Sorry I found no matches, Please try again. 176
vid = 1682pws_id = 322948pws_id = 322948
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.145.161.199 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Tarn Bank Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Tarn Bank Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, CA14 4JG    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 0.845 MW
Approx Date of 1st power generation: December 1999

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment


 Turbine Make and Specs

Model: Enercon E48 Start Speed: 5
Capacity: 0.8 Optimal Speed: 15
Rotor Diameter: 48 Stop Speed: 25
Hub Height 45   Avg for all turbines:0 Avg. Elevation: 96
Web Page: http://www.enercon.de/en-en/492.htm
Comment: Hub height: 50 m / 55 m / 60 m / 76 m Stated as being ideal machine for any site

 Address

East Town End Farm, Winscales, Near Workington, Cumbria, CA14 4JG

 Associated Companies.

Relationship Company (For: Tarn Bank )
ContractorRaymond Brown Renewables
ContractorRaymond Brown Renewables
ConsultantTNEI Services Ltd

 DECC Data on this Project: Tarn Bank :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Tarn Bank: Wind :

Site Name: East Town End
Generator Type: Wind
Scheme : REGO Generator ID: G02668NWEN
Capacity: 500 Status: Live
Accreditation Date:    
Commission Date: 12/18/2014    
Applicant: GVO WIND NO. 21 LIMITED
Applicant Address: Temporis Capital LLP Berger House 36-38 London W1J 5AE England
Address: East Town End Farm Winscales Workington CA14 4JG England
 
Assumptions: Capacity: 500kW 0.5 MW,
Thus over the month Capacity * 720 hours per month = 360 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
110 22.00% Issued
105 21.00% Issued
149 29.80% Redeemed
152 30.40% Redeemed
01/01/2017 113 22.60% Redeemed
01/12/2016 - 31/12/2016 00 173 34.60% Issued
01/11/2016 - 30/11/2016 00 93 18.60% Issued
01/10/2016 - 31/10/2016 00 79 15.80% Issued
Oct-16 00 79 15.80% Issued
Sep-16 00 154 30.80% Issued
01/09/2016 - 30/09/2016 00 154 30.80% Issued
Aug-16 00 118 23.60% Issued
Jul-16 00 118 23.60% Issued
Jul-16 00 118 23.60% Issued
Jun-16 00 64 12.80% Issued
May-16 00 133 26.60% Issued
Apr-16 00 99 19.80% Issued
Mar-16 00 109 21.80% Redeemed
Feb-16 00 149 29.80% Redeemed
Jan-16 00 171 34.20% Redeemed
Dec-15 00 251 50.20% Redeemed
Nov-15 00 201 40.20% Redeemed
Oct-15 00 83 16.60% Redeemed
Sep-15 00 57 11.40% Redeemed
Aug-15 00 104 20.80% Redeemed
Jul-15 1150 115 23.00% Redeemed
Jun-15 1180 118 23.60% Redeemed
May-15 1700 167 33.40% Redeemed
Apr-15 1020 102 20.40% Redeemed
Mar-15 1850 185 37.00% Redeemed
Feb-15 1330 133 26.60% Redeemed
Jan-15 2060 206 41.20% Redeemed
Dec-14 820 82 16.40% Redeemed
147 29.40% Issued
108 21.60% Issued
194 38.80% Issued
137 27.40% Issued
119 23.80% Issued
146 29.20% Issued
186 37.20% Issued
130 26.00% Issued
108 21.60% Issued
122 24.40% Issued

 Calculations


Capacity: 1.69
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/26/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 1.69 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 322948

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School