Shooters Bottom Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Shooters Bottom Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Somerset    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 2 MW
Approx Date of 1st power generation: June 2008

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

More than fifteen years after the UK got its first modern wind turbine, and four years after Ecotricity first applied to the local council to build one Somerset joined the energy revolution in June 2008.

 Turbine Make and Specs

Model: Wind Turbine- Generic Start Speed: 5
Capacity: 2 Optimal Speed: 15
Rotor Diameter: 100 Stop Speed: 25
Hub Height 0   Avg for all turbines:0 Avg. Elevation: 0
Web Page:
Comment:

 Address

Shooters Bottom Farm Townsend Lane Chewton Mendip BA3 4LU England

 Associated Companies.

Relationship Company (For: Shooters Bottom )
OwnerECOTRICITY Group Limited
DeveloperECOTRICITY Group Limited
OperatorECOTRICITY Group Limited

 DECC Data on this Project: Shooters Bottom :3161

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Shooters Bottom Wind Park     2 MW
Energy Type: Wind Onshore
County: Somerset     Country: England     LPA: Mendip District Council
Site ID and Reference: 3161 / N00129W     District:
Applicant: Ecotricity     Application : 116407-000 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 2
Site Address: Shooters Bottom, Chewton Mendip,
 
County: Somerset Region: South West
OS Coordinates: 359380 / 359380
Development Status: Operational
Application Submitted: 9/15/2003 Planning Permission Granted
Application Determined: Permission refused: 5/24/2005
Construction Date:    
Generator Live 6/16/2008 This Record Last Updated: 5/6/2009
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 5/24/2005

 OFGEM Data on this Project: Shooters Bottom: Wind : R00202RQEN

Site Name: Shooters Bottom Wind Park Ltd
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00202RQEN
Capacity: 2000 Status: Live
Accreditation Date: 9/15/2003    
Commission Date: 6/16/2008    
Applicant: Ecotricity Group Ltd
Applicant Address: Ecotricity Lion House Rowcroft Stroud GL5 3BY England
Address: Shooters Bottom Farm Townsend Lane Chewton Mendip BA3 4LU England

 Calculations


Capacity: 4
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/26/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 4 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 353258

Project Info
SHOOTERS BOTTOM Wind Farm

Energy firm Ecotricity has cancelled its plans to build a solar panel farm in So
The firm said the planned 26-acre farm (SHOOTERS BOTTOM) in Chewton Mendip would have generated enough power for 1,500 homes.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School