midlands Type of installation: Waste on/offshore: on Turbines :0 Capacity : 0.575 MW Approx Date of 1st power generation: November 1997
/YES
Scalwell Lane, Brixworth, Northampshire, NN1 2HZ
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Brixworth Windfarm 13 MW
|
Energy Type: |
Wind Onshore |
County: |
Northamptonshire Country: England LPA: Daventry District Council
|
Site ID and Reference: |
3066 / EN00590
District:
|
Applicant: |
Bolsterstone Plc
Application :
DA/2008/1252
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
6 |
Turbine Capacity: |
2.1499999999999999 |
Height of Turbines: |
|
Calculated capacity: |
12.9 |
Site Address: |
Land adjacent to Harborough Road, between Brixworth and Hanging Houghton
|
|
|
County: |
Northamptonshire Region: East Midlands
|
OS Coordinates: |
474345 / 474345
|
Development Status: |
Planning Application Withdrawn
|
Application Submitted: |
8/29/2008
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
6/22/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
3/11/2009 |
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
Sorry I found no matches, Please try again.
|
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|