Aikengall Wind Farm (Wind , Active) Location in the UK : Scotland, EH42 1SQ Type of installation: Wind on/offshore: on Turbines :16 Capacity : 48 MW Approx Date of 1st power generation: May 2009
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The 16 turbines now constructed at Aikengall Community Windfarm are Vestas 3MW machines. These turbines have a tip height of 125 metres and a generating rating of 3MW. In total the 16 turbines will now produce a maximum of 48MW of clean electricity for the local area.
Community Windpower Ltd had previously proposed building 30 wind turbines – 22 in East Lothian and eight in the Borders – with a ground to blade tip height of 145 metres straddling the two local authority areas at a site to the south-east of the existing 16-turbine Aikengall Community Wind Farm, operational since March 2009.
Model: |
Vestas V90
|
Start Speed: |
3.5
|
Capacity: |
3
|
Optimal Speed: |
15
|
Rotor Diameter: |
90
|
Stop Speed: |
25
|
Hub Height |
80 Avg for all turbines:80
|
Avg. Elevation: |
360
|
Web Page: |
http://www.vestas.com/en/wind-power-plants/procurement/turbine-overview/v90-3.0-mw.aspx#/vestas-univers |
Comment: |
The V90-3.0 MW is designed to be low weight, making it easier to transport and install and reducing foundation costs thanks to its lower load.
|
Aikengall Windfarm near Middle Monynut Farm Cockburnspath EH42 1SQ Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Aikengall IIa Community Wind Farm 81.7 MW
|
Energy Type: |
Wind Onshore |
County: |
Borders Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4591 / C1511
District:
|
Applicant: |
Community Windpower
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
19 |
Turbine Capacity: |
4.2999999999999998 |
Height of Turbines: |
145 |
Calculated capacity: |
81.7 |
Site Address: |
Land North Of Nether Monynut Cottage Cockburnspath Scottish Borders
|
|
|
County: |
Borders Region: Scotland
|
OS Coordinates: |
371793 / 371793
|
Development Status: |
Operational
|
Application Submitted: |
2/1/2014
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/1/2021
|
|
|
Generator Live |
11/1/2021
|
This Record Last Updated: |
9/27/2021
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
4/23/2015 |
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Aikengall II, Wester Dod Community Wind Farm 60.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Lothian Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4332 / A0168
District:
|
Applicant: |
Community Windpower
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
19 |
Turbine Capacity: |
3.2000000000000002 |
Height of Turbines: |
145 |
Calculated capacity: |
60.8 |
Site Address: |
East Lothian.
|
|
|
County: |
Lothian Region: Scotland
|
OS Coordinates: |
369468 / 369468
|
Development Status: |
Operational
|
Application Submitted: |
9/2/2009
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
9/1/2014
|
|
|
Generator Live |
11/15/2017
|
This Record Last Updated: |
10/4/2021
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Aikengall 48 MW
|
Energy Type: |
Wind Onshore |
County: |
Lothian Country: Scotland LPA: East Lothian Council
|
Site ID and Reference: |
4526 / N00542W
District:
|
Applicant: |
Community Wind Power
Application :
05/00216/FUL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
16 |
Turbine Capacity: |
3 |
Height of Turbines: |
125 |
Calculated capacity: |
48 |
Site Address: |
Aikengall
Nr Innerwick
Dunbar
East Lothian
EH42 1SG
|
|
|
County: |
Lothian Region: Scotland
|
OS Coordinates: |
369468 / 369468
|
Development Status: |
Operational
|
Application Submitted: |
2/24/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
11/1/2008
|
This Record Last Updated: |
9/25/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Aikengall II Windfarm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02533NWSC
|
Capacity: |
60500
|
Status: |
Live
|
Accreditation Date: |
2/24/2005
|
|
|
Commission Date: |
10/25/2017
|
|
|
Applicant: |
Aikengall II Community Wind Company Limited
|
Applicant Address: |
Lindsays W S
Caledonian Exchange
EDINBURGH
EH3 8HE
Scotland
|
Address: |
Aikengall II Windfarm
near Middle Monynut Farm
Cockburnspath
EH42 1SQ
Scotland
|
|
Assumptions: Capacity: 60500kW 60.5 MW, Thus over the month Capacity * 720 hours per month = 43560 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/05/2018 | | | 14310 | 23.65% | Issued | 01/04/2018 | | | 18520 | 30.61% | Issued | 01/03/2018 | | | 22131 | 36.58% | Issued | 01/02/2018 | | | 20852 | 34.47% | Issued | 01/01/2018 | | | 25942 | 42.88% | Issued | 01/12/2017 | | | 23449 | 38.76% | Issued | 01/11/2017 | | | 22662 | 37.46% | Issued | 01/10/2017 | | | 424 | 0.70% | Issued |
|
Capacity: 217.6 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 11 m/s (24.607 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 10/9/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|