Billinge Hill Quarry Energy from Waste Plant

Billinge Hill Quarry (Waste , Active, Waste - EFW)

 General Information.

Location in the UK : England, North West    
Type of installation: Waste    on/offshore: on
Turbines :0  Capacity : 1 MW
Approx Date of 1st power generation: April 1998

/YES

 Comment

Landfill was first opened in June 1988 by merseyside waste disposal , Then ran for the waste diosal authority by meseyside waste ltd until August 2001 ,after shutting it took approx 10 years to cap off the landfill and restore back to its prevent state park land , the generators were run by a company called CPL. coal products ltd from Yorkshire on behalf of the waste disposal company Mersey waste

 Address

Rainford Road, Billinge, St Helens, Merseyside, WN5 7PF

 Associated Companies.

Relationship Company (For: Billinge Hill Quarry )
DeveloperBidstone Methane
OwnerBidstone Methane
OperatorBidstone Methane

 DECC Data on this Project: Billinge Hill Quarry :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Billinge Hill Quarry Landfill Scheme     1 MW
Energy Type: Landfill Gas
County: Merseyside     Country: England     LPA: St Helens Council
Site ID and Reference: 573 / 07012L4     District:
Applicant: Bidston Methane     Application : (Go to search to find Application)
Site Address: Billinge Hill Quarry Landfill Rainford Road Billinge St Helens Merseyside
 
County: Merseyside Region: North West
OS Coordinates: 352500 / 352500
Development Status: Operational
Application Submitted: 6/4/1996 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 4/3/1998 This Record Last Updated: 10/30/2011
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Billinge Hill Quarry: Waste :

Site Name: BILLINGE HILL QUARRY LANDFILL
Generator Type: Landfill gas (RO code = RJ)
Scheme : RO Generator ID: R00046RJEN
Capacity: 1025 Status: Live
Accreditation Date: 6/4/1996    
Commission Date: 4/1/1998    
Applicant: Bidstone Methane
Applicant Address: 1030 Centre Park Slutchers Lane Warrington WA1 1QL England
Address: Billinge Hill Quarry Landfill NFFO 4 Rainford RoadBillingeSt HelensMerseyside England

Site Name: BILLINGE HILL QUARRY LANDFILL
Generator Type: Landfill Gas (REGO code = LG)
Scheme : REGO Generator ID: G00051LGEN
Capacity: 1025 Status: Live
Accreditation Date: 6/4/1996    
Commission Date: 4/1/1998    
Applicant: Bidstone Methane
Applicant Address: 1030 Centre Park Slutchers Lane Warrington WA1 1QL England
Address: Billinge Hill Quarry Landfill NFFO 4 Rainford RoadBillingeSt HelensMerseyside England
 
Sorry I found no matches, Please try again.
Assumptions: Capacity: 1025kW 1.025 MW,
Thus over the month Capacity * 720 hours per month = 738 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School