Carraig Gheal Wind Farm (Wind , Active) Location in the UK : Scotland, Argyll & Bute Type of installation: Wind on/offshore: on Turbines :20 Capacity : 46 MW Approx Date of 1st power generation: 2014
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Plans for a 20-turbine wind farm in Argyll and Bute have been approved by the Scottish Government.(bbc)
Turbine Hub Height: 9 turbines up to 65m, 11 turbines up to 80m
Turbine Diameter: 9 turbines up to 110m, 11 turbines up to 125m
Model: |
Siemens SWT 2.3
|
Start Speed: |
4.5
|
Capacity: |
2.3
|
Optimal Speed: |
25
|
Rotor Diameter: |
101
|
Stop Speed: |
25
|
Hub Height |
70 Avg for all turbines:69
|
Avg. Elevation: |
375
|
Web Page: |
http://tinyurl.com/simens2-3 |
Comment: |
|
Fernoch Farm Kilchrenan Taynuilt Oban PA35 1HG Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Carraig Gheal 46 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4619 / EN00031
District:
|
Applicant: |
Green Power
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
20 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
46 |
Site Address: |
Carraig Gheal, Argyll and Bute
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
196465 / 196465
|
Development Status: |
Operational
|
Application Submitted: |
11/15/2004
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
3/1/2011
|
|
|
Generator Live |
10/28/2013
|
This Record Last Updated: |
10/4/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
The Carraig Gheal Wind Farm
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00216SQSC
|
Capacity: |
45250
|
Status: |
Live
|
Accreditation Date: |
11/15/2004
|
|
|
Commission Date: |
2/1/2013
|
|
|
Applicant: |
GreenPower (Carraig Gheal) Limited
|
Applicant Address: |
The E Centre
ALLOA
FK10 3LP
Scotland
|
Address: |
Fernoch Farm
Kilchrenan
Taynuilt
Oban
PA35 1HG
Scotland
|
Site Name: |
The Carraig Gheal Wind Farm
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00216SQSC
|
Capacity: |
45250
|
Status: |
Live
|
Accreditation Date: |
11/15/2004
|
|
|
Commission Date: |
2/1/2013
|
|
|
Applicant: |
GreenPower (Carraig Gheal) Limited
|
Applicant Address: |
The E Centre
ALLOA
FK10 3LP
Scotland
|
Address: |
Fernoch Farm
Kilchrenan
Taynuilt
Oban
PA35 1HG
Scotland
|
Site Name: |
The Carraig Gheal Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01928NWSC
|
Capacity: |
45250
|
Status: |
Live
|
Accreditation Date: |
11/15/2004
|
|
|
Commission Date: |
2/1/2013
|
|
|
Applicant: |
GreenPower (Carraig Gheal) Limited
|
Applicant Address: |
The E Centre
ALLOA
FK10 3LP
Scotland
|
Address: |
Fernoch Farm
Kilchrenan
Taynuilt
Oban
PA35 1HG
Scotland
|
|
Assumptions: Capacity: 45250kW 45.25 MW, Thus over the month Capacity * 720 hours per month = 32580 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 12162 | 26.88% | Issued | 01/03/2018 | | | 14805 | 32.72% | Issued | 01/02/2018 | | | 11450 | 25.30% | Issued | 01/01/2018 | | | 14790 | 32.69% | Issued | 01/12/2017 | | | 12193 | 26.95% | Retired | 01/11/2017 | | | 11517 | 25.45% | Retired | 01/10/2017 | | | 16065 | 35.50% | Retired | 01/09/2017 | | | 9871 | 21.81% | Retired | 01/08/2017 | | | 7381 | 16.31% | Retired | 01/07/2017 | | | 8348 | 18.45% | Retired | 01/06/2017 | | | 9604 | 21.22% | Retired | 01/05/2017 | | | 6783 | 14.99% | Issued | 01/04/2017 | | | 12060 | 26.65% | Issued | 01/03/2017 | | | 11171 | 24.69% | Issued | 01/02/2017 | | | 14315 | 31.64% | Issued | 01/01/2017 | | | 12243 | 27.06% | Issued | Dec-16 | 0 | 15449 | 15449 | 34.14% | Pending Tr | Nov-16 | 0 | 7727 | 7727 | 17.08% | Pending Tr | Oct-16 | 0 | 9318 | 9318 | 20.59% | Pending Tr | Sep-16 | 0 | 10906 | 10906 | 24.10% | Pending Tr | Aug-16 | 0 | 9152 | 9152 | 20.23% | Pending Tr | Jul-16 | 0 | 7120 | 7120 | 15.73% | Pending Tr | Jul-16 | 0 | 7120 | 7120 | 15.73% | Pending Tr | Jun-16 | 0 | 4488 | 4488 | 9.92% | Pending Tr | May-16 | 0 | 8841 | 8841 | 19.54% | Pending Tr | Apr-16 | 0 | 9798 | 9798 | 21.65% | Pending Tr | Mar-16 | 0 | 6978 | 6978 | 15.42% | Redeemed | Feb-16 | 0 | 12298 | 12298 | 27.18% | Redeemed | Jan-16 | 0 | 14179 | 14179 | 31.33% | Redeemed | Dec-15 | 0 | 19405 | 19405 | 42.88% | Redeemed | Nov-15 | 0 | 15654 | 15654 | 34.59% | Redeemed | Oct-15 | 0 | 8570 | 8570 | 18.94% | Redeemed | Sep-15 | 0 | 7625 | 7625 | 16.85% | Redeemed | Aug-15 | 0 | 8395 | 8395 | 18.55% | Redeemed | Jul-15 | 8831 | 8830 | 8830 | 19.51% | Redeemed | Jun-15 | 5459 | 5460 | 5460 | 12.07% | Redeemed | May-15 | 8465 | 8465 | 6093 | 13.47% | Redeemed | Apr-15 | 7937 | 7944 | 7937 | 17.54% | Redeemed | Mar-15 | 15009 | 15016 | 7 | 0.02% | Expired | Feb-15 | 12359 | 12366 | 12366 | 27.33% | Redeemed | Jan-15 | 17562 | 17570 | 17570 | 38.83% | Redeemed | Dec-14 | 16325 | 16332 | 16332 | 36.09% | Redeemed | Nov-14 | 8371 | 8377 | 8377 | 18.51% | Redeemed | Oct-14 | 10692 | 10698 | 8937 | 19.75% | Redeemed | Sep-14 | 5112 | 5118 | 5118 | 11.31% | Redeemed | Aug-14 | 9567 | 9573 | 9573 | 21.16% | Redeemed | Jul-14 | 5673 | 5679 | 5679 | 12.55% | Redeemed | Jun-14 | 4253 | 4259 | 4259 | 9.41% | Redeemed | May-14 | 5492 | 5498 | 3135 | 6.93% | Redeemed | Apr-14 | 11677 | 11684 | 11684 | 25.82% | Redeemed | Mar-14 | 16363 | 16371 | 16371 | 36.18% | Expired | Feb-14 | 17230 | 17238 | 17238 | 38.10% | Redeemed | Jan-14 | 14061 | 14071 | 14071 | 31.10% | Redeemed | Dec-13 | 20526 | 20536 | 7964 | 17.60% | Redeemed | Nov-13 | 10136 | 10145 | 1 | 0.00% | Expired | Oct-13 | 11068 | 11075 | 2750 | 6.08% | Expired | Sep-13 | 7976 | 7976 | 7976 | 17.63% | Redeemed | Aug-13 | 7945 | 7951 | 7951 | 17.57% | Redeemed | Jul-13 | 3903 | 3909 | 3098 | 6.85% | Redeemed | Jun-13 | 4963 | 4970 | 3970 | 8.77% | Redeemed | May-13 | 8223 | 8230 | 6579 | 14.54% | Redeemed | Apr-13 | 6869 | 6877 | 5500 | 12.15% | Redeemed | Mar-13 | 1350 | 1353 | 271 | 0.60% | Expired |
|
Capacity: 91.9999999999999 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|