Lynemouth Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Lynemouth Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Northumberland, Wansbeck    
Type of installation: Wind    on/offshore: on
Turbines :13  Capacity : 26 MW
Approx Date of 1st power generation: February 2012

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Construction on the site began in October 2010 and the turbine installer Windhoist completed the mechanical and electrical installation of the 13 wind turbines in December 2011.

Located approx 2km north of Ashington, Northumberland, adjacent to the Rio Tinto Alcan Lynemouth Smelter, the windfarm will comprise of up to 13 turbines with the capacity to produce 30MW of clean green energy, enough to power over 16,000 homes.

The turbines will stand at 121m (397ft). The nearby smelter chimneys are 80m (262ft) in height while the Alcan power station stack is 114m (374ft) high.

Construction started October 2010, Turbine deliveries to site will commence in summer 2011

 Turbine Make and Specs

Model: Gamesa G87 Start Speed: 6
Capacity: 2 Optimal Speed: 11
Rotor Diameter: 80 Stop Speed: 22
Hub Height 78   Avg for all turbines:78 Avg. Elevation: 21
Web Page: http://tinyurl.com/gamesag80
Comment:

 Address

Lynemouth Windfarm Off A189 Nr Ashington NE63 9AT England

 Associated Companies.

Relationship Company (For: Lynemouth )
OperatorScottish Power Renewables
DeveloperScottish Power Renewables
OwnerScottish Power Renewables

 DECC Data on this Project: Lynemouth :3752

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Lynemouth Windfarm (Resubmission)     26 MW
Energy Type: Wind Onshore
County: Northumberland     Country: England     LPA: DECC (S36)
Site ID and Reference: 3752 / AA008     District:
Applicant: Scottish Power Renewables     Application : CM/20060984 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 13 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 26
Site Address: Land adjacent to Rio Tinto Alcan Smelter, Lynemouth (2km north of Ashington)
 
County: Northumberland Region: North East
OS Coordinates: 429400 / 429400
Development Status: Operational
Application Submitted: 11/20/2006 Planning Permission Granted
Application Determined: Permission refused: 5/11/2007
Construction Date: 7/1/2010    
Generator Live 4/12/2012 This Record Last Updated: 4/24/2012
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 5/11/2007

Site Name: Lynemouth Windfarm     2.4 MW
Energy Type: Wind Onshore
County: Northumberland     Country: England     LPA: Northumberland County Council
Site ID and Reference: 3255 / N00361W     District:
Applicant: Scottish Power Renewables     Application : CM/20060877 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 0.80000000000000004
Height of Turbines: Calculated capacity: 2.4
Site Address: North of Ashington
 
County: Northumberland Region: North East
OS Coordinates: 430000 / 430000
Development Status: Revised
Application Submitted: 10/13/2006 Planning Permission Granted
Application Determined: Permission refused: 5/30/2007
Construction Date:    
Generator Live This Record Last Updated: 9/24/2010
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 5/30/2007

 OFGEM Data on this Project: Lynemouth: Wind : R00265RQEN

Site Name: Lynemouth
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00265RQEN
Capacity: 26000 Status: Live
Accreditation Date: 10/13/2006    
Commission Date: 1/19/2012    
Applicant: ScottishPower Renewables (UK) Limited
Applicant Address: Arnott House 12-16 Bridge Street Belfast BT1 1LB Northern Ireland
Address: Lynemouth Windfarm Off A189 Nr Ashington NE63 9AT England

 Calculations


Capacity: 100
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 22 m/s (49.214 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 100 start: 5 Optimum: 15/ Stop: 22 / wind: / ratio 322040

Project Info
Giant wind turbines are approved

Planning Approval For LYNEMOUTH Windfarm in Northumberland

Scottish Power

NECC Supports LYNEMOUTH Power Station Licence Exemption
NECC has written to the Department of Energy and Climate Change in support of the Secretary of State’s proposal to grant a licence exemption to the proposed new owners of the LYNEMOUTH Power Station.

17ft hedge would hide turbine views - Fenrother
The Energiekontor submission accepts that Moor Edge House would have direct views of the turbines, as well as existing ones at LYNEMOUTH and Bewick Drift,

©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School