Sorry I found no matches, Please try again. 176
vid = 1670pws_id = pws_id = Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 7 Seen ) ID:1 Ind:0 IP: 18.116.51.45 {832) YESU WSHW: 7/10
Loading
Page views this IP this session = 7 of 10 unsubscribed pages

Kirkheaton Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Kirkheaton Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, North East England    
Type of installation: Wind    on/offshore: on
Turbines :3  Capacity : 1.8 MW
Approx Date of 1st power generation: May 2000

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Kirkheaton wind farm is located close to the village of Kirkheaton in Northumberland. It has an installed capacity of 1.8 MW and started work in May 2000

 Turbine Make and Specs

Model: Nordex N43/600 Start Speed: 5
Capacity: 0.6 Optimal Speed: 15
Rotor Diameter: 43 Stop Speed: 25
Hub Height 45   Avg for all turbines:45 Avg. Elevation: 234
Web Page:
Comment:

 Address

West Farm, Kirkheaton, Northumberland, nr NE19 2DQ

 Associated Companies.

Relationship Company (For: Kirkheaton )
OwnerEDF Energy Renewables
OperatorEDF Energy Renewables

 DECC Data on this Project: Kirkheaton :2587

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Kirkheaton Wind Farm     1.8 MW
Energy Type: Wind Onshore
County: Northumberland     Country: England     LPA: Northumberland County Council
Site ID and Reference: 2587 / 06015W4     District:
Applicant: Border Wind Farms Ltd /AMEC     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 0.59999999999999998
Height of Turbines: Calculated capacity: 1.8
Site Address: West Farm, Kirkheaton, Northumberland
 
County: Northumberland Region: North East
OS Coordinates: 400800 / 400800
Development Status: Operational
Application Submitted: 11/4/1997 Planning Permission Granted
Application Determined: Permission refused: 1/21/1999
Construction Date:    
Generator Live 5/22/2000 This Record Last Updated: 6/10/2009
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 1/21/1999

 OFGEM Data on this Project: Kirkheaton: Wind : R00020RQEN

Site Name: KIRKHEATON WIND FARM
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00020RQEN
Capacity: 1750 Status: Live
Accreditation Date: 11/4/1997    
Commission Date: 5/1/2000    
Applicant: Kikheaton Wind Ltd
Applicant Address: Haugh Lane Industrial EstateHexhamNorthumberland NE46 3PU
Address: Kirkheaton Wind Farm West FarmKirkheatonNorthumberland Northumberland NE19 2DQ England

 Calculations


Capacity: 1.8
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/3/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 1.8 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio

Project Info
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School