Sorry I found no matches, Please try again. 176
vid = 1835pws_id = 352926pws_id = 352926
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.119.132.80 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Port of Liverpool Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Port of Liverpool Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Liverpool, Merseyside    
Type of installation: Wind    on/offshore: on
Turbines :4  Capacity : 10 MW
Approx Date of 1st power generation: February 2009

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Located to the south of the turbines on Royal Seaforth Docks, Port of Liverpool Wind Farm became fully operational in February 2009. The turbines are located along Alexandra, Canada and Huskisson docks. The scheme comprises 4 x Nordex N90 2.5MW turbines with an installed capacity of 10MW. The turbines have a 90m rotor diameter and 80m towers, with a maximum blade tip height of 125m. The scheme will generate electricity equivalent to the needs of 5,500 homes.

 Turbine Make and Specs

Model: Nordex N90 Start Speed: 4
Capacity: 2.3 Optimal Speed: 12
Rotor Diameter: 90 Stop Speed: 25
Hub Height 80   Avg for all turbines:80 Avg. Elevation: 5
Web Page: http://www.nordex-online.com/en/produkte-service/wind-turbines/n90-25-mw.html
Comment: N90 suits inland locations

 Address

Port of Liverpool Bootle Liverpool L20 1BA England

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Port of Liverpool )

 DECC Data on this Project: Port of Liverpool :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Port of Liverpool - wind     10 MW
Energy Type: Wind Onshore
County: Merseyside     Country: England     LPA: Sefton Council
Site ID and Reference: 3533 / N00416W     District:
Applicant: Mersey Docks and Harbour Company     Application : 05F/2712 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 10
Site Address: Alexandra Dock, Port of Liverpool, Regent Road, Bootle
 
County: Merseyside Region: North West
OS Coordinates: 333356 / 333356
Development Status: Operational
Application Submitted: 8/17/2005 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 2/1/2009 This Record Last Updated: 6/9/2010
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Port of Liverpool: Wind :

Site Name: Port of Liverpool Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00213RQEN
Capacity: 9999 Status: Live
Accreditation Date: 8/17/2005    
Commission Date: 12/15/2008    
Applicant: Wind Port of Liverpool
Applicant Address: C/o WPO UK Services Ltd Victoria House 19-21 Ack Lane East Bramhall SK7 2BE England
Address: Port of Liverpool Bootle Liverpool L20 1BA England

Site Name: Port of Liverpool Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G01521NWEN
Capacity: 9999 Status: Live
Accreditation Date: 8/17/2005    
Commission Date: 12/15/2008    
Applicant: Wind Port of Liverpool
Applicant Address: C/o WPO UK Services Ltd Victoria House 19-21 Ack Lane East Bramhall SK7 2BE England
Address: Port of Liverpool Bootle Liverpool L20 1BA England
 
Assumptions: Capacity: 9999kW 9.999 MW,
Thus over the month Capacity * 720 hours per month = 7199.28 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 1702 17.02% Issued
01/03/2018 2171 21.71% Issued
01/02/2018 2103 21.03% Issued
01/01/2018 3400 34.00% Issued
01/12/2017 2853 28.53% Issued
01/11/2017 2709 27.09% Issued
01/10/2017 3130 31.30% Issued
01/09/2017 2174 21.74% Issued
01/08/2017 1616 16.16% Issued
01/07/2017 1451 14.51% Issued
01/06/2017 1890 18.90% Issued
01/05/2017 1228 12.28% Issued
01/04/2017 2395 23.95% Issued
01/03/2017 2191 21.91% Redeemed
01/02/2017 2446 24.46% Redeemed
01/01/2017 2590 25.90% Redeemed
Dec-16 02087 2087 20.87% Issued
Nov-16 01510 1510 15.10% Issued
Oct-16 01209 1209 12.09% Issued
Sep-16 01819 1819 18.19% Issued
Aug-16 02335 2335 23.35% Issued
Jul-16 01699 1699 16.99% Issued
Jul-16 01699 1699 16.99% Issued
Jun-16 0768 774 7.74% Issued
May-16 01349 1349 13.49% Issued
Apr-16 02199 2199 21.99% Issued
Mar-16 01454 1454 14.54% Redeemed
Feb-16 02174 2174 21.74% Redeemed
Jan-16 03398 3398 33.98% Redeemed
Dec-15 03731 3731 37.31% Redeemed
Nov-15 03307 3307 33.07% Redeemed
Oct-15 01402 1402 14.02% Redeemed
Sep-15 01542 1542 15.42% Redeemed
Aug-15 01379 1379 13.79% Redeemed
Jul-15 21862186 2186 21.86% Redeemed
Jun-15 16301631 1631 16.31% Redeemed
May-15 28162815 2815 28.15% Redeemed
Apr-15 14551456 1456 14.56% Redeemed
Mar-15 27372737 2737 27.37% Redeemed
Feb-15 20552055 2055 20.55% Redeemed
Jan-15 34203420 3420 34.20% Redeemed
Dec-14 33393339 3339 33.39% Redeemed
Nov-14 17211721 1721 17.21% Redeemed
Oct-14 23112311 2311 23.11% Redeemed
Sep-14 658652 658 6.58% Redeemed
Aug-14 27902790 2790 27.90% Redeemed
Jul-14 11751175 1175 11.75% Redeemed
Jun-14 728723 728 7.28% Redeemed
May-14 14671467 1467 14.67% Redeemed
Apr-14 17591762 1762 17.62% Redeemed
Mar-14 24412444 2444 24.44% Redeemed
Feb-14 31763176 3176 31.76% Redeemed
Jan-14 27222724 2723 27.23% Redeemed
Dec-13 35473548 3548 35.48% Redeemed
Nov-13 23712373 2373 23.73% Redeemed
Oct-13 26392640 2640 26.40% Redeemed
Sep-13 19691972 1972 19.72% Redeemed
Aug-13 17661769 1769 17.69% Redeemed
Jul-13 714714 720 7.20% Redeemed
Jun-13 17641767 1767 17.67% Redeemed
May-13 23632367 2367 23.67% Redeemed
Apr-13 23952396 2396 23.96% Redeemed
Mar-13 16481651 1651 16.51% Redeemed
Feb-13 19871989 1989 19.89% Redeemed
Jan-13 16361641 1641 16.41% Redeemed
Dec-12 27952797 2797 27.97% Redeemed
Nov-12 19051908 1908 19.08% Redeemed
Oct-12 16181621 1621 16.21% Redeemed
Sep-12 23452347 2347 23.47% Redeemed
Aug-12 13511356 1356 13.56% Redeemed
Jul-12 15801583 1583 15.83% Redeemed
Jun-12 20112015 2015 20.15% Redeemed
May-12 16711676 1676 16.76% Redeemed
Apr-12 21432145 2145 21.45% Redeemed
Mar-12 15631568 1568 15.68% Redeemed
Feb-12 20322036 2036 20.36% Redeemed
Jan-12 33823383 3383 33.83% Redeemed
Dec-11 45764576 4576 45.76% Redeemed
Nov-11 23342334 2334 23.34% Redeemed
Oct-11 30143014 3014 30.14% Redeemed
Sep-11 24772479 2479 24.79% Redeemed
Aug-11 18261830 1830 18.30% Redeemed
Jul-11 13691373 1373 13.73% Redeemed
Jun-11 16641667 1667 16.67% Redeemed
May-11 33563357 3357 33.57% Redeemed
Apr-11 13741374 1374 13.74% Redeemed
Mar-11 10221021 1021 10.21% Redeemed
Feb-11 24162416 2416 24.16% Redeemed
Jan-11 16801680 1680 16.80% Redeemed
Dec-10 14111411 1411 14.11% Redeemed
Nov-10 19671968 1968 19.68% Redeemed

 Calculations


Capacity: 20
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/27/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 20 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 352926

Project Info
Liverpool wind farm -up and running

Peel Energy

Peel Wind Power switces on its wind farm in Liverpool

Liverpool's £15bn offshore wind farm plans in Irish Sea
It identifies key assets like the PORT OF LIVERPOOL, Cammell Laird, Port Wirral and the Manchester Ship Canal as being ready and able to provide much of the infrastructure and skilled labour necessary to build and service the new wind farm.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School