Page views this IP this session = 1 of 10 unsubscribed pagesEglish Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Eglish Wind Farm (Wind , Active) Location in the UK : N.Ireland, Co Londonderry Type of installation: Wind on/offshore: on Turbines :6 Capacity : 15 MW Approx Date of 1st power generation: January 2017
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Proposal: Amendment to proposed wind farm to include reduction from 9 turbines (overall height of 115m) to 6 turbines with an overall height of 107m, amended layout, revised access point onto Longland Road, access tracks, switchyard containing control building & substation and anemometer mast (70m high)
Model: |
Nordex N80
|
Start Speed: |
4
|
Capacity: |
2.5
|
Optimal Speed: |
13
|
Rotor Diameter: |
80
|
Stop Speed: |
25
|
Hub Height |
70 Avg for all turbines:70
|
Avg. Elevation: |
211
|
Web Page: |
http://vetropark.org/d/59743/d/nordex_n80-n90_gb.pdf |
Comment: |
N80 suits High Wind Areas
|
Ballyarten RoadKillalooLondonderry BT47 3TA Northern Ireland
Relationship |
Company (For:
Eglish
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Eglish Mountain 13.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Tyrone Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
4264 / N00358W
District:
|
Applicant: |
ESB (Northern Wind Power)
Application :
A/2005/0223/F
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
6 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
13.8 |
Site Address: |
Eglish Mountain in the townlands of Ballyartan and Glenlough (Co. Derry) and Ballyneaner (Co. Tyrone), accessing onto Ballyartan Road, Killaloo, Londonderry BT47 3TA
|
|
|
County: |
Co. Tyrone Region: Northern Ireland
|
OS Coordinates: |
65774 / 65774
|
Development Status: |
Operational
|
Application Submitted: |
2/1/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
10/25/2015
|
|
|
Generator Live |
1/13/2017
|
This Record Last Updated: |
6/30/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
7/29/2018 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Eglish
|
Generator Type: |
On-shore wind (NIRO code = NQ)
|
Scheme : |
RO
|
Generator ID: |
R00811NQNI
|
Capacity: |
14000
|
Status: |
Live
|
Accreditation Date: |
2/1/2005
|
|
|
Commission Date: |
1/13/2017
|
|
|
Applicant: |
Hunters Hill Windfarm Ltd
|
Applicant Address: |
2 Electra Road
Maydown
Londonderry
BT47 6UL
Northern Ireland
|
Address: |
Ballyarten Road
Killaloo
Londonderry
BT47 3TA
Northern Ireland
|
Site Name: |
Eglish
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00903NWNI
|
Capacity: |
14000
|
Status: |
Live
|
Accreditation Date: |
2/1/2005
|
|
|
Commission Date: |
1/13/2017
|
|
|
Applicant: |
Hunters Hill Windfarm Ltd
|
Applicant Address: |
2 Electra Road
Maydown
Londonderry
BT47 6UL
Northern Ireland
|
Address: |
Ballyarten Road
Killaloo
Londonderry
BT47 3TA
Northern Ireland
|
|
Assumptions: Capacity: 14000kW 14 MW, Thus over the month Capacity * 720 hours per month = 10080 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 3057 | 21.84% | Issued | 01/03/2018 | | | 4006 | 28.61% | Issued | 01/02/2018 | | | 4335 | 30.96% | Issued | 01/01/2018 | | | 5829 | 41.64% | Issued | 01/12/2017 | | | 4156 | 29.69% | Retired | 01/11/2017 | | | 2858 | 20.41% | Retired | 01/10/2017 | | | 4256 | 30.40% | Retired | 01/09/2017 | | | 3513 | 25.09% | Retired | 01/08/2017 | | | 2581 | 18.44% | Retired | 01/07/2017 | | | 2309 | 16.49% | Retired | 01/06/2017 | | | 3022 | 21.59% | Retired | 01/05/2017 | | | 2486 | 17.76% | Issued | 01/04/2017 | | | 2319 | 16.56% | Issued | 01/03/2017 | | | 2179 | 15.56% | Issued | 01/02/2017 | | | 1227 | 8.76% | Issued | 01/01/2017 | | | 188 | 1.34% | Issued |
|
Capacity: 34 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 1/15/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|