Sorry I found no matches, Please try again. 176
vid = 1682pws_id = 322948pws_id = 322948
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.188.113.19 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Tarn Bank Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Tarn Bank Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, CA14 4JG    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 0.845 MW
Approx Date of 1st power generation: December 1999

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment


 Turbine Make and Specs

Model: Enercon E48 Start Speed: 5
Capacity: 0.8 Optimal Speed: 15
Rotor Diameter: 48 Stop Speed: 25
Hub Height 45   Avg for all turbines:0 Avg. Elevation: 96
Web Page: http://www.enercon.de/en-en/492.htm
Comment: Hub height: 50 m / 55 m / 60 m / 76 m Stated as being ideal machine for any site

 Address

East Town End Farm, Winscales, Near Workington, Cumbria, CA14 4JG

 Associated Companies.

Relationship Company (For: Tarn Bank )
ContractorRaymond Brown Renewables
ContractorRaymond Brown Renewables
ConsultantTNEI Services Ltd

 DECC Data on this Project: Tarn Bank :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Tarn Bank: Wind :

Site Name: East Town End
Generator Type: Wind
Scheme : REGO Generator ID: G02668NWEN
Capacity: 500 Status: Live
Accreditation Date:    
Commission Date: 12/18/2014    
Applicant: GVO WIND NO. 21 LIMITED
Applicant Address: Temporis Capital LLP Berger House 36-38 London W1J 5AE England
Address: East Town End Farm Winscales Workington CA14 4JG England
 
Assumptions: Capacity: 500kW 0.5 MW,
Thus over the month Capacity * 720 hours per month = 360 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
110 22.00% Issued
105 21.00% Issued
149 29.80% Redeemed
152 30.40% Redeemed
01/01/2017 113 22.60% Redeemed
01/12/2016 - 31/12/2016 00 173 34.60% Issued
01/11/2016 - 30/11/2016 00 93 18.60% Issued
01/10/2016 - 31/10/2016 00 79 15.80% Issued
Oct-16 00 79 15.80% Issued
Sep-16 00 154 30.80% Issued
01/09/2016 - 30/09/2016 00 154 30.80% Issued
Aug-16 00 118 23.60% Issued
Jul-16 00 118 23.60% Issued
Jul-16 00 118 23.60% Issued
Jun-16 00 64 12.80% Issued
May-16 00 133 26.60% Issued
Apr-16 00 99 19.80% Issued
Mar-16 00 109 21.80% Redeemed
Feb-16 00 149 29.80% Redeemed
Jan-16 00 171 34.20% Redeemed
Dec-15 00 251 50.20% Redeemed
Nov-15 00 201 40.20% Redeemed
Oct-15 00 83 16.60% Redeemed
Sep-15 00 57 11.40% Redeemed
Aug-15 00 104 20.80% Redeemed
Jul-15 1150 115 23.00% Redeemed
Jun-15 1180 118 23.60% Redeemed
May-15 1700 167 33.40% Redeemed
Apr-15 1020 102 20.40% Redeemed
Mar-15 1850 185 37.00% Redeemed
Feb-15 1330 133 26.60% Redeemed
Jan-15 2060 206 41.20% Redeemed
Dec-14 820 82 16.40% Redeemed
147 29.40% Issued
108 21.60% Issued
194 38.80% Issued
137 27.40% Issued
119 23.80% Issued
146 29.20% Issued
186 37.20% Issued
130 26.00% Issued
108 21.60% Issued
122 24.40% Issued

 Calculations


Capacity: 1.69
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 2/4/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 1.69 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 322948

Project Info
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School