Sorry I found no matches, Please try again. 176
vid = 1820pws_id = 371690pws_id = 371690
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.135.192.229 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Carcant Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Carcant Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Heriot, Scottish Borders    
Type of installation: Wind    on/offshore: on
Turbines :3  Capacity : 6 MW
Approx Date of 1st power generation: June 2010

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Scottish & Southern Energy is planning to erect the UKs first Chinese-manufactured turbines at the utility’s sanctioned Carcant wind project in the Scottish Borders.

Turbines restricted to 2MW

 Turbine Make and Specs

Model: Siemens SWT 2.3 Start Speed: 4.5
Capacity: 2.3 Optimal Speed: 25
Rotor Diameter: 101 Stop Speed: 25
Hub Height 65   Avg for all turbines:80 Avg. Elevation: 361
Web Page: http://tinyurl.com/simens2-3
Comment:

 Address

Off B7007 Innerleithen Road Heriot EH38 5YE Scotland

 Associated Companies.

Relationship Company (For: Carcant )
DeveloperAirtricity
OperatorScottish and Southern Energy
OwnerScottish and Southern Energy

 DECC Data on this Project: Carcant :3214

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Carcant Windfarm     6 MW
Energy Type: Wind Onshore
County: Borders     Country: Scotland     LPA: Scottish Borders Council
Site ID and Reference: 3214 / N00245W     District:
Applicant: Greencoat UK Wind     Application : 05/01884/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 6
Site Address: Innerleithen
 
County: Borders Region: Scotland
OS Coordinates: 336250 / 336250
Development Status: Operational
Application Submitted: 10/10/2005 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 4/1/2010    
Generator Live 11/2/2010 This Record Last Updated: 1/5/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Carcant: Wind : -na-

 Calculations


Capacity: 13.2
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/3/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 13.2 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 371690

Project Info
Scottish and Southern - CARCANT Wind Farm

Greencoat UK Wind: Seed Portfolio
The Company has acquired 50% of Braes of Doune, 100% of Tappaghan, 100% of CARCANT and 100% of Bin Mountain from SSE and 41% of Little Cheyne Court and 24.95% of Rhyl Flats from RWE and a 24.95% interest in Rhyl Flats.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School