Pentland Firth (Wave , Agreed/Planning) Location in the UK : Scotland, Pentland Firth, North Scotland Type of installation: Wave on/offshore: off Turbines :4 Capacity : 6 MW Approx Date of 1st power generation:
/YES
ScottishPower Renewable Energy Limited (hereafter referred to as “ScottishPower Renewables”) is proposing to develop a Demonstration Tidal Array (hereafter referred to as the ‘Tidal Array’) in the Pentland Firth. The proposed Tidal Array would have a capacity in the range of 10-20MW of renewable power for export to the grid and would contribute to meeting the Scottish Government’s targets of providing 50% of Scotland’s electricity generation from renewable sources by 2020.
The Tidal Array would consist of up to 20 submerged demonstration tidal streamgenerating devices. The candidate demonstration tidal device will be based on an existing 300kw prototype device that is currently undergoing a period of research, development and testing. It is envisaged that the existing prototype will be developed to provide a larger scale demonstration device, in terms of potential output (1-1.5MW).
The Pentland Firth fills and drains the North Sea twice a day - water flows of up to 3 million tons a second.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Inner Sound Phase 1A (MeyGen) 6 MW
|
Energy Type: |
Tidal Stream |
County: |
Orkney Islands Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
2436 / B0899
District:
|
Applicant: |
Atlantis Resources
Application :
|
(Go to search to find Application) |
Site Address: |
Pentland Firth and Orkney waters strategic area, between Caithness on the Scottish mainland and the island of Stroma
|
|
KW1 4YL
|
County: |
Orkney Islands Region: Offshore
|
OS Coordinates: |
335503 / 335503
|
Development Status: |
Operational
|
Application Submitted: |
7/19/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/21/2015
|
|
|
Generator Live |
2/20/2017
|
This Record Last Updated: |
11/6/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Inner Sound Phase 1B (Phase 2) (MeyGen) 28 MW
|
Energy Type: |
Tidal Stream |
County: |
Orkney Islands Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4980 /
District:
|
Applicant: |
Atlantis Resources
Application :
|
(Go to search to find Application) |
Site Address: |
Pentland Firth and Orkney waters strategic area, between Caithness on the Scottish mainland and the island of Stroma
|
|
KW1 4YL
|
County: |
Orkney Islands Region: Offshore
|
OS Coordinates: |
335503 / 335503
|
Development Status: |
Planning Permission Granted
|
Application Submitted: |
7/19/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
11/15/2023
|
RO Banding (ROC/MWh) |
2
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|