Sorry I found no matches, Please try again. 176
vid = 1681pws_id = 371423pws_id = 371423
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.133.113.24 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Cefn Croes Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Cefn Croes Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, North Wales, Merseyside & Cheshire    
Type of installation: Wind    on/offshore: on
Turbines :39  Capacity : 58.5 MW
Approx Date of 1st power generation: June 2005

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Located on a hillside near Devils Bridge (Ceredigion), about 15km east of Aberystwyth, the project has 39 GE 1.5MW wind turbines generating 58.5MW in total.

 Turbine Make and Specs

Model: GE 1.5 - 77 Start Speed: 4
Capacity: 1.5 Optimal Speed: 15
Rotor Diameter: 77 Stop Speed: 25
Hub Height 65   Avg for all turbines:65 Avg. Elevation: 512
Web Page: http://tinyurl.com/mj649ee
Comment: GEs Class I 1.5-77 wind turbine. GE advanced its original Class I wind turbine, the 1.5-70.5, with increased rotor length, and controls technology resulting in a greater annual energy production.

 Address

Devils Bridge, Ceredigion, SY23 3LB

 Associated Companies.

Relationship Company (For: Cefn Croes )
DeveloperFalck Renewables SpA
DeveloperWest Coast Energy Ltd
OperatorWest Coast Energy Ltd
OwnerWest Coast Energy Ltd

 DECC Data on this Project: Cefn Croes :2563

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Cefn Croes Wind Farm     58.5 MW
Energy Type: Wind Onshore
County: Dyfed     Country: Wales     LPA: DECC (S36)
Site ID and Reference: 2563 / 04043W4     District:
Applicant: Renewable Development Company Ltd, KENTECH Ltd     Application : AD00737 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 39 Turbine Capacity: 1.5
Height of Turbines: Calculated capacity: 58.5
Site Address: Canolbarth Forest, Devils Bridge Ceredigion
 
County: Dyfed Region: Wales
OS Coordinates: 281000 / 281000
Development Status: Operational
Application Submitted: 7/24/2000 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 1/25/2005 This Record Last Updated: 4/22/2009
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Cefn Croes: Wind : R00148RQWA

Site Name: CEFN CROES
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00148RQWA
Capacity: 43800 Status: Live
Accreditation Date: 7/24/2000    
Commission Date: 1/25/2005    
Applicant: Cambrian Wind Energy Ltd
Applicant Address: 7-10 Beaumont Mews London W1G 6EB England
Address: Cefn Croes - A, E Devils Bridge Aberystwyth SY23 3LE Wales

 Calculations


Capacity: 117
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/22/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 117 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 371423

Project Info
Falck Renewables

Friends of the Earth

West Coast Energy: CEFN CROES

CEFN CROES wind farm
Geograph: CEFN CROES wind farm

CEFN CROES Windfarm
CEFN CROES windfarm stands on a mountain plateau above the Ystwyth Valley near Cwmystwyth.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School