Sorry I found no matches, Please try again. 176
vid = 1691pws_id = 310080pws_id = 310080 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.118.140.78 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Albion Square Solar Farm

Albion Square Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, Woking    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 0.073 MW
Approx Date of 1st power generation: April 2007

/YES

 Comment

Albion Square Glass Canopy,Woking 272 Triple Glass sandwich solar panels with high efficiency cells.
The structure consists of three 20-metre high tubular steel masts and 11 six-metre high secondary columns. The masts support a glass canopy from steel suspension cables. The glazed roof includes over 35,000 photovoltaic cells, laminated in 272 glass panels, having a peak electrical output of 81 KWp.

 Address

Albion Square Church PathAlbion SquareHigh StreetWokingS GU21 6EJ England

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Albion Square )

 DECC Data on this Project: Albion Square :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name:     MW
Energy Type:
County:     Country:     LPA:
Site ID and Reference: /     District:
Applicant:     Application : (Go to search to find Application)
Site Address:
 
County: Region:
OS Coordinates: /
Development Status:
Application Submitted: Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated:
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Albion Square: Solar :

Site Name: Albion Square - M (18/12/2007)
Generator Type: Photovoltaic (RO code = RU)
Scheme : RO Generator ID: R00009RUEN
Capacity: 81 Status: Live
Accreditation Date:    
Commission Date: 8/1/2007    
Applicant: Thameswey Energy Ltd.1
Applicant Address: 2nd Floor Gloucester Chambers Jubille Square Woking GU21 1ZP England
Address: Albion Square - M (18/12/2007) Church PathAlbion SquareHigh StreetWokingS GU21 6EJ England

Site Name: Albion Square - M (18/12/2007)
Generator Type: Photovoltaic
Scheme : REGO Generator ID: G01378PVEN
Capacity: 81 Status: Live
Accreditation Date:    
Commission Date: 8/1/2007    
Applicant: Thameswey Energy Ltd.1
Applicant Address: 2nd Floor Gloucester Chambers Jubille Square Woking GU21 1ZP England
Address: Albion Square - M (18/12/2007) Church PathAlbion SquareHigh StreetWokingS GU21 6EJ England
 
Assumptions: Capacity: 81kW 0.081 MW,
Thus over the month Capacity * 720 hours per month = 58.32 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/11/2017 1 1.23% Issued
01/10/2017 2 2.47% Issued
01/09/2017 3 3.70% Issued
01/08/2017 4 4.94% Issued
01/07/2017 5 6.17% Issued
01/06/2017 5 6.17% Issued
01/03/2017 1 1.23% Issued
01/02/2017 1 1.23% Issued
01/01/2017 1 1.23% Issued
Nov-16 02 1 1.23% Issued
Oct-16 03 2 2.47% Issued
Oct-16 00 2 2.47% Issued
Sep-16 05 2 2.47% Issued
Aug-16 08 4 4.94% Issued
Jul-16 09 5 6.17% Issued
Jul-16 09 5 6.17% Issued
Jun-16 08 4 4.94% Issued
May-16 09 5 6.17% Issued
Apr-16 08 4 4.94% Issued
Mar-16 05 3 3.70% Issued
Feb-16 03 2 2.47% Issued
Jan-16 02 1 1.23% Issued
Dec-15 01 1 1.23% Issued
Nov-15 01 1 1.23% Issued
Oct-15 04 2 2.47% Issued
Sep-15 07 3 3.70% Issued
Aug-15 08 4 4.94% Issued
Jul-15 510 5 6.17% Expired
Jun-15 611 6 7.41% Expired
May-15 510 5 6.17% Expired
Apr-15 59 5 6.17% Expired
Mar-15 26 3 3.70% Expired
Feb-15 22 1 1.23% Expired
Jan-15 02 1 1.23% Expired
Dec-14 11 1 1.23% Expired
Nov-14 12 1 1.23% Expired
Oct-14 24 2 2.47% Expired
Sep-14 36 3 3.70% Expired
Aug-14 59 4 4.94% Expired
Jul-14 512 6 7.41% Expired
Jun-14 612 6 7.41% Expired
May-14 510 5 6.17% Expired
Apr-14 48 4 4.94% Expired
Mar-14 37 3 3.70% Expired
Feb-14 23 2 2.47% Expired
Nov-13 12 1 1.23% Expired
Oct-13 24 2 2.47% Expired
Sep-13 36 3 3.70% Expired
Aug-13 611 5 6.17% Expired
Jul-13 714 7 8.64% Expired
Jun-13 512 6 7.41% Expired
May-13 611 5 6.17% Expired
Apr-13 49 5 6.17% Expired
Mar-13 34 2 2.47% Expired
Feb-13 13 1 1.23% Expired
Jan-13 13 1 1.23% Expired
Dec-12 11 1 1.23% Expired
Nov-12 13 1 1.23% Expired
Oct-12 34 2 2.47% Expired
Sep-12 49 5 6.17% Expired
Aug-12 11 1 1.23% Expired
Jul-12 49 5 6.17% Expired
Jun-12 49 4 4.94% Expired
Apr-12 510 5 6.17% Expired
Mar-12 49 4 4.94% Expired
Feb-12 24 2 2.47% Expired
Jan-12 12 1 1.23% Expired
Dec-11 12 1 1.23% Expired
Nov-11 23 1 1.23% Expired
Oct-11 37 3 3.70% Expired
Sep-11 49 4 4.94% Expired
Aug-11 612 6 7.41% Expired
Jul-11 1938 19 23.46% Expired
Jun-11 1123 11 13.58% Expired
May-11 917 9 11.11% Expired
Apr-11 611 5 6.17% Redeemed
Mar-11 37 3 3.70% Redeemed
Feb-11 13 1 1.23% Redeemed
Jan-11 12 1 1.23% Redeemed
Nov-10 13 1 1.23% Redeemed

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School