Slieve Divena Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Slieve Divena Wind Farm (Wind , Active)

 General Information.

Location in the UK : N.Ireland, Garvaghy in County Tyrone    
Type of installation: Wind    on/offshore: on
Turbines :20  Capacity : 48.8 MW
Approx Date of 1st power generation: March 2009

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Slieve Divena wind farm, Tyrone, Northern Ireland has an installed capacity of 30MW and was acquired by Infinis from Scottish and Southern Energy plc in April 2011. It has been generating since March 2009 and has a 14 year power purchase agreement.

Slieve Divena Phase II was granted planning consent in 2007 and will be an eight turbine, 20MW (megawatt) extension to SSE's existing 30MW Slieve Divena wind farm.
Slieve Divena 2 Wind Farm Feb 2017 8 Turbines added
An extension to Proposed Slieve Divena Phase 1 Wind Farm (Planning ref K/2005/ 0597/F) involving an additional 8 wind turbines each with a maximum overall height of 101m, associated transformers, a permanent anemometer mast, site access tracks, upgrading of existing access tracks, a site control room and substation (enlarged), temporary site compound, electrical cabling, road improvement works at the junction of the Radergan Road and Shantavny Road and all ancillary works

 Turbine Make and Specs

Model: Nordex N80 Start Speed: 4
Capacity: 2.5 Optimal Speed: 13
Rotor Diameter: 80 Stop Speed: 25
Hub Height 90   Avg for all turbines:89 Avg. Elevation: 262
Web Page: http://vetropark.org/d/59743/d/nordex_n80-n90_gb.pdf
Comment: N80 suits High Wind Areas

 Address

Slieve Divena Windfarm 29 Shantavny Road Ballygawley BT70 2EN Northern Ireland

 Associated Companies.

Relationship Company (For: Slieve Divena )
Operatorinfinis
Ownerinfinis
DeveloperRES Renewable Energy Systems Ltd

 DECC Data on this Project: Slieve Divena :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Slieve Divena Phase 2 Wind Farm     18.8 MW
Energy Type: Wind Onshore
County: Co. Tyrone     Country: Northern Ireland     LPA: Northern Ireland Planning Service
Site ID and Reference: 4054 / N00402W     District:
Applicant: Scottish and Southern Energy (SSE)     Application : K/2005/1691/F (Go to search to find Application)
For Wind Farms  
Number of Turbines: 8 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 20
Site Address: Slieve Divena Wind Farm Phase II in the townlands of Altcloghfin, Altamuskin and Shantavny Irish, Co Tyrone
  BT79
County: Co. Tyrone Region: Northern Ireland
OS Coordinates: 69602 / 69602
Development Status: Operational
Application Submitted: 9/13/2005 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 5/30/2016    
Generator Live 2/16/2017 This Record Last Updated: 11/27/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 2/20/2018    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Slieve Divena Phase 1 Wind Farm     30 MW
Energy Type: Wind Onshore
County: Co. Tyrone     Country: Northern Ireland     LPA: Northern Ireland Planning Service
Site ID and Reference: 3245 / N00325W     District:
Applicant: Greencoat (formerly Infinis/SSE)     Application : K/2005/0597/F (Go to search to find Application)
For Wind Farms  
Number of Turbines: 12 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 30
Site Address: Slieve Divena Sixmilecross Beragh Ballygawley County Tyrone
 
County: Co. Tyrone Region: Northern Ireland
OS Coordinates: 69602 / 69602
Development Status: Operational
Application Submitted: 3/1/2005 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 3/10/2009 This Record Last Updated: 8/23/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Slieve Divena: Wind :

Site Name: Slieve Divena 2 Wind Farm
Generator Type: On-shore wind (NIRO code = NQ)
Scheme : RO Generator ID: R01069NQNI
Capacity: 18590 Status: Live
Accreditation Date: 3/1/2005    
Commission Date: 2/16/2017    
Applicant: Slieve Divena Wind Farm No2 Limited
Applicant Address: Katherine Marshall, Regulation Inveralmond House 200 Dunkeld Road PERTH PH1 3AQ Scotland
Address: Slieve Divena 2 Wind Farm Shantavny Road Ballygawley BT70 2EN Northern Ireland

Site Name: Slieve Divena 2 Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G00998NWNI
Capacity: 18590 Status: Live
Accreditation Date: 3/1/2005    
Commission Date: 2/16/2017    
Applicant: Slieve Divena Wind Farm No2 Limited
Applicant Address: Katherine Marshall, Regulation Inveralmond House 200 Dunkeld Road PERTH PH1 3AQ Scotland
Address: Slieve Divena 2 Wind Farm Shantavny Road Ballygawley BT70 2EN Northern Ireland
 
Assumptions: Capacity: 18590kW 18.59 MW,
Thus over the month Capacity * 720 hours per month = 13384.8 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 5221 28.08% Issued
01/02/2018 3996 21.50% Issued
01/01/2018 6456 34.73% Issued
01/12/2017 4774 25.68% Retired
01/11/2017 3897 20.96% Retired
01/10/2017 5398 29.04% Retired
01/09/2017 4323 23.25% Retired
01/08/2017 3298 17.74% Retired
01/07/2017 3069 16.51% Retired
01/06/2017 3069 16.51% Retired
01/05/2017 2723 14.65% Issued
01/04/2017 2886 15.52% Issued
01/03/2017 820 4.41% Issued
01/02/2017 94 0.51% Issued

 Calculations


Capacity: 97.6
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/26/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 97.6 start: 5 Optimum: 15/ Stop: 25.461538 / wind: / ratio 350179

Project Info
Infinis : SLIEVE DIVENA wind farm

Green light for SLIEVE DIVENA wind farm

Airtricity buys 20MW Northern Irish wind farm extension project

(2009) SSE To Acquire SLIEVE DIVENA Phase II Wind Farm Project
Scottish and Southern Energy plc ("SSE"), through its renewable energy development division, Airtricity, has entered into an agreement to acquire the SLIEVE DIVENA Phase II wind farm project

(2011) INFINIS DOUBLES WIND ENERGY CAPACITY
Acquisition of : Dalswinton wind farm (30MW) and Minsca wind farm (36.8MW) in Scotland and SLIEVE DIVENA wind farm (30MW) in Northern Ireland, from Scottish and Southern Energy plc (SSE). The consideration is £173.6 million

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School