Loading
Page views this IP this session = 1 of 10 unsubscribed pagesSlieve Divena Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Slieve Divena Wind Farm (Wind , Active) Location in the UK : N.Ireland, Garvaghy in County Tyrone Type of installation: Wind on/offshore: on Turbines :20 Capacity : 48.8 MW Approx Date of 1st power generation: March 2009
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Slieve Divena wind farm, Tyrone, Northern Ireland has an installed capacity of 30MW and was acquired by Infinis from Scottish and Southern Energy plc in April 2011. It has been generating since March 2009 and has a 14 year power purchase agreement.
Slieve Divena Phase II was granted planning consent in 2007 and will be an eight turbine, 20MW (megawatt) extension to SSE's existing 30MW Slieve Divena wind farm. Slieve Divena 2 Wind Farm Feb 2017 8 Turbines added An extension to Proposed Slieve Divena Phase 1 Wind Farm (Planning ref K/2005/ 0597/F) involving an additional 8 wind turbines each with a maximum overall height of 101m, associated transformers, a permanent anemometer mast, site access tracks, upgrading of existing access tracks, a site control room and substation (enlarged), temporary site compound, electrical cabling, road improvement works at the junction of the Radergan Road and Shantavny Road and all ancillary works
Model: |
Nordex N80
|
Start Speed: |
4
|
Capacity: |
2.5
|
Optimal Speed: |
13
|
Rotor Diameter: |
80
|
Stop Speed: |
25
|
Hub Height |
90 Avg for all turbines:89
|
Avg. Elevation: |
262
|
Web Page: |
http://vetropark.org/d/59743/d/nordex_n80-n90_gb.pdf |
Comment: |
N80 suits High Wind Areas
|
Slieve Divena Windfarm 29 Shantavny Road Ballygawley BT70 2EN Northern Ireland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Slieve Divena Phase 2 Wind Farm 18.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Tyrone Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
4054 / N00402W
District:
|
Applicant: |
Scottish and Southern Energy (SSE)
Application :
K/2005/1691/F
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
8 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
20 |
Site Address: |
Slieve Divena Wind Farm Phase II in the townlands of Altcloghfin, Altamuskin and Shantavny Irish, Co Tyrone
|
|
BT79
|
County: |
Co. Tyrone Region: Northern Ireland
|
OS Coordinates: |
69602 / 69602
|
Development Status: |
Operational
|
Application Submitted: |
9/13/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
5/30/2016
|
|
|
Generator Live |
2/16/2017
|
This Record Last Updated: |
11/27/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
2/20/2018 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Slieve Divena Phase 1 Wind Farm 30 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Tyrone Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
3245 / N00325W
District:
|
Applicant: |
Greencoat (formerly Infinis/SSE)
Application :
K/2005/0597/F
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
12 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
30 |
Site Address: |
Slieve Divena
Sixmilecross
Beragh
Ballygawley
County Tyrone
|
|
|
County: |
Co. Tyrone Region: Northern Ireland
|
OS Coordinates: |
69602 / 69602
|
Development Status: |
Operational
|
Application Submitted: |
3/1/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
3/10/2009
|
This Record Last Updated: |
8/23/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Slieve Divena 2 Wind Farm
|
Generator Type: |
On-shore wind (NIRO code = NQ)
|
Scheme : |
RO
|
Generator ID: |
R01069NQNI
|
Capacity: |
18590
|
Status: |
Live
|
Accreditation Date: |
3/1/2005
|
|
|
Commission Date: |
2/16/2017
|
|
|
Applicant: |
Slieve Divena Wind Farm No2 Limited
|
Applicant Address: |
Katherine Marshall, Regulation
Inveralmond House
200 Dunkeld Road
PERTH
PH1 3AQ
Scotland
|
Address: |
Slieve Divena 2 Wind Farm
Shantavny Road
Ballygawley
BT70 2EN
Northern Ireland
|
Site Name: |
Slieve Divena 2 Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00998NWNI
|
Capacity: |
18590
|
Status: |
Live
|
Accreditation Date: |
3/1/2005
|
|
|
Commission Date: |
2/16/2017
|
|
|
Applicant: |
Slieve Divena Wind Farm No2 Limited
|
Applicant Address: |
Katherine Marshall, Regulation
Inveralmond House
200 Dunkeld Road
PERTH
PH1 3AQ
Scotland
|
Address: |
Slieve Divena 2 Wind Farm
Shantavny Road
Ballygawley
BT70 2EN
Northern Ireland
|
|
Assumptions: Capacity: 18590kW 18.59 MW, Thus over the month Capacity * 720 hours per month = 13384.8 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 5221 | 28.08% | Issued | 01/02/2018 | | | 3996 | 21.50% | Issued | 01/01/2018 | | | 6456 | 34.73% | Issued | 01/12/2017 | | | 4774 | 25.68% | Retired | 01/11/2017 | | | 3897 | 20.96% | Retired | 01/10/2017 | | | 5398 | 29.04% | Retired | 01/09/2017 | | | 4323 | 23.25% | Retired | 01/08/2017 | | | 3298 | 17.74% | Retired | 01/07/2017 | | | 3069 | 16.51% | Retired | 01/06/2017 | | | 3069 | 16.51% | Retired | 01/05/2017 | | | 2723 | 14.65% | Issued | 01/04/2017 | | | 2886 | 15.52% | Issued | 01/03/2017 | | | 820 | 4.41% | Issued | 01/02/2017 | | | 94 | 0.51% | Issued |
|
Capacity: 97.6 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/26/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|