Page views this IP this session = 1 of 10 unsubscribed pagesDRIGG (ness point) Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
DRIGG (ness point) Wind Farm (Wind , Active) Location in the UK : England, Eastern England Type of installation: Wind on/offshore: on Turbines :1 Capacity : 2.75 MW Approx Date of 1st power generation: December 2004
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
(Ness Point) Nicknamed "Gulliver" after a competition in the local paper. According to the "Triodos Renewables Prospectus 2008" this single turbine stands 126 metres tall and generates 2.75MW. Triodos Renewables bought Ness Point Ltd in June 2005.
Model: |
Neg Micon NM80
|
Start Speed: |
5
|
Capacity: |
2.75
|
Optimal Speed: |
15
|
Rotor Diameter: |
40
|
Stop Speed: |
25
|
Hub Height |
86 Avg for all turbines:86
|
Avg. Elevation: |
4
|
Web Page: |
|
Comment: |
|
on a strip of coastal land immediately south of Ness Point, Lowestoft, Suffolk (previously Drigg, Cumbria(was SD 055 986
Relationship |
Company (For:
DRIGG (ness point)
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Ness point Wind Turbine 1 2.3 MW
|
Energy Type: |
Wind Onshore |
County: |
Suffolk Country: England LPA: Waveney District Council
|
Site ID and Reference: |
3105 / N00037W
District:
|
Applicant: |
SLP Energy
Application :
W14512/1
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
2.3 |
Site Address: |
Land off North Beach Industrial Estate
Off Wilde Street
Nesspoint
Lowestoft
|
|
|
County: |
Suffolk Region: Eastern
|
OS Coordinates: |
655480 / 655480
|
Development Status: |
Operational
|
Application Submitted: |
10/31/2001
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
12/1/2004
|
This Record Last Updated: |
2/3/2010
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Drigg Wind Cluster 3 MW
|
Energy Type: |
Wind Onshore |
County: |
Cumbria Country: England LPA: Copeland Borough Council
|
Site ID and Reference: |
3612 / 07128W3
District:
|
Applicant: |
Windprospect
Application :
4/96/0560
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
5 |
Turbine Capacity: |
0 |
Height of Turbines: |
|
Calculated capacity: |
|
Site Address: |
Land adjacent to Shore Road
Drigg
Seascale
Cumbria
|
|
|
County: |
Cumbria Region: North West
|
OS Coordinates: |
305500 / 305500
|
Development Status: |
Appeal Refused
|
Application Submitted: |
7/29/1996
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
11/7/1996
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
6/23/2009
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
12/30/1997 |
Granted: |
|
Appeal Granted: |
11/7/1996 |
Site Name: |
DRIGG (Ness Point)
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00150RQEN
|
Capacity: |
2735
|
Status: |
Live
|
Accreditation Date: |
7/29/1996
|
|
|
Commission Date: |
12/1/2004
|
|
|
Applicant: |
Triodos Renewables Ltd
|
Applicant Address: |
Triodos Bank
Deanery Road
Bristol
BS1 5AS
England
|
Address: |
Drigg (Ness Point)
Gas Works Road
Lowestoft Suffolk
NR32 1UZ
England
|
Site Name: |
DRIGG (Ness Point)
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00185NWEN
|
Capacity: |
2735
|
Status: |
Live
|
Accreditation Date: |
7/29/1996
|
|
|
Commission Date: |
12/1/2004
|
|
|
Applicant: |
Triodos Renewables Ltd
|
Applicant Address: |
Triodos Bank
Deanery Road
Bristol
BS1 5AS
England
|
Address: |
Drigg (Ness Point)
Gas Works Road
Lowestoft Suffolk
NR32 1UZ
England
|
|
Assumptions: Capacity: 2735kW 2.735 MW, Thus over the month Capacity * 720 hours per month = 1969.2 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 822 | 30.05% | Issued | 01/02/2018 | | | 795 | 29.07% | Issued | 01/01/2018 | | | 773 | 28.26% | Issued | 01/11/2017 | | | 460 | 16.82% | Issued | 01/10/2017 | | | 820 | 29.98% | Issued | 01/09/2017 | | | 325 | 11.88% | Issued | 01/08/2017 | | | 146 | 5.34% | Issued | 01/07/2017 | | | 390 | 14.26% | Issued | 01/06/2017 | | | 254 | 9.29% | Issued | 01/05/2017 | | | 649 | 23.73% | Issued | 01/04/2017 | | | 509 | 18.61% | Issued | 01/03/2017 | | | 21 | 0.77% | Redeemed | 01/03/2017 | | | 641 | 23.44% | Redeemed | 01/02/2017 | | | 793 | 28.99% | Redeemed | 01/01/2017 | | | 610 | 22.30% | Redeemed | Dec-16 | 0 | 459 | 459 | 16.78% | Issued | Nov-16 | 0 | 358 | 360 | 13.16% | Issued | Oct-16 | 0 | 583 | 583 | 21.32% | Issued | Sep-16 | 0 | 263 | 266 | 9.73% | Issued | Aug-16 | 0 | 464 | 464 | 16.97% | Issued | Jul-16 | 0 | 395 | 397 | 14.52% | Issued | Jul-16 | 0 | 395 | 397 | 14.52% | Issued | Jun-16 | 0 | 8 | 15 | 0.55% | Issued | May-16 | 0 | 0 | 1 | 0.04% | Issued | Apr-16 | 0 | 48 | 51 | 1.86% | Issued | Nov-15 | 0 | 727 | 727 | 26.58% | Redeemed | Oct-15 | 0 | 504 | 504 | 18.43% | Redeemed | Sep-15 | 0 | 393 | 393 | 14.37% | Redeemed | Aug-15 | 0 | 546 | 546 | 19.96% | Redeemed | Jul-15 | 448 | 448 | 448 | 16.38% | Redeemed | Jun-15 | 514 | 514 | 514 | 18.79% | Redeemed | May-15 | 531 | 531 | 531 | 19.41% | Redeemed | Apr-15 | 220 | 217 | 220 | 8.04% | Redeemed | Mar-15 | 504 | 505 | 107 | 3.91% | Redeemed | Feb-15 | 653 | 653 | 653 | 23.88% | Redeemed | Jan-15 | 974 | 974 | 974 | 35.61% | Redeemed | Dec-14 | 861 | 861 | 861 | 31.48% | Redeemed | Nov-14 | 139 | 137 | 139 | 5.08% | Redeemed | Aug-14 | 339 | 337 | 339 | 12.39% | Redeemed | Jul-14 | 325 | 322 | 324 | 11.85% | Redeemed | Jun-14 | 271 | 270 | 271 | 9.91% | Redeemed | May-14 | 474 | 475 | 475 | 17.37% | Redeemed | Apr-14 | 68 | 65 | 68 | 2.49% | Redeemed | Feb-14 | 365 | 362 | 364 | 13.31% | Redeemed | Jan-14 | 772 | 773 | 773 | 28.26% | Redeemed | Dec-13 | 559 | 559 | 559 | 20.44% | Redeemed | Nov-13 | 751 | 751 | 751 | 27.46% | Redeemed | Oct-13 | 549 | 544 | 549 | 20.07% | Redeemed | Aug-13 | 78 | 73 | 78 | 2.85% | Redeemed | Jul-13 | 219 | 217 | 219 | 8.01% | Redeemed | May-13 | 101 | 98 | 101 | 3.69% | Redeemed | Apr-13 | 692 | 691 | 691 | 25.27% | Redeemed | Mar-13 | 689 | 689 | 689 | 25.19% | Redeemed | Feb-13 | 267 | 265 | 267 | 9.76% | Redeemed | Jan-13 | 194 | 193 | 195 | 7.13% | Redeemed | Dec-12 | 652 | 652 | 652 | 23.84% | Redeemed | Nov-12 | 18 | 15 | 19 | 0.69% | Redeemed | Oct-12 | 411 | 407 | 410 | 14.99% | Redeemed | Sep-12 | 167 | 163 | 167 | 6.11% | Redeemed | Aug-12 | 44 | 39 | 44 | 1.61% | Redeemed | Jul-12 | 4 | 0 | 3 | 0.11% | Redeemed | Jun-12 | 363 | 360 | 363 | 13.27% | Redeemed | May-12 | 422 | 422 | 422 | 15.43% | Redeemed | Apr-12 | 354 | 351 | 354 | 12.94% | Redeemed | Mar-12 | 163 | 162 | 164 | 6.00% | Redeemed | Feb-12 | 551 | 550 | 550 | 20.11% | Redeemed | Jan-12 | 225 | 223 | 225 | 8.23% | Redeemed | Dec-11 | 455 | 455 | 455 | 16.64% | Redeemed | Nov-11 | 622 | 623 | 623 | 22.78% | Redeemed | Oct-11 | 830 | 830 | 830 | 30.35% | Redeemed | Sep-11 | 600 | 600 | 600 | 21.94% | Redeemed | Aug-11 | 384 | 384 | 384 | 14.04% | Redeemed | Jul-11 | 481 | 481 | 481 | 17.59% | Redeemed | Jun-11 | 545 | 545 | 545 | 19.93% | Redeemed | May-11 | 290 | 288 | 290 | 10.60% | Redeemed | Apr-11 | 212 | 211 | 212 | 7.75% | Redeemed | Mar-11 | 443 | 443 | 443 | 16.20% | Redeemed | Feb-11 | 418 | 417 | 417 | 15.25% | Redeemed | Jan-11 | 588 | 588 | 588 | 21.50% | Redeemed | Dec-10 | 366 | 363 | 366 | 13.38% | Redeemed | Nov-10 | 796 | 796 | 796 | 29.10% | Redeemed | Oct-10 | 632 | 632 | 632 | 23.11% | Redeemed |
|
Capacity: 5.5 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|