Sorry I found no matches, Please try again. 176
vid = 166pws_id = 351731pws_id = 351731 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.224.63.123 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Forss Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Forss Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Highland    
Type of installation: Wind    on/offshore: on
Turbines :6  Capacity : 7.2 MW
Approx Date of 1st power generation: May 2007

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The existing turbines at the site were developed, built, and are owned and operated, by RES. The current 7.2 MW wind farm can provide enough clean green, renewable energy equivalent to the annual average consumption of over 3,700 homes in the Highland region. The additional turbines will provide the equivalent to the annual consumption of 3,000-5,000 homes*.


Abbey are putting together proposals to develop their former US Navy communications site at Forss, Caithness to promote the creation of an Energy and Data Park in an ambitious bid to consolidate the area's potential to be a national leader in the development of wind, wave and tidal renewable energy, and address the growing 21st century demand for secure data storage facilities.

 Turbine Make and Specs

Model: aa 2mw turbine Start Speed: 5
Capacity: 2 Optimal Speed: 15
Rotor Diameter: 80 Stop Speed: 25
Hub Height 47   Avg for all turbines:47 Avg. Elevation: 30
Web Page:
Comment: For proposed projects where turbine yet to be agreed

 Address

Forss, Thurso, Caithness

 Associated Companies.

Relationship Company (For: Forss )
DeveloperAbbey Renewables
OperatorRES Renewable Energy Systems Ltd
DeveloperRES Renewable Energy Systems Ltd

 DECC Data on this Project: Forss :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Hill of Lybster (Wind Turbine - Extension)     1.5 MW
Energy Type: Wind Onshore
County: Highland     Country: Scotland     LPA: Highland Council
Site ID and Reference: 5187 /     District:
Applicant: The Energy Workshop     Application : 17/04934/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 1.5
Height of Turbines: 100 Calculated capacity: 1.5
Site Address: Land 200M N Of, 3 Lybster Road, Forss, Thurso, Highlands
  KW14 7YA
County: Highland Region: Scotland
OS Coordinates: 302481 / 302481
Development Status: Operational
Application Submitted: 10/20/2017 Planning Permission Granted
Application Determined: Permission refused: 8/16/2018
Construction Date:    
Generator Live 4/12/2021 This Record Last Updated: 10/2/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 8/16/2018

Site Name: Forss Extension (Forss III)     6.5 MW
Energy Type: Wind Onshore
County: Highland     Country: Scotland     LPA: Highland Council
Site ID and Reference: 3783 / AA168     District:
Applicant: Renewable Energy Systems (RES)     Application : 10/04434/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 5 Turbine Capacity: 1.3
Height of Turbines: Calculated capacity: 6.5
Site Address: Thurso, Caithness
 
County: Highland Region: Scotland
OS Coordinates: 302174 / 302174
Development Status: Appeal Refused
Application Submitted: 10/28/2010 Planning Permission Granted
Application Determined: Permission refused: 10/19/2011
Construction Date:    
Generator Live This Record Last Updated: 1/2/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused: 7/19/2012
Granted: Appeal Granted: 10/19/2011

Site Name: Forss Wind Farm (Extension)     5.2 MW
Energy Type: Wind Onshore
County: Highland     Country: Scotland     LPA: Highland Council
Site ID and Reference: 4679 / N00065W     District:
Applicant: Renewable Energy Systems (RES)     Application : 01/00380/FULCA (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 1.3
Height of Turbines: Calculated capacity: 5.2
Site Address: Ex Navy Base Forss, Dounreay Thurso Caithness
  KW14 7YB
County: Highland Region: Scotland
OS Coordinates: 302000 / 302000
Development Status: Operational
Application Submitted: 1/5/2005 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 1/1/2007    
Generator Live 7/1/2007 This Record Last Updated: 5/10/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Forss Wind Farm     2.6 MW
Energy Type: Wind Onshore
County: Highland     Country: Scotland     LPA: Highland Council
Site ID and Reference: 6636 /     District:
Applicant: Renewable Energy Systems (RES)     Application : 01/00030/FULCA (Go to search to find Application)
For Wind Farms  
Number of Turbines: 2 Turbine Capacity: 1.3
Height of Turbines: 99 Calculated capacity: 2.6
Site Address: Wind Turbine Ex Navy Base Forss Dounreay Thurso Caithness
  KW14 7YB
County: Highland Region: Scotland
OS Coordinates: 302000 / 302000
Development Status: Operational
Application Submitted: 1/12/2001 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 1/1/2003    
Generator Live 7/1/2003 This Record Last Updated: 6/4/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Hill of Lybster     4.9 MW
Energy Type: Wind Onshore
County: Highland     Country: Scotland     LPA: Highland Council
Site ID and Reference: 3309 / S0036W3     District:
Applicant: Fivestone Ltd (subsidiary of Abbey Produce)     Application : CA2001030 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 1.3
Height of Turbines: Calculated capacity: 5.2
Site Address: Forss Phase 2, Caithness
 
County: Highland Region: Scotland
OS Coordinates: 302000 / 302000
Development Status: Operational
Application Submitted: 4/28/2000 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 2/8/2003 This Record Last Updated: 6/9/2010
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Forss: Wind :

Site Name: Forss Wind Farm Phase 2
Generator Type: On-shore wind (ROS code = SQ)
Scheme : RO Generator ID: R00068SQSC
Capacity: 4999 Status: Live
Accreditation Date: 4/28/2000    
Commission Date: 5/1/2007    
Applicant: RES Ltd
Applicant Address: Beaufort Court Egg Farm Lane Kings Langley WD4 8LR England
Address: Forss Wind Farm Phase 2 Forss Wind FarmEx US Navy communications BaseF Scotland

Site Name: Forss Wind Farm Phase 2
Generator Type: Wind
Scheme : REGO Generator ID: G01127NWSC
Capacity: 4999 Status: Live
Accreditation Date: 4/28/2000    
Commission Date: 5/1/2007    
Applicant: RES Ltd
Applicant Address: Beaufort Court Egg Farm Lane Kings Langley WD4 8LR England
Address: Forss Wind Farm Phase 2 Forss Wind FarmEx US Navy communications BaseF Scotland
 
Assumptions: Capacity: 4999kW 4.999 MW,
Thus over the month Capacity * 720 hours per month = 3599.28 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 1710 34.21% Issued
01/02/2018 1531 30.63% Issued
01/01/2018 1863 37.27% Issued
01/12/2017 697 13.94% Issued
01/12/2017 1215 24.30% Issued
01/11/2017 2428 48.57% Issued
01/10/2017 1857 37.15% Issued
01/09/2017 1134 22.68% Issued
01/08/2017 967 19.34% Issued
01/07/2017 918 18.36% Issued
01/06/2017 1163 23.26% Issued
01/05/2017 1076 21.52% Issued
01/04/2017 2050 41.01% Issued
01/03/2017 1501 30.03% Redeemed
01/02/2017 1592 31.85% Redeemed
01/01/2017 1816 36.33% Redeemed
Dec-16 01816 1816 36.33% Issued
Nov-16 01672 1672 33.45% Issued
Oct-16 01265 1265 25.31% Issued
Sep-16 01187 1187 23.74% Issued
Aug-16 01127 1127 22.54% Issued
Jul-16 0817 817 16.34% Issued
Jun-16 0786 786 15.72% Issued
Jun-16 0786 786 15.72% Issued
May-16 0973 973 19.46% Issued
Apr-16 01580 1580 31.61% Issued
Mar-16 01237 1237 24.74% Redeemed
Feb-16 01834 1834 36.69% Redeemed
Jan-16 02048 1328 26.57% Redeemed
Dec-15 02163 2163 43.27% Redeemed
Nov-15 01877 1877 37.55% Redeemed
Oct-15 01328 1328 26.57% Redeemed
Sep-15 01060 1060 21.20% Redeemed
Aug-15 0725 725 14.50% Redeemed
Jul-15 808808 808 16.16% Redeemed
Jun-15 808808 808 16.16% Redeemed
May-15 12341235 1235 24.70% Redeemed
Apr-15 708703 707 14.14% Redeemed
Mar-15 939939 939 18.78% Redeemed
Feb-15 10761076 1076 21.52% Redeemed
Jan-15 11291129 1129 22.58% Redeemed
Dec-14 10411041 1041 20.82% Redeemed
Nov-14 14571457 1457 29.15% Redeemed
Oct-14 17001700 1700 34.01% Redeemed
Sep-14 851846 851 17.02% Redeemed
Aug-14 14941494 1494 29.89% Redeemed
Jul-14 777771 777 15.54% Redeemed
Jun-14 576570 575 11.50% Redeemed
May-14 751746 752 15.04% Redeemed
Apr-14 14491449 1449 28.99% Redeemed
Mar-14 19291929 1929 38.59% Redeemed
Feb-14 20052006 2006 40.13% Redeemed
Jan-14 16111611 1611 32.23% Redeemed
Dec-13 23432343 2342 46.85% Redeemed
Nov-13 21592159 2159 43.19% Redeemed
Oct-13 14351434 65 1.30% Revoked
Sep-13 13731374 1 0.02% Redeemed
Aug-13 945940 945 18.90% Redeemed
Jul-13 903897 903 18.06% Redeemed
Jun-13 515509 515 10.30% Redeemed
May-13 12621262 1262 25.25% Redeemed
Apr-13 14481448 1448 28.97% Redeemed
Mar-13 13951395 1395 27.91% Redeemed
Feb-13 13411340 1340 26.81% Redeemed
Jan-13 18051806 1806 36.13% Redeemed
Dec-12 19281928 1928 38.57% Redeemed
Nov-12 15721571 1571 31.43% Redeemed
Oct-12 14991499 1499 29.99% Redeemed
Sep-12 20302031 2031 40.63% Redeemed
Aug-12 680675 680 13.60% Redeemed
Jul-12 664660 664 13.28% Redeemed
Jun-12 994994 994 19.88% Redeemed
May-12 11771177 1177 23.54% Redeemed
Apr-12 11951195 1195 23.90% Redeemed
Mar-12 18141814 1814 36.29% Redeemed
Feb-12 20142014 2014 40.29% Redeemed
Jan-12 21742174 2174 43.49% Redeemed
Dec-11 21582158 2158 43.17% Redeemed
Nov-11 20782078 2078 41.57% Redeemed
Oct-11 20672067 2067 41.35% Redeemed
Sep-11 14161416 1416 28.33% Redeemed
Aug-11 11831183 1183 23.66% Redeemed
Jul-11 10121012 1012 20.24% Redeemed
Jun-11 731731 731 14.62% Redeemed
May-11 17731773 1773 35.47% Redeemed
Apr-11 13821382 1382 27.65% Redeemed
Mar-11 16461646 1646 32.93% Redeemed
Feb-11 19291929 1929 38.59% Redeemed
Jan-11 17661766 1766 35.33% Redeemed
Dec-10 14711471 1471 29.43% Redeemed
Nov-10 15101510 1510 30.21% Redeemed
Oct-10 20482048 2048 40.97% Redeemed

 Calculations


Capacity: 19.96
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 19.96 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 351731

Project Info
FORSS Energy Park

RES: FORSS Wind Fram Extension

Highland councillors refuse wind turbines at FORSS
Highland Council's planning review body has opposed a planned extension to a wind farm on a former Cold War base.

Wind farm 'would affect Wick airport'
The other farms are at FORSS, Causeymire, Boulfruich, Flexhill, Achairn, Baillie, Camster, Bettyhill, Strathy North, Strathy South, South Shebster, Hill of Lieurary, Burn of Whilk, Stroupster, Bower, Durran, Olgrinmore, Halsary and Wathegar.

©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School