Loading
Page views this IP this session = 1 of 10 unsubscribed pagesBlyth Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Blyth Wind Farm (Wind , Closed) Location in the UK : England, North East England Type of installation: Wind on/offshore: off Turbines :2 Capacity : 4 MW Approx Date of 1st power generation: June 2000
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Blyth offshore wind farm was opened in December 2000, and the plant has been producing enough clean and renewable electricity to power 3,000 average households ever since. The turbines were manufactured by Danish wind energy company Vestas, and installed by the marine division of AMEC Capital Projects and Seacore.
Model: |
Vestas V66
|
Start Speed: |
5
|
Capacity: |
2
|
Optimal Speed: |
15
|
Rotor Diameter: |
66
|
Stop Speed: |
25
|
Hub Height |
76 Avg for all turbines:
|
Avg. Elevation: |
|
Web Page: |
|
Comment: |
|
Blyth Offshore Wind Farm Blyth HarbourBlythNorthumberland England
Relationship |
Company (For:
Blyth
) |
Operator | E.on UK |
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Blyth Offshore Wind Test Site 41.5 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: DECC (S36)/Marine Management Organisation
|
Site ID and Reference: |
2523 / A0439
District:
|
Applicant: |
EDF Energy Renewables
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
5 |
Turbine Capacity: |
8.3000000000000007 |
Height of Turbines: |
|
Calculated capacity: |
41.5 |
Site Address: |
between 1.8km and 13.8km off the east coast of Blyth in Northumberland
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
440591 / 440591
|
Development Status: |
Operational
|
Application Submitted: |
3/1/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
10/22/2016
|
|
|
Generator Live |
10/22/2017
|
This Record Last Updated: |
7/4/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Blyth Offshore 4 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: DECC (S36)
|
Site ID and Reference: |
2486 / N00546W
District:
|
Applicant: |
Blyth Harbor Wind Ltd
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
4 |
Site Address: |
1km off Blyth Harbour
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
432608 / 432608
|
Development Status: |
Decommissioned
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
8/1/2000
|
|
|
Generator Live |
12/1/2000
|
This Record Last Updated: |
6/4/2019
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
BLYTH OFFSHORE WIND FARM
|
Generator Type: |
Off-shore wind (RO code = RP)
|
Scheme : |
RO
|
Generator ID: |
R00001RPEN
|
Capacity: |
1800
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
2/1/2001
|
|
|
Applicant: |
EON UK plc
|
Applicant Address: |
Powergen Renewables Ltd
Westwood Way
Westwood Business Park
Coventry
CV4 8LG
England
|
Address: |
Blyth Offshore Wind Farm
Blyth HarbourBlythNorthumberland
England
|
Site Name: |
BLYTH OFFSHORE WIND FARM
|
Generator Type: |
Off-shore wind (REGO code = FW)
|
Scheme : |
REGO
|
Generator ID: |
G00178FWEN
|
Capacity: |
1800
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
2/1/2001
|
|
|
Applicant: |
EON UK plc
|
Applicant Address: |
Powergen Renewables Ltd
Westwood Way
Westwood Business Park
Coventry
CV4 8LG
England
|
Address: |
Blyth Offshore Wind Farm
Blyth HarbourBlythNorthumberland
England
|
|
Assumptions: Capacity: 1800kW 1.8 MW, Thus over the month Capacity * 720 hours per month = 1296 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
Sep-13 | 178 | 175 | 177 | 9.83% | Redeemed | Aug-13 | 181 | 180 | 181 | 10.06% | Redeemed | Jul-13 | 111 | 109 | 111 | 6.17% | Redeemed | Jun-13 | 150 | 148 | 150 | 8.33% | Redeemed | May-13 | 377 | 377 | 377 | 20.94% | Redeemed | Apr-13 | 232 | 233 | 233 | 12.94% | Redeemed | Mar-13 | 548 | 547 | 547 | 30.39% | Redeemed | Feb-13 | 129 | 128 | 129 | 7.17% | Redeemed | Jan-13 | 190 | 189 | 190 | 10.56% | Redeemed | Dec-12 | 370 | 369 | 369 | 20.50% | Redeemed | Nov-12 | 301 | 301 | 301 | 16.72% | Redeemed | Oct-12 | 236 | 235 | 236 | 13.11% | Redeemed | Sep-12 | 378 | 378 | 378 | 21.00% | Redeemed | Aug-12 | 212 | 210 | 211 | 11.72% | Redeemed | Jul-12 | 210 | 209 | 210 | 11.67% | Redeemed | Jun-12 | 233 | 231 | 233 | 12.94% | Redeemed | May-12 | 249 | 248 | 250 | 13.89% | Redeemed | Apr-12 | 311 | 311 | 311 | 17.28% | Redeemed | Mar-12 | 263 | 263 | 263 | 14.61% | Redeemed | Feb-12 | 368 | 368 | 368 | 20.44% | Redeemed | Jan-12 | 394 | 394 | 394 | 21.89% | Redeemed | Dec-11 | 278 | 278 | 278 | 15.44% | Redeemed | Nov-11 | 312 | 312 | 312 | 17.33% | Redeemed | Oct-11 | 91 | 89 | 91 | 5.06% | Redeemed | Sep-11 | 193 | 193 | 193 | 10.72% | Redeemed | Aug-11 | 83 | 81 | 83 | 4.61% | Redeemed | Jul-11 | 129 | 128 | 130 | 7.22% | Redeemed | Jun-11 | 166 | 164 | 165 | 9.17% | Redeemed | May-11 | 283 | 283 | 283 | 15.72% | Redeemed | Apr-11 | 191 | 190 | 191 | 10.61% | Redeemed | Mar-11 | 204 | 202 | 204 | 11.33% | Redeemed | Feb-11 | 321 | 321 | 321 | 17.83% | Redeemed | Jan-11 | 302 | 302 | 302 | 16.78% | Redeemed | Dec-10 | 199 | 198 | 199 | 11.06% | Redeemed | Nov-10 | 388 | 388 | 388 | 21.56% | Redeemed | Oct-10 | 278 | 277 | 277 | 15.39% | Redeemed |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|