Loading
Page views this IP this session = 4 of 10 unsubscribed pagesForestmoor Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Forestmoor Wind Farm (Wind , Active) Location in the UK : England, South West England Type of installation: Wind on/offshore: on Turbines :3 Capacity : 3 MW Approx Date of 1st power generation: 2005 March
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Energie Kontor, the firm behind the £3.6m scheme, won a planning appeal to build the turbines after Torridge council rejected its application.
The turbines will produce enough power for a maximum of 2,000 homes.
Model: |
Vestas NM60
|
Start Speed: |
3
|
Capacity: |
1
|
Optimal Speed: |
16
|
Rotor Diameter: |
60
|
Stop Speed: |
20
|
Hub Height |
48 Avg for all turbines:48
|
Avg. Elevation: |
186
|
Web Page: |
http://en.wind-turbine-models.com/turbines/313-neg-micon-nm-60-1000 |
Comment: |
|
Forestmoor, Stowford Cross, Bradworthy adjacent to Stowford Cross - Soldon Cross road. EX22 7TP
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
MW
|
Energy Type: |
|
County: |
Country: LPA:
|
Site ID and Reference: |
/
District:
|
Applicant: |
Application :
|
(Go to search to find Application) |
Site Address: |
|
|
|
County: |
Region:
|
OS Coordinates: |
/
|
Development Status: |
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
FORESTMOOR WIND PROJECT
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00446NWEN
|
Capacity: |
1783
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
2/1/2005
|
|
|
Applicant: |
Energiekontor UK FM GMBH Co. WP FM KG (UK Branch)
|
Applicant Address: |
TBC
TBC
|
Address: |
Forestmoor Wind Project (25/2/5)
Stowford Cross
Soldon Cross Road
Bradworthy
EX22 7TP
England
|
|
Assumptions: Capacity: 1783kW 1.783 MW, Thus over the month Capacity * 720 hours per month = 1283.76 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 400 | 22.43% | Issued | 01/02/2018 | | | 424 | 23.78% | Issued | 01/01/2018 | | | 626 | 35.11% | Issued | 01/12/2017 | | | 424 | 23.78% | Issued | 01/11/2017 | | | 389 | 21.82% | Issued | 01/10/2017 | | | 435 | 24.40% | Issued | 01/09/2017 | | | 336 | 18.84% | Issued | 01/08/2017 | | | 246 | 13.80% | Issued | 01/07/2017 | | | 245 | 13.74% | Issued | 01/06/2017 | | | 336 | 18.84% | Issued | 01/05/2017 | | | 249 | 13.97% | Issued | 01/04/2017 | | | 159 | 8.92% | Issued | 01/03/2017 | | | 512 | 28.72% | Issued | 01/02/2017 | | | 471 | 26.42% | Issued | 01/01/2017 | | | 351 | 19.69% | Issued | Dec-16 | 0 | 295 | 295 | 16.55% | Issued | Nov-16 | 0 | 335 | 335 | 18.79% | Issued | Oct-16 | 0 | 255 | 255 | 14.30% | Issued | Sep-16 | 0 | 294 | 294 | 16.49% | Issued | Aug-16 | 0 | 290 | 290 | 16.26% | Issued | Jul-16 | 0 | 242 | 242 | 13.57% | Issued | Jun-16 | 0 | 197 | 198 | 11.10% | Issued | Jun-16 | 0 | 197 | 198 | 11.10% | Issued | May-16 | 0 | 0 | 214 | 12.00% | Issued | Apr-16 | 0 | 313 | 313 | 17.55% | Issued | Mar-16 | 0 | 419 | 419 | 23.50% | Redeemed | Feb-16 | 0 | 520 | 520 | 29.16% | Redeemed | Jan-16 | 0 | 603 | 603 | 33.82% | Redeemed | Dec-15 | 0 | 826 | 826 | 46.33% | Redeemed | Nov-15 | 0 | 686 | 686 | 38.47% | Redeemed | Oct-15 | 0 | 214 | 214 | 12.00% | Redeemed | Sep-15 | 0 | 232 | 232 | 13.01% | Redeemed | Aug-15 | 0 | 238 | 238 | 13.35% | Redeemed | Jul-15 | 350 | 350 | 350 | 19.63% | Redeemed | Jun-15 | 271 | 271 | 271 | 15.20% | Redeemed | May-15 | 401 | 401 | 401 | 22.49% | Redeemed | Apr-15 | 285 | 285 | 285 | 15.98% | Redeemed | Mar-15 | 426 | 426 | 426 | 23.89% | Redeemed | Feb-15 | 352 | 352 | 352 | 19.74% | Redeemed | Jan-15 | 633 | 633 | 633 | 35.50% | Redeemed | Dec-14 | 574 | 574 | 574 | 32.19% | Redeemed | Nov-14 | 328 | 328 | 328 | 18.40% | Redeemed | Oct-14 | 412 | 412 | 412 | 23.11% | Redeemed | Sep-14 | 119 | 118 | 120 | 6.73% | Redeemed | Aug-14 | 287 | 287 | 287 | 16.10% | Redeemed | Jul-14 | 156 | 155 | 156 | 8.75% | Redeemed | Jun-14 | 145 | 143 | 145 | 8.13% | Redeemed | May-14 | 268 | 267 | 268 | 15.03% | Redeemed | Apr-14 | 223 | 224 | 224 | 12.56% | Redeemed | Mar-14 | 345 | 345 | 345 | 19.35% | Redeemed | Feb-14 | 693 | 693 | 693 | 38.87% | Redeemed | Jan-14 | 541 | 541 | 541 | 30.34% | Redeemed | Dec-13 | 446 | 446 | 446 | 25.01% | Redeemed | Nov-13 | 196 | 195 | 196 | 10.99% | Redeemed | Oct-13 | 410 | 410 | 1 | 0.06% | Redeemed | Sep-13 | 244 | 243 | 244 | 13.68% | Redeemed | Aug-13 | 196 | 194 | 196 | 10.99% | Redeemed | Jul-13 | 178 | 177 | 179 | 10.04% | Redeemed | Jun-13 | 339 | 339 | 339 | 19.01% | Redeemed | May-13 | 402 | 401 | 401 | 22.49% | Redeemed | Apr-13 | 430 | 431 | 431 | 24.17% | Redeemed | Mar-13 | 421 | 421 | 421 | 23.61% | Redeemed | Feb-13 | 386 | 386 | 386 | 21.65% | Redeemed | Jan-13 | 429 | 429 | 429 | 24.06% | Redeemed | Dec-12 | 585 | 585 | 585 | 32.81% | Redeemed | Nov-12 | 338 | 338 | 338 | 18.96% | Redeemed | Oct-12 | 347 | 347 | 347 | 19.46% | Redeemed | Sep-12 | 294 | 294 | 294 | 16.49% | Redeemed | Aug-12 | 298 | 299 | 299 | 16.77% | Redeemed | Jul-12 | 249 | 249 | 249 | 13.97% | Redeemed | Jun-12 | 405 | 404 | 404 | 22.66% | Redeemed | May-12 | 208 | 208 | 208 | 11.67% | Redeemed | Apr-12 | 385 | 385 | 385 | 21.59% | Redeemed | Mar-12 | 231 | 231 | 231 | 12.96% | Redeemed | Feb-12 | 252 | 252 | 252 | 14.13% | Redeemed | Jan-12 | 562 | 561 | 561 | 31.46% | Redeemed | Dec-11 | 740 | 740 | 740 | 41.50% | Redeemed | Nov-11 | 404 | 404 | 404 | 22.66% | Redeemed | Oct-11 | 442 | 442 | 442 | 24.79% | Redeemed | Sep-11 | 452 | 452 | 452 | 25.35% | Redeemed | Aug-11 | 189 | 190 | 190 | 10.66% | Redeemed | Jul-11 | 203 | 203 | 203 | 11.39% | Redeemed | Jun-11 | 302 | 302 | 302 | 16.94% | Redeemed | May-11 | 474 | 474 | 474 | 26.58% | Redeemed | Apr-11 | 216 | 217 | 217 | 12.17% | Redeemed | Mar-11 | 219 | 219 | 219 | 12.28% | Redeemed | Feb-11 | 428 | 428 | 428 | 24.00% | Redeemed | Jan-11 | 383 | 383 | 383 | 21.48% | Redeemed | Dec-10 | 277 | 276 | 276 | 15.48% | Redeemed | Nov-10 | 391 | 391 | 391 | 21.93% | Redeemed | Oct-10 | 286 | 286 | 286 | 16.04% | Redeemed |
|
Capacity: 6 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 20 m/s (44.74 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|