Loading
Page views this IP this session = 1 of 10 unsubscribed pagesCefn Croes Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Cefn Croes Wind Farm (Wind , Active) Location in the UK : Wales, North Wales, Merseyside & Cheshire Type of installation: Wind on/offshore: on Turbines :39 Capacity : 58.5 MW Approx Date of 1st power generation: June 2005
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Located on a hillside near Devils Bridge (Ceredigion), about 15km east of Aberystwyth, the project has 39 GE 1.5MW wind turbines generating 58.5MW in total.
Model: |
GE 1.5 - 77
|
Start Speed: |
4
|
Capacity: |
1.5
|
Optimal Speed: |
15
|
Rotor Diameter: |
77
|
Stop Speed: |
25
|
Hub Height |
65 Avg for all turbines:65
|
Avg. Elevation: |
512
|
Web Page: |
http://tinyurl.com/mj649ee |
Comment: |
GEs Class I 1.5-77 wind turbine. GE advanced its original Class I wind turbine, the 1.5-70.5, with increased rotor length, and controls technology resulting in a greater annual energy production.
|
Devils Bridge, Ceredigion, SY23 3LB
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Cefn Croes Wind Farm 58.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Dyfed Country: Wales LPA: DECC (S36)
|
Site ID and Reference: |
2563 / 04043W4
District:
|
Applicant: |
Renewable Development Company Ltd, KENTECH Ltd
Application :
AD00737
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
39 |
Turbine Capacity: |
1.5 |
Height of Turbines: |
|
Calculated capacity: |
58.5 |
Site Address: |
Canolbarth Forest, Devils Bridge Ceredigion
|
|
|
County: |
Dyfed Region: Wales
|
OS Coordinates: |
281000 / 281000
|
Development Status: |
Operational
|
Application Submitted: |
7/24/2000
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
1/25/2005
|
This Record Last Updated: |
4/22/2009
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
CEFN CROES
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00148RQWA
|
Capacity: |
43800
|
Status: |
Live
|
Accreditation Date: |
7/24/2000
|
|
|
Commission Date: |
1/25/2005
|
|
|
Applicant: |
Cambrian Wind Energy Ltd
|
Applicant Address: |
7-10 Beaumont Mews
London
W1G 6EB
England
|
Address: |
Cefn Croes - A, E
Devils Bridge
Aberystwyth
SY23 3LE
Wales
|
Capacity: 117 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/22/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|