Loading
Page views this IP this session = 7 of 10 unsubscribed pagesDRIGG (ness point) Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
DRIGG (ness point) Wind Farm (Wind , Active) Location in the UK : England, Eastern England Type of installation: Wind on/offshore: on Turbines :1 Capacity : 2.75 MW Approx Date of 1st power generation: December 2004
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
(Ness Point) Nicknamed "Gulliver" after a competition in the local paper. According to the "Triodos Renewables Prospectus 2008" this single turbine stands 126 metres tall and generates 2.75MW. Triodos Renewables bought Ness Point Ltd in June 2005.
Model: |
Neg Micon NM80
|
Start Speed: |
5
|
Capacity: |
2.75
|
Optimal Speed: |
15
|
Rotor Diameter: |
40
|
Stop Speed: |
25
|
Hub Height |
86 Avg for all turbines:86
|
Avg. Elevation: |
4
|
Web Page: |
|
Comment: |
|
on a strip of coastal land immediately south of Ness Point, Lowestoft, Suffolk (previously Drigg, Cumbria(was SD 055 986
Relationship |
Company (For:
DRIGG (ness point)
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Ness point Wind Turbine 1 2.3 MW
|
Energy Type: |
Wind Onshore |
County: |
Suffolk Country: England LPA: Waveney District Council
|
Site ID and Reference: |
3105 / N00037W
District:
|
Applicant: |
SLP Energy
Application :
W14512/1
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
2.3 |
Site Address: |
Land off North Beach Industrial Estate
Off Wilde Street
Nesspoint
Lowestoft
|
|
|
County: |
Suffolk Region: Eastern
|
OS Coordinates: |
655480 / 655480
|
Development Status: |
Operational
|
Application Submitted: |
10/31/2001
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
12/1/2004
|
This Record Last Updated: |
2/3/2010
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Drigg Wind Cluster 3 MW
|
Energy Type: |
Wind Onshore |
County: |
Cumbria Country: England LPA: Copeland Borough Council
|
Site ID and Reference: |
3612 / 07128W3
District:
|
Applicant: |
Windprospect
Application :
4/96/0560
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
5 |
Turbine Capacity: |
0 |
Height of Turbines: |
|
Calculated capacity: |
|
Site Address: |
Land adjacent to Shore Road
Drigg
Seascale
Cumbria
|
|
|
County: |
Cumbria Region: North West
|
OS Coordinates: |
305500 / 305500
|
Development Status: |
Appeal Refused
|
Application Submitted: |
7/29/1996
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
11/7/1996
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
6/23/2009
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
12/30/1997 |
Granted: |
|
Appeal Granted: |
11/7/1996 |
Site Name: |
DRIGG (Ness Point)
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00150RQEN
|
Capacity: |
2735
|
Status: |
Live
|
Accreditation Date: |
7/29/1996
|
|
|
Commission Date: |
12/1/2004
|
|
|
Applicant: |
Triodos Renewables Ltd
|
Applicant Address: |
Triodos Bank
Deanery Road
Bristol
BS1 5AS
England
|
Address: |
Drigg (Ness Point)
Gas Works Road
Lowestoft Suffolk
NR32 1UZ
England
|
Site Name: |
DRIGG (Ness Point)
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00185NWEN
|
Capacity: |
2735
|
Status: |
Live
|
Accreditation Date: |
7/29/1996
|
|
|
Commission Date: |
12/1/2004
|
|
|
Applicant: |
Triodos Renewables Ltd
|
Applicant Address: |
Triodos Bank
Deanery Road
Bristol
BS1 5AS
England
|
Address: |
Drigg (Ness Point)
Gas Works Road
Lowestoft Suffolk
NR32 1UZ
England
|
|
Assumptions: Capacity: 2735kW 2.735 MW, Thus over the month Capacity * 720 hours per month = 1969.2 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 822 | 30.05% | Issued | 01/02/2018 | | | 795 | 29.07% | Issued | 01/01/2018 | | | 773 | 28.26% | Issued | 01/11/2017 | | | 460 | 16.82% | Issued | 01/10/2017 | | | 820 | 29.98% | Issued | 01/09/2017 | | | 325 | 11.88% | Issued | 01/08/2017 | | | 146 | 5.34% | Issued | 01/07/2017 | | | 390 | 14.26% | Issued | 01/06/2017 | | | 254 | 9.29% | Issued | 01/05/2017 | | | 649 | 23.73% | Issued | 01/04/2017 | | | 509 | 18.61% | Issued | 01/03/2017 | | | 641 | 23.44% | Redeemed | 01/03/2017 | | | 21 | 0.77% | Redeemed | 01/02/2017 | | | 793 | 28.99% | Redeemed | 01/01/2017 | | | 610 | 22.30% | Redeemed | Dec-16 | 0 | 459 | 459 | 16.78% | Issued | Nov-16 | 0 | 358 | 360 | 13.16% | Issued | Oct-16 | 0 | 583 | 583 | 21.32% | Issued | Sep-16 | 0 | 263 | 266 | 9.73% | Issued | Aug-16 | 0 | 464 | 464 | 16.97% | Issued | Jul-16 | 0 | 395 | 397 | 14.52% | Issued | Jul-16 | 0 | 395 | 397 | 14.52% | Issued | Jun-16 | 0 | 8 | 15 | 0.55% | Issued | May-16 | 0 | 0 | 1 | 0.04% | Issued | Apr-16 | 0 | 48 | 51 | 1.86% | Issued | Nov-15 | 0 | 727 | 727 | 26.58% | Redeemed | Oct-15 | 0 | 504 | 504 | 18.43% | Redeemed | Sep-15 | 0 | 393 | 393 | 14.37% | Redeemed | Aug-15 | 0 | 546 | 546 | 19.96% | Redeemed | Jul-15 | 448 | 448 | 448 | 16.38% | Redeemed | Jun-15 | 514 | 514 | 514 | 18.79% | Redeemed | May-15 | 531 | 531 | 531 | 19.41% | Redeemed | Apr-15 | 220 | 217 | 220 | 8.04% | Redeemed | Mar-15 | 504 | 505 | 107 | 3.91% | Redeemed | Feb-15 | 653 | 653 | 653 | 23.88% | Redeemed | Jan-15 | 974 | 974 | 974 | 35.61% | Redeemed | Dec-14 | 861 | 861 | 861 | 31.48% | Redeemed | Nov-14 | 139 | 137 | 139 | 5.08% | Redeemed | Aug-14 | 339 | 337 | 339 | 12.39% | Redeemed | Jul-14 | 325 | 322 | 324 | 11.85% | Redeemed | Jun-14 | 271 | 270 | 271 | 9.91% | Redeemed | May-14 | 474 | 475 | 475 | 17.37% | Redeemed | Apr-14 | 68 | 65 | 68 | 2.49% | Redeemed | Feb-14 | 365 | 362 | 364 | 13.31% | Redeemed | Jan-14 | 772 | 773 | 773 | 28.26% | Redeemed | Dec-13 | 559 | 559 | 559 | 20.44% | Redeemed | Nov-13 | 751 | 751 | 751 | 27.46% | Redeemed | Oct-13 | 549 | 544 | 549 | 20.07% | Redeemed | Aug-13 | 78 | 73 | 78 | 2.85% | Redeemed | Jul-13 | 219 | 217 | 219 | 8.01% | Redeemed | May-13 | 101 | 98 | 101 | 3.69% | Redeemed | Apr-13 | 692 | 691 | 691 | 25.27% | Redeemed | Mar-13 | 689 | 689 | 689 | 25.19% | Redeemed | Feb-13 | 267 | 265 | 267 | 9.76% | Redeemed | Jan-13 | 194 | 193 | 195 | 7.13% | Redeemed | Dec-12 | 652 | 652 | 652 | 23.84% | Redeemed | Nov-12 | 18 | 15 | 19 | 0.69% | Redeemed | Oct-12 | 411 | 407 | 410 | 14.99% | Redeemed | Sep-12 | 167 | 163 | 167 | 6.11% | Redeemed | Aug-12 | 44 | 39 | 44 | 1.61% | Redeemed | Jul-12 | 4 | 0 | 3 | 0.11% | Redeemed | Jun-12 | 363 | 360 | 363 | 13.27% | Redeemed | May-12 | 422 | 422 | 422 | 15.43% | Redeemed | Apr-12 | 354 | 351 | 354 | 12.94% | Redeemed | Mar-12 | 163 | 162 | 164 | 6.00% | Redeemed | Feb-12 | 551 | 550 | 550 | 20.11% | Redeemed | Jan-12 | 225 | 223 | 225 | 8.23% | Redeemed | Dec-11 | 455 | 455 | 455 | 16.64% | Redeemed | Nov-11 | 622 | 623 | 623 | 22.78% | Redeemed | Oct-11 | 830 | 830 | 830 | 30.35% | Redeemed | Sep-11 | 600 | 600 | 600 | 21.94% | Redeemed | Aug-11 | 384 | 384 | 384 | 14.04% | Redeemed | Jul-11 | 481 | 481 | 481 | 17.59% | Redeemed | Jun-11 | 545 | 545 | 545 | 19.93% | Redeemed | May-11 | 290 | 288 | 290 | 10.60% | Redeemed | Apr-11 | 212 | 211 | 212 | 7.75% | Redeemed | Mar-11 | 443 | 443 | 443 | 16.20% | Redeemed | Feb-11 | 418 | 417 | 417 | 15.25% | Redeemed | Jan-11 | 588 | 588 | 588 | 21.50% | Redeemed | Dec-10 | 366 | 363 | 366 | 13.38% | Redeemed | Nov-10 | 796 | 796 | 796 | 29.10% | Redeemed | Oct-10 | 632 | 632 | 632 | 23.11% | Redeemed |
|
Capacity: 5.5 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|