Loading
Page views this IP this session = 1 of 10 unsubscribed pagesButterwick Moor Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Butterwick Moor Wind Farm (Wind , Active) Location in the UK : England, County Durham , Sedgefield Type of installation: Wind on/offshore: on Turbines :10 Capacity : 21 MW Approx Date of 1st power generation: consent 2007
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The Butterwick Moor site, which is being developed by E.ON, is immediately next door to the Walkway Wind Farm. By effectively ‘extending’ Walkway to include the Butterwick Moor development this will fulfil the original vision for wind energy development at this location.
NB. Turbine locations not accurate.
Model: |
Senvion MM82
|
Start Speed: |
2.5
|
Capacity: |
2
|
Optimal Speed: |
6
|
Rotor Diameter: |
82
|
Stop Speed: |
12
|
Hub Height |
69 Avg for all turbines:69
|
Avg. Elevation: |
96
|
Web Page: |
http://www.repower.de/fileadmin/download/produkte/PP_MM82_uk.pdf |
Comment: |
0
|
Butterwick Moor Wind Farm Off Butterwick Road Sedgefield County Durham TS21 3ER England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Butterwick Moor 20.5 MW
|
Energy Type: |
Wind Onshore |
County: |
County Durham Country: England LPA: Durham County Council
|
Site ID and Reference: |
3218 / N00253W
District:
|
Applicant: |
E.ON UK
Application :
7/2006/0796/DM
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
10 |
Turbine Capacity: |
2.0499999999999998 |
Height of Turbines: |
|
Calculated capacity: |
20.5 |
Site Address: |
Butterwick Moor
, Sedgefield
|
|
|
County: |
County Durham Region: North East
|
OS Coordinates: |
439000 / 439000
|
Development Status: |
Operational
|
Application Submitted: |
1/2/2007
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
9/1/2010
|
|
|
Generator Live |
4/1/2011
|
This Record Last Updated: |
8/8/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Butterwick Moor Wind Farm
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00250RQEN
|
Capacity: |
18500
|
Status: |
Live
|
Accreditation Date: |
1/2/2007
|
|
|
Commission Date: |
11/4/2010
|
|
|
Applicant: |
EON UK plc
|
Applicant Address: |
Powergen Renewables Ltd
Westwood Way
Westwood Business Park
Coventry
CV4 8LG
England
|
Address: |
Butterwick Moor Wind Farm
Off Butterwick Road
Sedgefield
TS21 3ER
England
|
Site Name: |
Butterwick Moor Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01836NWEN
|
Capacity: |
18500
|
Status: |
Live
|
Accreditation Date: |
1/2/2007
|
|
|
Commission Date: |
11/4/2010
|
|
|
Applicant: |
EON UK plc
|
Applicant Address: |
Powergen Renewables Ltd
Westwood Way
Westwood Business Park
Coventry
CV4 8LG
England
|
Address: |
Butterwick Moor Wind Farm
Off Butterwick Road
Sedgefield
TS21 3ER
England
|
|
Assumptions: Capacity: 18500kW 18.5 MW, Thus over the month Capacity * 720 hours per month = 13320 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 4820 | 26.05% | Issued | 01/02/2018 | | | 3732 | 20.17% | Issued | 01/01/2018 | | | 4637 | 25.06% | Issued | 01/12/2017 | | | 4735 | 25.59% | Issued | 01/11/2017 | | | 4471 | 24.17% | Issued | 01/10/2017 | | | 4893 | 26.45% | Issued | 01/10/2017 | | | 152 | 0.82% | Revoked | 01/09/2017 | | | 2630 | 14.22% | Issued | 01/08/2017 | | | 2832 | 15.31% | Issued | 01/07/2017 | | | 2252 | 12.17% | Issued | 01/06/2017 | | | 3435 | 18.57% | Issued | 01/05/2017 | | | 2309 | 12.48% | Issued | 01/04/2017 | | | 3233 | 17.48% | Issued | 01/03/2017 | | | 3195 | 17.27% | Redeemed | 01/02/2017 | | | 3709 | 20.05% | Redeemed | 01/01/2017 | | | 2845 | 15.38% | Redeemed | Dec-16 | 0 | 3910 | 3910 | 21.14% | Issued | Nov-16 | 0 | 3109 | 3109 | 16.81% | Issued | Oct-16 | 0 | 2215 | 2215 | 11.97% | Issued | Sep-16 | 0 | 3108 | 3108 | 16.80% | Issued | Aug-16 | 0 | 2601 | 2601 | 14.06% | Issued | Jul-16 | 0 | 2221 | 2221 | 12.01% | Issued | Jun-16 | 0 | 1834 | 1834 | 9.91% | Issued | Jun-16 | 0 | 1834 | 1834 | 9.91% | Issued | May-16 | 0 | 3167 | 3167 | 17.12% | Issued | Apr-16 | 0 | 3006 | 3006 | 16.25% | Issued | Mar-16 | 0 | 3427 | 3427 | 18.52% | Redeemed | Feb-16 | 0 | 4919 | 4919 | 26.59% | Redeemed | Jan-16 | 0 | 5445 | 5445 | 29.43% | Redeemed | Nov-15 | 0 | 5966 | 5966 | 32.25% | Redeemed | Oct-15 | 0 | 2008 | 2008 | 10.85% | Redeemed | Sep-15 | 0 | 1597 | 1606 | 8.68% | Redeemed | Aug-15 | 0 | 2989 | 2989 | 16.16% | Redeemed | Jul-15 | 2346 | 2346 | 2346 | 12.68% | Redeemed | Jun-15 | 3013 | 3013 | 3013 | 16.29% | Redeemed | May-15 | 4397 | 4397 | 4397 | 23.77% | Redeemed | Apr-15 | 3185 | 3186 | 3186 | 17.22% | Redeemed | Mar-15 | 5652 | 5652 | 5652 | 30.55% | Redeemed | Feb-15 | 4333 | 4333 | 4333 | 23.42% | Redeemed | Jan-15 | 6386 | 6385 | 6385 | 34.51% | Redeemed | Dec-14 | 5186 | 5187 | 5187 | 28.04% | Redeemed | Nov-14 | 2596 | 2596 | 2596 | 14.03% | Redeemed | Oct-14 | 5225 | 5225 | 5225 | 28.24% | Redeemed | Sep-14 | 1038 | 1027 | 1038 | 5.61% | Redeemed | Aug-14 | 3408 | 3408 | 3408 | 18.42% | Redeemed | Jul-14 | 1555 | 1545 | 1555 | 8.41% | Redeemed | Jun-14 | 938 | 927 | 939 | 5.08% | Redeemed | May-14 | 2381 | 2381 | 2381 | 12.87% | Redeemed | Apr-14 | 3074 | 3073 | 3073 | 16.61% | Redeemed | Mar-14 | 4788 | 4788 | 4788 | 25.88% | Redeemed | Feb-14 | 6799 | 6799 | 6799 | 36.75% | Redeemed | Jan-14 | 4673 | 4673 | 4672 | 25.25% | Redeemed | Dec-13 | 6833 | 6834 | 6834 | 36.94% | Redeemed | Nov-13 | 3936 | 3936 | 3935 | 21.27% | Redeemed | Oct-13 | 5210 | 5209 | 5209 | 28.16% | Redeemed | Sep-13 | 2754 | 2755 | 2755 | 14.89% | Redeemed | Aug-13 | 2500 | 2499 | 2499 | 13.51% | Redeemed | Jul-13 | 1352 | 1342 | 1353 | 7.31% | Redeemed | Jun-13 | 2039 | 2028 | 2039 | 11.02% | Redeemed | May-13 | 4507 | 4507 | 4507 | 24.36% | Redeemed | Apr-13 | 4982 | 4981 | 4981 | 26.92% | Redeemed | Mar-13 | 4617 | 4618 | 4618 | 24.96% | Redeemed | Feb-13 | 3549 | 3549 | 3549 | 19.18% | Redeemed | Jan-13 | 4384 | 4384 | 4384 | 23.70% | Redeemed | Dec-12 | 4977 | 4977 | 4977 | 26.90% | Redeemed | Nov-12 | 4530 | 4530 | 4530 | 24.49% | Redeemed | Oct-12 | 2589 | 2589 | 2589 | 13.99% | Redeemed | Sep-12 | 4285 | 4286 | 4286 | 23.17% | Redeemed | Aug-12 | 2068 | 2067 | 2067 | 11.17% | Redeemed | Jul-12 | 2259 | 2260 | 2260 | 12.22% | Redeemed | Jun-12 | 2503 | 2503 | 2503 | 13.53% | Redeemed | May-12 | 2627 | 2627 | 2627 | 14.20% | Redeemed | Apr-12 | 3256 | 3256 | 3256 | 17.60% | Redeemed | Mar-12 | 2643 | 2643 | 2643 | 14.29% | Redeemed | Feb-12 | 4487 | 4487 | 4487 | 24.25% | Redeemed | Jan-12 | 5790 | 5790 | 5790 | 31.30% | Redeemed | Dec-11 | 7057 | 7058 | 7058 | 38.15% | Redeemed | Nov-11 | 3633 | 3632 | 3632 | 19.63% | Redeemed | Oct-11 | 4868 | 4868 | 4868 | 26.31% | Redeemed | Sep-11 | 3858 | 3858 | 3858 | 20.85% | Redeemed | Aug-11 | 2163 | 2163 | 2163 | 11.69% | Redeemed | Jul-11 | 1475 | 1465 | 1475 | 7.97% | Redeemed | Jun-11 | 1824 | 1824 | 1824 | 9.86% | Redeemed | May-11 | 4733 | 4732 | 4732 | 25.58% | Redeemed | Apr-11 | 3143 | 3144 | 3144 | 16.99% | Redeemed | Mar-11 | 2108 | 2095 | 2108 | 11.39% | Redeemed | Feb-11 | 3209 | 3209 | 3209 | 17.35% | Redeemed | Jan-11 | 3756 | 3757 | 3757 | 20.31% | Redeemed | Dec-10 | 2556 | 2556 | 2556 | 13.82% | Redeemed | Nov-10 | 740 | 729 | 741 | 4.01% | Redeemed |
|
Capacity: 33.6 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 12 m/s (26.844 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/29/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|