Sorry I found no matches, Please try again. 176
vid = 1762pws_id = 353700pws_id = 353700
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.135.202.168 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Butterwick Moor Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Butterwick Moor Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, County Durham , Sedgefield    
Type of installation: Wind    on/offshore: on
Turbines :10  Capacity : 21 MW
Approx Date of 1st power generation: consent 2007

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The Butterwick Moor site, which is being developed by E.ON, is immediately next door to the Walkway Wind Farm. By effectively ‘extending’ Walkway to include the Butterwick Moor development this will fulfil the original vision for wind energy development at this location.

NB. Turbine locations not accurate.

 Turbine Make and Specs

Model: Senvion MM82 Start Speed: 2.5
Capacity: 2 Optimal Speed: 6
Rotor Diameter: 82 Stop Speed: 12
Hub Height 69   Avg for all turbines:69 Avg. Elevation: 96
Web Page: http://www.repower.de/fileadmin/download/produkte/PP_MM82_uk.pdf
Comment: 0

 Address

Butterwick Moor Wind Farm Off Butterwick Road Sedgefield County Durham TS21 3ER England

 Associated Companies.

Relationship Company (For: Butterwick Moor )
OperatorE.on UK
OwnerE.on UK
DeveloperWind Prospect

 DECC Data on this Project: Butterwick Moor :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Butterwick Moor     20.5 MW
Energy Type: Wind Onshore
County: County Durham     Country: England     LPA: Durham County Council
Site ID and Reference: 3218 / N00253W     District:
Applicant: E.ON UK     Application : 7/2006/0796/DM (Go to search to find Application)
For Wind Farms  
Number of Turbines: 10 Turbine Capacity: 2.0499999999999998
Height of Turbines: Calculated capacity: 20.5
Site Address: Butterwick Moor , Sedgefield
 
County: County Durham Region: North East
OS Coordinates: 439000 / 439000
Development Status: Operational
Application Submitted: 1/2/2007 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 9/1/2010    
Generator Live 4/1/2011 This Record Last Updated: 8/8/2011
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Butterwick Moor: Wind :

Site Name: Butterwick Moor Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00250RQEN
Capacity: 18500 Status: Live
Accreditation Date: 1/2/2007    
Commission Date: 11/4/2010    
Applicant: EON UK plc
Applicant Address: Powergen Renewables Ltd Westwood Way Westwood Business Park Coventry CV4 8LG England
Address: Butterwick Moor Wind Farm Off Butterwick Road Sedgefield TS21 3ER England

Site Name: Butterwick Moor Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G01836NWEN
Capacity: 18500 Status: Live
Accreditation Date: 1/2/2007    
Commission Date: 11/4/2010    
Applicant: EON UK plc
Applicant Address: Powergen Renewables Ltd Westwood Way Westwood Business Park Coventry CV4 8LG England
Address: Butterwick Moor Wind Farm Off Butterwick Road Sedgefield TS21 3ER England
 
Assumptions: Capacity: 18500kW 18.5 MW,
Thus over the month Capacity * 720 hours per month = 13320 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 4820 26.05% Issued
01/02/2018 3732 20.17% Issued
01/01/2018 4637 25.06% Issued
01/12/2017 4735 25.59% Issued
01/11/2017 4471 24.17% Issued
01/10/2017 152 0.82% Revoked
01/10/2017 4893 26.45% Issued
01/09/2017 2630 14.22% Issued
01/08/2017 2832 15.31% Issued
01/07/2017 2252 12.17% Issued
01/06/2017 3435 18.57% Issued
01/05/2017 2309 12.48% Issued
01/04/2017 3233 17.48% Issued
01/03/2017 3195 17.27% Redeemed
01/02/2017 3709 20.05% Redeemed
01/01/2017 2845 15.38% Redeemed
Dec-16 03910 3910 21.14% Issued
Nov-16 03109 3109 16.81% Issued
Oct-16 02215 2215 11.97% Issued
Sep-16 03108 3108 16.80% Issued
Aug-16 02601 2601 14.06% Issued
Jul-16 02221 2221 12.01% Issued
Jun-16 01834 1834 9.91% Issued
Jun-16 01834 1834 9.91% Issued
May-16 03167 3167 17.12% Issued
Apr-16 03006 3006 16.25% Issued
Mar-16 03427 3427 18.52% Redeemed
Feb-16 04919 4919 26.59% Redeemed
Jan-16 05445 5445 29.43% Redeemed
Nov-15 05966 5966 32.25% Redeemed
Oct-15 02008 2008 10.85% Redeemed
Sep-15 01597 1606 8.68% Redeemed
Aug-15 02989 2989 16.16% Redeemed
Jul-15 23462346 2346 12.68% Redeemed
Jun-15 30133013 3013 16.29% Redeemed
May-15 43974397 4397 23.77% Redeemed
Apr-15 31853186 3186 17.22% Redeemed
Mar-15 56525652 5652 30.55% Redeemed
Feb-15 43334333 4333 23.42% Redeemed
Jan-15 63866385 6385 34.51% Redeemed
Dec-14 51865187 5187 28.04% Redeemed
Nov-14 25962596 2596 14.03% Redeemed
Oct-14 52255225 5225 28.24% Redeemed
Sep-14 10381027 1038 5.61% Redeemed
Aug-14 34083408 3408 18.42% Redeemed
Jul-14 15551545 1555 8.41% Redeemed
Jun-14 938927 939 5.08% Redeemed
May-14 23812381 2381 12.87% Redeemed
Apr-14 30743073 3073 16.61% Redeemed
Mar-14 47884788 4788 25.88% Redeemed
Feb-14 67996799 6799 36.75% Redeemed
Jan-14 46734673 4672 25.25% Redeemed
Dec-13 68336834 6834 36.94% Redeemed
Nov-13 39363936 3935 21.27% Redeemed
Oct-13 52105209 5209 28.16% Redeemed
Sep-13 27542755 2755 14.89% Redeemed
Aug-13 25002499 2499 13.51% Redeemed
Jul-13 13521342 1353 7.31% Redeemed
Jun-13 20392028 2039 11.02% Redeemed
May-13 45074507 4507 24.36% Redeemed
Apr-13 49824981 4981 26.92% Redeemed
Mar-13 46174618 4618 24.96% Redeemed
Feb-13 35493549 3549 19.18% Redeemed
Jan-13 43844384 4384 23.70% Redeemed
Dec-12 49774977 4977 26.90% Redeemed
Nov-12 45304530 4530 24.49% Redeemed
Oct-12 25892589 2589 13.99% Redeemed
Sep-12 42854286 4286 23.17% Redeemed
Aug-12 20682067 2067 11.17% Redeemed
Jul-12 22592260 2260 12.22% Redeemed
Jun-12 25032503 2503 13.53% Redeemed
May-12 26272627 2627 14.20% Redeemed
Apr-12 32563256 3256 17.60% Redeemed
Mar-12 26432643 2643 14.29% Redeemed
Feb-12 44874487 4487 24.25% Redeemed
Jan-12 57905790 5790 31.30% Redeemed
Dec-11 70577058 7058 38.15% Redeemed
Nov-11 36333632 3632 19.63% Redeemed
Oct-11 48684868 4868 26.31% Redeemed
Sep-11 38583858 3858 20.85% Redeemed
Aug-11 21632163 2163 11.69% Redeemed
Jul-11 14751465 1475 7.97% Redeemed
Jun-11 18241824 1824 9.86% Redeemed
May-11 47334732 4732 25.58% Redeemed
Apr-11 31433144 3144 16.99% Redeemed
Mar-11 21082095 2108 11.39% Redeemed
Feb-11 32093209 3209 17.35% Redeemed
Jan-11 37563757 3757 20.31% Redeemed
Dec-10 25562556 2556 13.82% Redeemed
Nov-10 740729 741 4.01% Redeemed

 Calculations


Capacity: 33.6
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 12 m/s (26.844 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 33.6 start: 5 Optimum: 15/ Stop: 12 / wind: / ratio 353700

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School