Sorry I found no matches, Please try again. 176
vid = 1826pws_id = 353525pws_id = 353525
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.143.7.112 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Sheerness Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Sheerness Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Sheerness, Sheppy, Kent    
Type of installation: Wind    on/offshore: on
Turbines :4  Capacity : 10 MW
Approx Date of 1st power generation: January 2016

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The proposed scheme will consist of four 2.5–3-MW turbines, each with a total maximum height of 125m. The wind farm is expected to produce enough power for 5500 homes, which equates to 13% of the wind energy target for the Kent region.
Planning permission was granted in March 2009. A number of technical studies have been undertaken and are ongoing. Procurement will commence during 2014 with construction planned in 2015.

 Turbine Make and Specs

Model: Gamesa G80 Start Speed: 6
Capacity: 2 Optimal Speed: 13
Rotor Diameter: 80 Stop Speed: 21
Hub Height 60   Avg for all turbines:60 Avg. Elevation: 4
Web Page: http://www.gamesacorp.com/recursos/doc/productos-servicios/aerogeneradores/catalogo-g9x-20-mw-eng.pdf
Comment:

 Address

Sheerness Wind FarmPort of Sheerness Isle of Sheppey Sheerness ME12 1RS England

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Sheerness )

 DECC Data on this Project: Sheerness :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Port of Sheerness Wind Farm (was Lappel Bank)     8.2 MW
Energy Type: Wind Onshore
County: Kent     Country: England     LPA: Swale Borough Council
Site ID and Reference: 3738 / A0446     District:
Applicant: Peel Energy     Application : SW/08/0896 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 2.0499999999999998
Height of Turbines: 125 Calculated capacity: 8.2
Site Address: Sheerness Docks, Sheerness, Kent
  ME12 1RS
County: Kent Region: South East
OS Coordinates: 591061 / 591061
Development Status: Operational
Application Submitted: 8/26/2008 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 8/6/2015    
Generator Live 9/20/2016 This Record Last Updated: 10/24/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Sheerness: Wind :

Site Name: Sheerness Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00356RQEN
Capacity: 8100 Status: Live
Accreditation Date: 8/26/2008    
Commission Date: 6/21/2016    
Applicant: Port of Sheerness Wind Farm Ltd
Applicant Address: Peel Dome The Trafford Centre Manchester M17 8PL England
Address: Sheerness Wind Farm Port of Sheerness Isle of Sheppey Sheerness ME12 1RS England

Site Name: Sheerness Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G02987NWEN
Capacity: 8100 Status: Live
Accreditation Date: 8/26/2008    
Commission Date: 6/21/2016    
Applicant: Port of Sheerness Wind Farm Ltd
Applicant Address: Peel Dome The Trafford Centre Manchester M17 8PL England
Address: Sheerness Wind Farm Port of Sheerness Isle of Sheppey Sheerness ME12 1RS England
 
Assumptions: Capacity: 8100kW 8.1 MW,
Thus over the month Capacity * 720 hours per month = 5832 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/05/2018 1040 12.84% Issued
01/04/2018 1931 23.84% Issued
01/03/2018 2339 28.88% Issued
01/02/2018 2884 35.60% Issued
01/01/2018 3346 41.31% Issued
01/12/2017 3160 39.01% Retired
01/11/2017 2548 31.46% Retired
01/10/2017 2844 35.11% Retired
01/09/2017 1769 21.84% Retired
01/08/2017 1607 19.84% Issued
01/07/2017 1823 22.51% Issued
01/06/2017 2142 26.44% Retired
01/05/2017 1682 20.77% Issued
01/04/2017 1400 17.28% Issued
01/03/2017 2993 36.95% Issued
01/02/2017 2578 31.83% Issued
01/01/2017 1931 23.84% Issued
Dec-16 01583 1759 21.72% Pending Tr
Nov-16 02394 2660 32.84% Pending Tr
Oct-16 01512 1680 20.74% Pending Tr
Sep-16 01307 1453 17.94% Issued
Aug-16 01129 1254 15.48% Pending Tr
Jul-16 0504 560 6.91% Pending Tr

 Calculations


Capacity: 35
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 21 m/s (46.977 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/27/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 35 start: 5 Optimum: 15/ Stop: 21 / wind: / ratio 353525

Project Info
Peel Energy, Port of SHEERNESS

Port of Sheernes Wind Farm

Wind farm plans to get green light?

Middlewick Wind Farm – Construction Update
The turbine blades were manufactured by Siemens in the USA; they were delivered by sea and offloaded at SHEERNESS, Kent.

Vestas wind turbine plant in Kent given approval
A plan to build wind turbines in Kent, with the creation of about 1,600 jobs, has been given approval. Vestas, which supplies 40% of the world's offshore turbines, wants to build a new site at SHEERNESS Dock on the Isle of Sheppey.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School