Sorry I found no matches, Please try again. 176
vid = 185pws_id = 354225pws_id = 354225
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.118.32.6 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Great Orton Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Great Orton Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Cumbria    
Type of installation: Wind    on/offshore: on
Turbines :6  Capacity : 3.96 MW
Approx Date of 1st power generation: January 2000

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Great Orton II This site, in North Cumbria, holds six turbines alongside an old wartime runway. From 1993-1999 the site housed ten 300kW turbines. Wind Prospect re-powered the site in 1999 for owners Cumbria Wind Farms, being the first in the UK to do so.

 Turbine Make and Specs

Model: Vestas V47/660 Start Speed: 4
Capacity: 0.5 Optimal Speed: 13
Rotor Diameter: 47 Stop Speed: 25
Hub Height 45   Avg for all turbines:45 Avg. Elevation: 67
Web Page: http://www.iufmrese.cict.fr/concours/2002/CG_2002STI_lycee/Pour_en_savoir_plus/Vestas_V47.pdf
Comment:

 Address

Great Orton Airfield Black Brow Wigton Carlisle CA5 6NL England

 Associated Companies.

Relationship Company (For: Great Orton )
OperatorEDF Energy Renewables
OwnerEDF Energy Renewables
DeveloperWind Prospect

 DECC Data on this Project: Great Orton :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Great Orton Wind Farm (Extension)     2.3 MW
Energy Type: Wind Onshore
County: Cumbria     Country: England     LPA: Allerdale Borough Council
Site ID and Reference: 2613 / 07046W3     District:
Applicant: Great Orton Wind Farms (II) Ltd     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 6 Turbine Capacity: 0.40000000000000002
Height of Turbines: Calculated capacity: 2.4
Site Address: Great Orton Airfield, near Wiggonby, Carlisle, Cumbria
 
County: Cumbria Region: North West
OS Coordinates: 331300 / 331300
Development Status: Operational
Application Submitted: 2/26/1998 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 2/1/2000 This Record Last Updated: 10/30/2011
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Great Orton     4 MW
Energy Type: Wind Onshore
County: Cumbria     Country: England     LPA: Allerdale Borough Council
Site ID and Reference: 3491 / 07035W5     District:
Applicant: Cumbria Wind Farms     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 6 Turbine Capacity: 0.66000000000000003
Height of Turbines: Calculated capacity: 3.96
Site Address: Near Carlisle Cumbria
 
County: Cumbria Region: North West
OS Coordinates: 331000 / 331000
Development Status: Operational
Application Submitted: 2/26/1998 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 12/21/1999 This Record Last Updated: 7/13/2006
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Great Orton: Wind :

Site Name: GREAT ORTON AIRFIELD
Generator Type: Wind
Scheme : REGO Generator ID: G00192NWEN
Capacity: 2590 Status: Live
Accreditation Date: 2/26/1998    
Commission Date: 12/1/1999    
Applicant: Great Orton Windfarm ii Ltd
Applicant Address: Cumbria Wind Farms Ltd Bryn Isel 10A Short Bridge St Newtown, Powys SY16 2LW
Address: Great Orton Airfield Black Brow Wigton Carlisle CA5 6NL England
 
Assumptions: Capacity: 2590kW 2.59 MW,
Thus over the month Capacity * 720 hours per month = 1864.8 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/02/2018 191 7.37% Issued
01/01/2018 341 13.17% Issued
01/12/2017 380 14.67% Issued
01/11/2017 392 15.14% Issued
01/10/2017 630 24.32% Issued
01/09/2017 220 8.49% Issued
01/08/2017 313 12.08% Issued
01/07/2017 334 12.90% Issued
01/06/2017 498 19.23% Issued
01/05/2017 323 12.47% Issued
01/04/2017 393 15.17% Issued
01/03/2017 569 21.97% Redeemed
01/02/2017 587 22.66% Redeemed
01/01/2017 389 15.02% Redeemed
Dec-16 0611 611 23.59% Issued
Nov-16 0249 252 9.73% Issued
Oct-16 0208 210 8.11% Issued
Sep-16 0390 392 15.14% Issued
Aug-16 0435 435 16.80% Issued
Jul-16 0347 349 13.47% Issued
Jun-16 0170 173 6.68% Issued
Jun-16 0170 173 6.68% Issued
May-16 0422 422 16.29% Issued
Apr-16 0333 336 12.97% Issued
Mar-16 0348 350 13.51% Redeemed
Feb-16 0568 568 21.93% Redeemed
Jan-16 0628 628 24.25% Redeemed
Dec-15 0960 960 37.07% Redeemed
Nov-15 0820 820 31.66% Redeemed
Oct-15 0193 197 7.61% Redeemed
Sep-15 0135 138 5.33% Redeemed
Aug-15 0316 318 12.28% Redeemed
Jul-15 356354 356 13.75% Redeemed
Jun-15 393391 394 15.21% Redeemed
May-15 623622 622 24.02% Redeemed
Apr-15 373370 373 14.40% Redeemed
Mar-15 766766 766 29.58% Redeemed
Feb-15 480480 480 18.53% Redeemed
Jan-15 728728 728 28.11% Redeemed
Dec-14 726726 726 28.03% Redeemed
Nov-14 244241 243 9.38% Redeemed
Oct-14 544544 544 21.00% Redeemed
Sep-14 107103 107 4.13% Redeemed
Aug-14 436436 436 16.83% Redeemed
Jul-14 240237 240 9.27% Redeemed
Jun-14 9591 95 3.67% Redeemed
May-14 320318 320 12.36% Redeemed
Apr-14 359357 359 13.86% Redeemed
Mar-14 542542 542 20.93% Redeemed
Feb-14 632632 632 24.40% Redeemed
Jan-14 456456 456 17.61% Redeemed
Dec-13 669669 669 25.83% Redeemed
Nov-13 295293 294 11.35% Redeemed
Oct-13 365364 364 14.05% Redeemed
Sep-13 336334 336 12.97% Redeemed
Aug-13 272270 272 10.50% Redeemed
Jul-13 169167 169 6.53% Redeemed
Jun-13 281278 281 10.85% Redeemed
May-13 495495 495 19.11% Redeemed
Apr-13 620620 620 23.94% Redeemed
Mar-13 509509 509 19.65% Redeemed
Feb-13 333333 333 12.86% Redeemed
Jan-13 514513 513 19.81% Redeemed
Dec-12 391391 391 15.10% Redeemed
Nov-12 437437 437 16.87% Redeemed
Oct-12 244242 244 9.42% Redeemed
Sep-12 584584 584 22.55% Redeemed
Aug-12 224222 224 8.65% Redeemed
Jul-12 308305 308 11.89% Redeemed
Jun-12 325323 325 12.55% Redeemed
May-12 310308 310 11.97% Redeemed
Apr-12 405402 405 15.64% Redeemed
Mar-12 371369 371 14.32% Redeemed
Feb-12 533533 533 20.58% Redeemed
Jan-12 721721 721 27.84% Redeemed
Dec-11 892893 893 34.48% Redeemed
Nov-11 527526 526 20.31% Redeemed
Oct-11 629629 629 24.29% Redeemed
Sep-11 506506 506 19.54% Redeemed
Aug-11 273271 273 10.54% Redeemed
Jun-11 225223 225 8.69% Redeemed
May-11 680680 680 26.25% Redeemed
Apr-11 445445 445 17.18% Redeemed
Mar-11 308305 308 11.89% Redeemed
Feb-11 457457 457 17.64% Redeemed
Jan-11 377374 376 14.52% Redeemed
Dec-10 143141 144 5.56% Redeemed
Nov-10 470469 469 18.11% Redeemed
Oct-10 437438 438 16.91% Redeemed

 Calculations


Capacity: 7.92
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/27/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 7.92 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 354225

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School