Sorry I found no matches, Please try again. 176
vid = 154pws_id = 351365pws_id = 351365
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.149.250.19 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Fairfield Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Fairfield Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Cumbria    
Type of installation: Wind    on/offshore: on
Turbines :5  Capacity : 6.5 MW
Approx Date of 1st power generation: March 2011

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Fairfield Windfarm Comprises of 5 wind turbines, underground cable network, access tracks, crane hard standings, wind monitoring mast and a small control building/sub-station.

 Turbine Make and Specs

Model: Nordex N60/1300 Start Speed: 4.5
Capacity: 1.3 Optimal Speed: 10
Rotor Diameter: 60 Stop Speed: 25
Hub Height 56   Avg for all turbines:56 Avg. Elevation: 155
Web Page: http://www.nordex-online.com/fileadmin/MEDIA/Produktinfos/EN/Nordex_N60_EN.pdf
Comment:

 Address

Pica Workington CA14 4PZ England

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Fairfield )

 DECC Data on this Project: Fairfield :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Fairfield Farm     6.5 MW
Energy Type: Wind Onshore
County: Cumbria     Country: England     LPA: Copeland Borough Council
Site ID and Reference: 3613 / EN00233     District:
Applicant: Windprospect     Application : 4/2006/2684 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 5 Turbine Capacity: 1.3
Height of Turbines: Calculated capacity: 6.5
Site Address: Fairfield Farm, Pica, Distington
 
County: Cumbria Region: North West
OS Coordinates: 301826 / 301826
Development Status: Operational
Application Submitted: 9/29/2006 Planning Permission Granted
Application Determined: Permission refused: 4/4/2007
Construction Date: 8/1/2010    
Generator Live 3/2/2011 This Record Last Updated: 6/6/2011
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 4/4/2007

 OFGEM Data on this Project: Fairfield: Wind :

Site Name: Fairfield Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00251RQEN
Capacity: 6450 Status: Live
Accreditation Date: 9/29/2006    
Commission Date: 1/31/2011    
Applicant: Rusholme Windfarm Ltd
Applicant Address: 52 Grosvenor Gardens Victoria London SW1W 0AU England
Address: Pica Workington CA14 4PZ England

Site Name: Fairfield Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G01839NWEN
Capacity: 6450 Status: Live
Accreditation Date: 9/29/2006    
Commission Date: 1/31/2011    
Applicant: Rusholme Windfarm Ltd
Applicant Address: 52 Grosvenor Gardens Victoria London SW1W 0AU England
Address: Pica Workington CA14 4PZ England
 
Assumptions: Capacity: 6450kW 6.45 MW,
Thus over the month Capacity * 720 hours per month = 4644 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 1221 18.93% Issued
01/02/2018 800 12.40% Issued
01/01/2018 1420 22.02% Issued
01/12/2017 955 14.81% Issued
01/11/2017 857 13.29% Issued
01/10/2017 1542 23.91% Issued
01/09/2017 1125 17.44% Issued
01/08/2017 1074 16.65% Issued
01/07/2017 866 13.43% Issued
01/06/2017 1332 20.65% Issued
01/05/2017 668 10.36% Issued
01/04/2017 487 7.55% Issued
01/03/2017 809 12.54% Redeemed
01/02/2017 1336 20.71% Redeemed
01/01/2017 1211 18.78% Redeemed
Dec-16 01561 1561 24.20% Issued
Nov-16 0876 876 13.58% Issued
Oct-16 0663 667 10.34% Issued
Sep-16 01487 1487 23.05% Issued
Aug-16 0981 981 15.21% Issued
Jul-16 0877 877 13.60% Issued
Jun-16 0481 486 7.53% Issued
Jun-16 0481 486 7.53% Issued
May-16 0599 599 9.29% Issued
Apr-16 0734 734 11.38% Issued
Mar-16 0942 942 14.60% Redeemed
Feb-16 01207 1207 18.71% Redeemed
Jan-16 01758 1758 27.26% Redeemed
Dec-15 02693 2693 41.75% Redeemed
Nov-15 01970 1970 30.54% Redeemed
Oct-15 0463 471 7.30% Redeemed
Sep-15 0515 519 8.05% Redeemed
Aug-15 01098 1098 17.02% Redeemed
Jul-15 963962 962 14.91% Redeemed
Jun-15 936937 937 14.53% Redeemed
May-15 13391338 1338 20.74% Redeemed
Apr-15 843838 843 13.07% Redeemed
Mar-15 17481749 1749 27.12% Redeemed
Feb-15 12591259 1259 19.52% Redeemed
Jan-15 22582258 2258 35.01% Redeemed
Dec-14 19381938 1938 30.05% Redeemed
Nov-14 10581058 1058 16.40% Redeemed
Oct-14 18791879 1879 29.13% Redeemed
Sep-14 309303 309 4.79% Redeemed
Aug-14 11901190 1190 18.45% Redeemed
Jul-14 594589 593 9.19% Redeemed
Jun-14 323318 323 5.01% Redeemed
May-14 964964 964 14.95% Redeemed
Apr-14 918918 918 14.23% Redeemed
Mar-14 14511451 1451 22.50% Redeemed
Feb-14 23362336 2336 36.22% Redeemed
Jan-14 19881988 1988 30.82% Redeemed
Dec-13 26342635 2635 40.85% Redeemed
Nov-13 11581158 1157 17.94% Redeemed
Oct-13 16751675 1 0.02% Redeemed
Sep-13 916910 915 14.19% Redeemed
Aug-13 10031003 1003 15.55% Redeemed
Jul-13 420411 420 6.51% Redeemed
Jun-13 681676 681 10.56% Redeemed
May-13 13481348 1348 20.90% Redeemed
Apr-13 14531453 1453 22.53% Redeemed
Mar-13 793790 794 12.31% Redeemed
Feb-13 842837 841 13.04% Redeemed
Jan-13 15071507 1507 23.36% Redeemed
Dec-12 15821582 1582 24.53% Redeemed
Nov-12 14511451 1451 22.50% Redeemed
Oct-12 917912 917 14.22% Redeemed
Sep-12 14051405 1405 21.78% Redeemed
Aug-12 942941 941 14.59% Redeemed
Jul-12 832827 832 12.90% Redeemed
Jun-12 909910 910 14.11% Redeemed
May-12 760754 760 11.78% Redeemed
Apr-12 11091108 1108 17.18% Redeemed
Mar-12 697691 698 10.82% Redeemed
Feb-12 10751075 1075 16.67% Redeemed
Jan-12 16471647 1647 25.53% Redeemed
Dec-11 22602260 2260 35.04% Redeemed
Nov-11 17091710 1710 26.51% Redeemed
Oct-11 18361836 1836 28.47% Redeemed
Sep-11 17621762 1762 27.32% Redeemed
Aug-11 804799 804 12.47% Redeemed
Jul-11 486479 486 7.53% Redeemed
Jun-11 679678 678 10.51% Redeemed
May-11 17031703 1703 26.40% Redeemed
Apr-11 10641064 1064 16.50% Redeemed
Mar-11 726719 726 11.26% Redeemed
Feb-11 804804 804 12.47% Redeemed
Jan-11 128 13 0.20% Redeemed

 Calculations


Capacity: 13
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/23/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 13 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 351365

Project Info
FAIRFIELD Windfarm

Work starts on Bio Groups £5m Stockport green gas plant
Green energy firm Bio Group has teamed-up with British Gas to create the facility, on the site of the former Ashton Road Landfill site, in Stockport. The FAIRFIELD Bio Energy plant will be open in Autumn 2012

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School